Assignment 1 A mining company has applied for a permit to mine magnetite on the Livingstone Ridge in southwestern Alberta. Magnetite is used in the refining.

Slides:



Advertisements
Similar presentations
Assessing effects of Columbia River Basin anadromous fish flow management on the aquatic ecology of the Henrys Fork watershed A Proposal By The Henrys.
Advertisements

Low Flow Calculations In NPDES permits the permitted industry or municipality must meet certain requirements with regards to the toxicity of their effluent.
Watersheds and the Hydrologic Cycle
Large urban centers have begun to worry about the sustainability of their water supplies Watershed.
R AINFALL -R UNOFF M ODELING O F W ADI Z IMAR. Prepared by Ahmad Tallal Abu-Hamed Mohamed Nemir Mohsen Osama Omar Nazzal Under the direction of Dr. Sameer.
Introducing Web-Based Decision Tools for Environmental Management To Lake Michigan Communities Bernie Engel Long-Term Hydrological Impact Assessment (L-THIA)
Engineering Hydrology (ECIV 4323)
Applications of Scaling to Regional Flood Analysis Brent M. Troutman U.S. Geological Survey.
Design of Open Channels and Culverts
Review and Rating Discharge Measurements David S. Mueller Office of Surface Water March 2010.
ESTIMATING THE 100-YEAR FLOOD FORDECORAH USING THE RAINFALL EVENTS OF THE RIVER'S CATCHMENT By Kai TsurutaFaculty Advisor: Richard Bernatz Abstract:This.
Surface Water Hydrology Summarized in one equation V = velocity, fps or m/s A = channel cross-sectional area, sf or m 2.
Assignment 2 -Lake Watersheds and morphometry Elkwater lake is a small lake situated near Cypress Hills Provincial Park. The watershed is mostly forested.
Assignment 2 -Lake Watersheds and morphometry Elkwater lake is a small lake situated near Cypress Hills Provincial Park. The watershed is mostly forested.
Syphon Syphon is a structure constructed at the intersection of two waterways. Syphon carries the discharge of one waterway under the other. Usually the.
How to calculate stream order Another way to look at a drainage system is to treat it as a hierarchical network Stream order Stream order increases by.
1 km x Outline the Watershed of this small tributary to Threepoint Cr. at the point x First study the altitudinal contours Locate the 5000’ 5500’ & the.
Large urban centers have begun to worry about the sustainability of their water supplies Watershed.
1D SEDIMENT TRANSPORT MORPHODYNAMICS with applications to RIVERS AND TURBIDITY CURRENTS © Gary Parker November, CHAPTER 11: SAMPLE CALCULATION FOR.
Training on Roads for Water and Resilience. ROADS CROSSING RIVER BEDS.
Analyses of Rainfall Hydrology and Water Resources RG744
Module 10/11 Stream Surveys Stream Surveys – February 2004 Part 3 – Hydrologic Assessment.
1 Mixing engineering and biology. Where Fish Passage is required Connectivity is required across the landscape wherever there are fish. Fish and fish.
Regression Analysis Regression analysis is a statistical technique that is very useful for exploring the relationships between two or more variables (one.
Basic Hydrology & Hydraulics: DES 601
Abstract Background Conclusion Stream Bed Morphology and Discharge Rates of Deckers Creek Data was collected at 5 different points along a 100 meter transect.
Green tools for urban climate adaptation GreenClimeAdapt Project, Malmö (Sweden) STREAM Policy Seminar 1 st of November 2011, Amsterdam Stefan Milotti,
CE 3354 ENGINEERING HYDROLOGY Lecture 6: Probability Estimation Modeling.
Project Our group collaborated with students at the University of Zacatecas (UAZ) to accomplish the following: 1- Create an accurate hydrologic model which.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Soil Movement in West Virginia Watersheds A GIS Assessment Greg Hamons Dr. Michael Strager Dr. Jingxin Wang.
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
Modes of Sustainability Definition  In text  In aquifer-storage terms  In water-budget terms  In physical changes at the river (natural side)
North Turkey Creek Watershed. Watershed (Drainage Basin) The area of land that is drained by a river and its tributaries. Surrounded by higher terrain.
DES 606 : Watershed Modeling with HEC-HMS Module 8 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Review of SWRCB Water Availability Analysis Emphasis on Dry Creek Water Availability Analysis.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
Warmup How many river basins are in North Carolina? Which two river basins border Apex? Write two facts about your river basin from Friday.
LAKE D.AREA (km 2 ) NPS loadings (kg/yr) sewage (kg/yr) precipitation (kg/yr) residential (kg/yr) Pload Int (kg/yr) cleared % Moose
Estimating the Volume of Fine-Grained Sediments Behind Four Low-Head Dams, Kalamazoo River, Michigan. In cooperation with the Michigan Department of Environmental.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
CE 3354 Engineering Hydrology
VFR Research - R. Hudson VFR Research Section Introduction to Hydrology Dr. Rob Hudson, P.Geo.
PATRICK SEJKORA NOVEMBER 17, 2009 GIS IN WATER RESOURCES Yellowstone Fires and Their Hydrologic Effects.
AUSTRALIAN POPULATION DISTRIBUTION. Australia’s Population Distribution Australia has an uneven population distribution Australia's average population.
N.L Mufute , LWRM, MSU / PRELIMINARY DESIGN STEPS AND SPRINKLER SELECTION –EXAMPLE ON PERIODIC-MOVE SYSTEMS N.L.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Hydrological Forecasting. Introduction: How to use knowledge to predict from existing data, what will happen in future?. This is a fundamental problem.
Global rivers that will be observed by SWOT and their characteristics K. Andreadis 1, L. Clark 1, M. Durand 2, S. Biancamaria 4, E. Rodriguez 3, D. Lettenmaier.
Chapter 21 Water Supply, Use and Management. Groundwater and Streams Groundwater –Water found below the Earth’s surface, within the zone of saturation,
 Mining is extracting ore or minerals from the ground  An ore is a natural material with a high concentration of economically valuable minerals that.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Sampling: Distribution of the Sample Mean (Sigma Known) o If a population follows the normal distribution o Population is represented by X 1,X 2,…,X N.
Predicting the hydrologic implications of land use change in forested catchments Dennis P. Lettenmaier Department of Civil and Environmental Engineering.
Analyses of Rainfall Hydrology and Water Resources RG744 Institute of Space Technology October 09, 2015.
Cudworth Professor of Urban Water Systems
Basic Hydrology & Hydraulics: DES 601
N.L Mufute , LWRM, MSU / PRELIMINARY DESIGN STEPS AND SPRINKLER SELECTION –EXAMPLE ON PERIODIC-MOVE SYSTEMS N.L.
Statistical Process Control (SPC)
Chapter 10 - Monte Carlo Simulation and the Evaluation of Risk
Hydrology CIVL341.
Low Flow Calculations In NPDES permits the permitted industry or municipality must meet certain requirements with regards to the toxicity of their effluent.
Floods and Flood Routing
Hydrologic Engineering
1. Engineering Hydrology by H.M. Raghunath
Hydrology CIVL341 Introduction
J. Todd Petty, Richard Herd, Paul Ziemkiewicz,
Chapter Four RUNOFF When a storm occurs, a portion of rainfall infiltrates into the ground and some portion may evaporate. The rest flows as a thin sheet.
Chapter 8, part C..
Presentation transcript:

Assignment 1 A mining company has applied for a permit to mine magnetite on the Livingstone Ridge in southwestern Alberta. Magnetite is used in the refining of coal, and the location near the Sparwood area of BC would make this site very economical. The company proposes to extract 10,000 m 3 /water per year from the small stream illustrated on the accompanying map in order to wash the magnetite ore that they will excavate. They argue that this water demand constitutes an insignificant fraction of the creek’s annual discharge. 1.) Outline the watershed of the creek shown, in relation to the site that the company proposes to extract water from (x) and calculate its area in km 2. (4pts) 2.) Assuming a runoff coefficient of 100 mm per year (0.1 m) what would be the expected annual average discharge at the proposed site? What percentage of the average annual discharge are they proposing to draw?(3pts) 3.) If the creek is 2m wide and has a mean depth of 0.1 m (in an average yr) before water is removed from it, what would be its average velocity (m/sec). Assuming that the width and depth don’t change significantly what would be its average velocity after water is removed from it at the proposed rate.(4pts)

x

4.) If we assume that the annual pattern of discharge of the creek follows the same relative pattern as Gold Creek, near Frank in the Crowsnest Pass, and we assume that the operation wishes to extract water at the same rate year round, what fraction of the creek’s discharge would they be removing during June, during October? (4pts) 5.) If we assume that the between year variability in discharge of the creek reflects that of the region as a whole, and is similar to Gold Creek, what % of the creek’s discharge would the operation be removing in: a.) the driest year in 100 b.) the driest year in 20 c.) the driest year in 10 Use the probability paper provided to plot the probability distribution of the creek’s discharge, and use this to make the above estimates. (10pts)

Probability (percentiles) Discharge m3/sec o

6.) Suppose that the regional fisheries biologist estimates that 1 year in 20, the creek is so dry that it either dries up, or has too little water to allow the resident cutthroat trout to survive the winter. From the probability plots that you have constructed, estimate the frequency of such die-offs, if the proposal is approved. (7pts) 7.)In order to transport workers and machinery into the site the company proposes to build a small road at the location shown. a.) Roads are often badly designed in that they don’t allow for sufficient drainage. Briefly outline some of the potential ecological problems that this road could present to the stream habitat. b.) At which sites should culverts be located, and how much discharge should each one be able to handle given that the road is expected to last 40 years. Explain. c.) What are some of the factors that a fisheries biologist should consider if consulted in regard to placement and installation of such culverts on first and second order streams. (10 pts) 8.) Although some of the tools we use to make predictions are fairly crude, explain why it is necessary to have such tools in dealing with proposed human activities on the landscape and their hydrological and ecological consequences.(2pts)