Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES-210834 LCLS Week 4-8 April, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics:

Slides:



Advertisements
Similar presentations
Delta Tau Coordinate Systems and PLCs at Diamond Matthew Pearson Controls Group, Diamond Light Source Overview: Delta Tau Geobrick motor controller Delta.
Advertisements

Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Week/FAC October, 2005 Steve Lewis X-ray Transport, Optics,
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Steve Lewis Direct Imager 06 Dec EPICS Controls Steve Lewis 07 December 2007 LCLS Direct Imager Final Design Review.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
X Ray Transport / Optics / Diagnostics Overview Richard M. Bionta Facility Advisory Committee Meeting April 29, 2004 Richard M. Bionta Facility Advisory.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur X-Ray Optics October 12, 2004 X-Ray Prototype Optics Specifications John Arthur.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
Integrating Acquired Subsystems Bob Dalesio 09/21/99.
Steve Lewis XTOD Controls FDR 14 February 2008 XTOD Instrument Controls Final Design Review Steve Lewis 14 February 2008.
Steve Lewis XTOD Controls FDR 13 March 2008 XTOD Vacuum Controls Final Design Review Steve Lewis/Keith Kishiyama 13 March 2008.
Ethernet (EPICS VLAN) IOC Gauge ControllerMass Flow ControllerTurbo Pump Controller Analog and Digital Signals Beamline Gate Valves Mass Flow Unit Turbo.
Lawrence Livermore National Laboratory This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory.
Donn H. McMahon XTOD Configuration October 24-26, 2005 UCRL-PRES X Ray Transport, Optics, and Diagnostics Overview FAC.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Haller/Lewis XTOD Controls July 27, XTOD Controls Preliminary Design Review Steve Lewis & Gunther Haller.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
Steve Lewis Gas Detector 6 December Instrumentation & Controls Steve Lewis Paul Pax Elden Ables 6 December 2006 LCLS Gas Detector.
Experience Running Embedded EPICS on NI CompactRIO Eric Björklund Dolores Baros Scott Baily.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
18th June 2003 Diamond Vacuum System Steve Singleton 18th June 2003.
Laser Heater Controls Overview 21 August 2008 Matt Boyes Laser Heater Controls Design Overview EPICS IOC Team Meeting Matt Boyes.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
Steve Lewis Controls: Vacuum 5 April, 2005 UCRL-PRES LCLS Week 5 April, 2005 Steve Lewis Vacuum Standards.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
AIP /02 P Bellomo - QE Magnet Power System Upgrade
Experimental Facilities Planning
DOE Review May, 2005 Steve Lewis
EPICS Controls Steve Lewis 13 December 2007
LCLS Ultrafast Science Instruments
Installation of Photon Beam Transport to FEH
X-Ray Transport, Optics, and Diagnostics WBS Alan J
DOE Review 11 May 2005 Stephen A. Lewis
FEE Diagnostics and Commissioning
LCLS Week 4-8 April, 2005 Steve Lewis
DOE Review 7-9 February, 2006 Steve Lewis
Linac Coherent Light Source Project Update
LCLS Lehman Review February 7-9, 2005
Lehman Review: XTOD Beam Transport
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS Photon Systems Overview
DOE Review 11 May 2005 Stephen A. Lewis
Presentation transcript:

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Week 4-8 April, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics: Controls Status

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES Layout Front End Enclosure Fast Close Valve Slits Attenuators Shielding FEL Measurements & Experiments: Low Power Imaging High Power Imaging Spectrometer Calorimeter Flipper Mirror Experiments Optics Structual Bio Nano-scale Femtochem FEE NEH FEH Tunnel Experiments: Optics Warm Dense Matter Each hutch is 10 m long Experiments: Atomic Physics

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES Major Effort Areas Getting an accurate count of all devices Naming devices (and extending SLC convention) Aligning XTOD controls devices with LCLS global standards Reviewing cost+schedule Installing EPICS at LLNL

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES Counting Devices Layout and instrument list has changed since original design Original design was not “EPICS-aware” Need block diagram or even one-line diagram to accurately define PLC, IOC and other controls- specific components LCLS-wide standards are (just) now being set All of above are basis for accurate cost+schedule

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES Naming Devices Will conform to (and extend) SLC conventions Especially for “SLC-aware” devices Allows uniform notation on spread-sheets, one-line diagrams, as well as EPICS configuration Implicitly forces accurate counting

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Global Standards Safety must be engineered in Commerical products are one way to ensure this (UL, CE, …) Initial Q/A will take place at LLNL for many items

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Global Standards… Motor/Encoder chains: OMS58 in VME+transition card+power “brick”: 3 vendors; extra box+cables; great reuse of EPICS practice; parts long-lived Newport XPS single-box: turnkey; TCP/IP field- bus; new driver (and motor record?); rapid evolution of product likely Other?

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Global Standards… Vacuum/Gas: Controllers & Architecture “Smart” controllers + inter-controller wiring + serial to EPICS Wiring complexity; less global integrity “Dumb” controllers+PLC+ Ethernet/IP to EPICS Global integrity; simple wiring ControlLogix vs. FlexLogic Trade-offs in cost, need for wire-centers, availability of EPICS driver

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Global Standards… Choices for Gauges MKS-937A w/317-CEP and 422-CCG 15msec response option Other? Choices for Ion Pumps Dual; Quad; ? MPS-2 SafeCONN Kaiser StarCell Other?

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES Reviewing Cost+Schedule Accurate device count supports: I/O hardware and cabling costs Approx $200K to be added for master PLCs Configuring+Commissioning Effort Approx 1500 hours to be added for Tunnel Fixed costs as well: Server for LLNL prototyping Licenses (PLC…) Any new drivers

Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES EPICS at LLNL Set up a server RH Linux or MacOS X? Keep CVS at SLAC Intellectual property issue? Borrow small VME crate, CPU, EVR and EVG from SLAC Gas Attenuator prototype is first application First use of PLC Will train LLNL staff