29.1.2003Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.

Slides:



Advertisements
Similar presentations
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
Advertisements

Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Quality Assurance of Silicon Strip Detectors and Monitoring of Manufacturing Process Thomas Bergauer Institute f. High Energy Physics HEPHY, Vienna SiLC.
IAP-PAI 25/05/20051 CMS Si Rad. Hardness Introduction Damage in Si Neutron tests => Beam => Irrad. Setup.
IEKP - Universität Karlsruhe (TH) 1 Preliminary Pinhole Studies (not final) F. Hartmann IEKP - Universität Karlsruhe (TH) Creation of defined.
Irradiation Workshop KarlsruheA. Furgeri 1 Irradiation in Karlsruhe The Karlsruhe-Probestations Procedure of Irradiation Results Future annealing.
Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.
Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.
1. Common Optics Assembly (COA) Main optics housing riveted on channel housing (with rod) QM delivered
Database entry of irradiation data PROBLEMS New form of DB data One set of data may de-qualify whole batch of sensors  composite of composite action:
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Workshop on CMS irradiation sensor Qualification&Assurance 1 Final set of measurement for the irradiation quality assurance. What test do we need? EFFICIENT.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
General Tracker meetingA. Furgeri 1 Irradiation results and Annealing scenarios for HPK IEKP – University of Karlsruhe Alexander Furgeri
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Test Results Highlighted Material Batches tested 6WA –263(1) 230(1) 265(2) 272(1) 273(3) (3) 305(1) (6) (2) 6WB –278(1) 279(9) 282.
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
Cost Until end 2000:negligible 2001:3 kDM per irrad  Problem –Cyclotron split in commercial and research part. Irradiation facility still a commercial.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Tracker Week April 2002IEKP 1 Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe Frank Hartmann IEKP - Universität Karlsruhe (TH)
Database entry of irradiation data PROBLEMS New form of DB data 1. One set of data may de-qualify whole batch of sensors  composite of composite action:
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Irradiations/ Birmingham Status Paul Dervan The University of Liverpool, UK ATLAS12 Sensor Testing Meeting 16/01/141.
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, out of 23 Status update and Test results for Run2b Si sensors at KSU Sergey.
Frank Lehner U Zurich Characterization of inner layer sensors DØ Inner Layer Sensor Production Readiness Review FNAL, 8/8/2003 M. Demarteau, R. Demina,
4 May 2010 Thomas Bergauer (HEPHY Vienna) Testing of Test Structures in Vienna CMS Sensor-TUPO.
Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University.
Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna.
CMS Sensormeeting : Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) Mechanical Assembly ready Instruments: LCR, Electrometer, PS, Quasistatic.
Examples and disciptions for measurements On pixel and strip sensors.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
UK ATLAS SCT Module Quality Assurance Joe Foster, Manchester University 04 Jan 2005 All results compiled in time for Christmas…
Surface measurements with ATLAS12A Matthew Domingo, Hartmut F.-W. Sadrozinski, Vitaliy Fadeyev Zachary Galloway, Zhijun Liang SCIPP, UCSC 1.
CDF Japan Meeting, Dec 13-14, Run2b Silicon Detector - Overview K. Hara U of Tsukuba Project Status Sensor Prototype: Delivery Testing at U Tsukuba.
Update of CMS Process Quality Control Sensor Meeting, CMS TK Week, , CERN Florence Anna Macchiolo Carlo Civinini Mirko Brianzi Strasbourg Jean-Charles.
Paul Dolejschi Progress of Interstrip Measurements on DSSDs SVD.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Central European Consortium R&D of Central European Consortium (CEC) Status & Plans (Sensor Technology) Georg Steinbrück, Hamburg University Aachen DESY.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
Sensor Testing Phil Turner. LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
Paul Dolejschi Characterisation of DSSD interstrip parameters BELLE II SVD-PXD Meeting.
Procurement Readiness Review : Detector Fabrication, Qualification & Assembly at India M D Ghodgaonkar Electronics Division, BARC, India.
KIT - The cooperation of Forschungszentrum Karlsruhe GmbH and Universität Karlsruhe (TH) Florian Fränkle EPS HEP 2009 Krakow 1 KATRIN: An experiment to.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Surface measurements with gamma radiated ATLAS12A samples Matthew Domingo, Mike Shumko, Hartmut F.-W. Sadrozinski, Vitaliy Fadeyev, Zachary Galloway, Zhijun.
Irradiations / Birmingham Status Paul Dervan, Tony Affolder and Sven Wonsak The University of Liverpool, UK Paul Dervan, Paul Hodgson, Kerry Parker, Matthew.
11/05/2011Sensor Meeting, Doris Eckstein Status of Diode Measurements Measurements by:
INFN and University of Florence Test Beam Meeting Tracker Week
Status of PQC Florence, Strasbourg, Vienna
Quality Control Chamber Production
INFN and University of Florence Test Beam Meeting Tracker Week
Study of radiation damage induced by 26MeV protons and reactor neutrons on heavily irradiated MCz, FZ and Epi silicon detectors N. Manna Dipartimento.
Study of radiation damage induced by 24/c GeV and 26MeV protons on heavily irradiated MCz and FZ silicon detectors N. Manna Dipartimento Interateneo di.
Preparation for Production Testing of EndCup ITk sensors
IEKP - Universität Karlsruhe (TH)
CMS Perugia Modules Production Review
TEC Module Production Overview
CORRELATION BETWEEN LEAKAGE CURRENT AND NOISE
Module Testing in Florence Carlo Civinini INFN-Florence
Hybrid & Module Testing Status
IEKP - Universität Karlsruhe (TH)
Presentation transcript:

Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri

Sensor meetingA. Furgeri 2 QTC Optical inspection of (16/40) –KA-Set 9 (2.) W5B (5/5) –KA-Set 10/1 W5B (3/8) –KA-Set 11/1 W6B (4/10) –KA-Set 11/2 W6B (4/4) Electrical measurements of KA-Set 9 (2.) IV & CV of KA-Sets 10 to 11 (18/35) Summary IQC

Sensor meetingA. Furgeri 3 Optical inspection KA-S9 Batch Delivery W5B KA-S10/1 Batch W5B (3/8) KA-S11/1 Batch W6B (4/10) KA-S11/2 Batch W6B

Sensor meetingA. Furgeri 4 Impressions of opt. inspection IV&CV OK ! ?

Sensor meetingA. Furgeri 5 Summary of optical inspection Scratches ! On surface and on backplane ! – many at the same region of the sensors (handling facility ?) – some are really deep ! Antistatic sheets to small for W5B No  -stamps on backplane No sensor failed

Sensor meetingA. Furgeri 6 IV-curves of KA-Set 9 (2.) KA-S9 Batch Delivery No failures !

Sensor meetingA. Furgeri 7 CV-curves of KA-S9 KA-S9 Batch Delivery

Sensor meetingA. Furgeri 8 Strips of KA-S9 No failures !

Sensor meetingA. Furgeri 9 IV-Curves of KA-Set 10/2 2 failures ! W5B Delivered

Sensor meetingA. Furgeri 10 CV-curves of KA-Set 10/2

Sensor meetingA. Furgeri 11 IV-curves of KA-Set 11/1 No failures ! W6B Delivered

Sensor meetingA. Furgeri 12 CV-curves of KA-Set 11/1

Sensor meetingA. Furgeri 13 IV-curves of KA-Set 11/2 1 failure ! W5B Delivered

Sensor meetingA. Furgeri 14 CV-curves of KA-Set 11/2

Sensor meetingA. Furgeri 15 Summary of QTC KA-S9/2KA-S10/1KA-S10/2KA-S11/1KA-S11/2 Optical inspected 5/53/80/134/104/4 measured5/50/8 10/13 Only IV/CV 4/10 Only IV/CV 4/4 Only IV/CV Failures Opt/IV/ strips 0/0/00/0/00/0/00/0/00/2/00/2/00/0/00/0/00/1/00/1/0 Accepted %

Sensor meetingA. Furgeri 16 IQC Status of cyclotron: –Mechanical part ready –Electrical part problematically Old components (1962) Many improvements (automatic temperature control, flux measurement ) Comparison of Cint-ramps between Louvain and Karlsruhe Statement of main technician: „Ask in 2 weeks“

Sensor meetingA. Furgeri 17 Cint-bumps Effect only on irradiated ST-mini´s seen Caused by low Rint (  that´s the problem) 1 mini sent to Louvain 3 mini´s sent from Louvain to us, but storage over christmas (3 weeks) at unknown temperature

Sensor meetingA. Furgeri 18 Comparison KA-Louvain KA-mini irradiated with p Karlsruhe Louvain Same behavior! But different values !? Strip 92

Sensor meetingA. Furgeri 19 Cint ramps Cint Dissipation

Sensor meetingA. Furgeri 20 Rint ramps 1 8 Maximum of Cint corresponds to Minimum of Rint

Sensor meetingA. Furgeri 21 Ileakage ramps Profil from 400 V Udep

Sensor meetingA. Furgeri 22 Cint ramps (2) In middle of sensor „constant“

Sensor meetingA. Furgeri 23 Rint ramps (2) 1 27 In middle of sensor „constant“ Lowest value ~60MOhm

Sensor meetingA. Furgeri 24 Ileak ramps (2) Ileak ramps (2) -12°C -10°C -11°C Ileak-bumps are no effect of changing temperature during measurement

Sensor meetingA. Furgeri 25 Summary of bumps No temperature effects Still in „Calibration“ between KA and Louvain –Same behaviour –Different absolute values (due to LCR-mode ?)

Sensor meetingA. Furgeri 26 Outlook Comparison between Cp-D mode and Cp- Rp mode in KA Measurement of Louvain irrad. Mini in KA –Comparison of Rint ! –Comparison of Rpoly increase (see Eric) Perhaps irradiations ?