Jw consulting SAP R/3 QM Workshop Rheinfelden 28.06.2000 Kurt Fantes Prototyp jw LIMS.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Welcome PM/CS - ADHOC-e-engll. bi-tuned-ADHOC Examples Saager Management Consultants Karlstraße 5 a D Barsinghausen Tel.: +49 (0)5105 /
Welcome to jw Consulting 28 June 2000 Axel Röthemeier jwconsulting Page 1 / 12.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Intracompany Stock Transfer Scenario Overview
Chapter 15: Packaged Software and Enterprise Resource Planning
© Prentice Hall CHAPTER 10 Alternative Approach: Purchasing Systems.
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
DEPARTMENT OBJECTIVES 1. To Identify and deploy information technology to meet business objective at CKPL. 2.To Provide support to users for systems usage.
#4502 – Streamlining the Physical Inventory Process Using a Custom Solution.
Unit 17 - Rules -. July 2007© SAP AG and The Rushmore Group, LLC Business Process Integration Rules SD.
©© 2013 SAP AG. All rights reserved. Quality Assurance (Unplanned Inspections) Scenario Overview Initiating Inspections Processing Inspections Scenario.
Process Management and Control and Physical Inventory SAP Implementation
Chapter 6 Database Design
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Copyright © 2003 Americas’ SAP Users’ Group QM Implementation – Tips & Tricks Chet Gandhi Consultant Session Code: 3903 Monday May 19 th, 1.50 – 2.20 pm.
Copyright © 2003 Americas’ SAP Users’ Group Industrial Hygiene Measurement Management Project at BASF AG Prof. Herbert Bender, PhD May
Astrix Technology Group Extending The LIMS To Benefit External Stakeholder Groups Robert D. Walla Presented At Pittcon 2006 Orlando, FL.
Concepts of Database Management Seventh Edition
Introduction to SAP R/3.
SAP R/3 Materials Management Module
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
Production Planning Processes Theories & Concepts
Documentation –Part 2 Basic Principles of GMP Pharmaceutical Quality,
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 3 – 10 – 2011 College Of Computer Science and Information, Information Systems.
RLINK QM, SAP Integration PI Tools for Analysis Dr. Gretchen Schwenzer, OSI Software.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Concepts of Database Management Eighth Edition
IST 210 Database Design Process IST 210 Todd S. Bacastow January 2005.
Week 4 Lecture Part 3 of 3 Database Design Samuel ConnSamuel Conn, Faculty Suggestions for using the Lecture Slides.
Installation and Maintenance of Health IT Systems
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Important informations
Information: Policy, Strategy and Systems Module Overview
Project Presentation eProcurement System. M.TECH S16- Team S03 Institute of Systems Science Table of Content Project Background Project Requirement User.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Tip’s for Success !!! Oracle Applications 11i Upgrade.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Free-range views of the properties based on various criteria Maintenance with automatic appointment- and event-driven triggering and printout Covering.
Requirements Engineering Requirements Validation and Management Lecture-24.
Module 12 - part 2Slide 1 of 23 WHO - EDM Basic Principles of GMP Documentation Part 2 Part One, 14.
3 rd Party Registration & Account Management SMT Update To AMWG February 23, 2016.
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
IST 210 Database Design Process IST 210, Section 1 Todd S. Bacastow January 2004.
SAP R/3 User Administration1. 2 User administration in a productive environment is an ongoing process of creating, deleting, changing, and monitoring.
SAP WM ONLINE TRAINING Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA
Business and Systems Aligned. Business Empowered. TM Global ERP Projects Author:Andrew McCumiskey Presentation for:University of Birmingham Course: Commercial.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
LO170 Quality Management 咨询顾问 Introduction of the QM-Modul XXX
SAP QM Online Training by SAP QM Professional Trainers in India | UK | USA Online | classroom| Corporate Training | certifications | placements| support.
 Andersen Consulting IM01 - Organizational Structure & Master Data in IM November, 2000.
Quality Management Demonstration
Contact Us : Online | classroom| Corporate Training | certifications | placements|
PP/MM Module User Training SAP 教材. Overview Organization and Business Process.
 TATA CONSULTANCY SERVICES MM - Inventory management.
Flya Kite Introduction to SAP
Intracompany Stock Transfer Scenario Overview
Documentation –Part 2 Basic Principles of GMP Pharmaceutical Quality,
Chapter 6 Database Design
Lecture LOs a) Appreciate the (complexity) course, in general..
ERP Systems Lecture # 7.
Intracompany Stock Transfer Scenario Overview
Intracompany Stock Transfer Scenario Overview
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
SAP QM Prepared by Lavanya.M.
Presentation transcript:

jw consulting SAP R/3 QM Workshop Rheinfelden Kurt Fantes Prototyp jw LIMS

Why SAP R/3 ? Kurt Fantes Prototyp jw LIMS

Requirements to an integrated SAP R/3 LIMS l Support of all requirements l short term availability l state of the art concept l good cost-benefit relation l easy to use l extendable Kurt Fantes Prototyp jw LIMS

Requirements to an integrated SAP R/3 LIMS l Logistics (I) –in process inspections –final inspections –automatic creation of quality certificates –Special inspections (unplanned) –automatic shelf life expiration monitoring –automatic vendor evaluation Kurt Fantes Prototyp jw LIMS

Requirements to an integrated SAP R/3 LIMS l Logistics (II) –generation and processing of l vendor complaints l customer complaints l internal problem messages –generation and administration of specifications Kurt Fantes Prototyp jw LIMS

Requirements to an integrated SAP R/3 LIMS l Research & Development –sample management –linking of related documents –inspection of competitor products –Stability inspections (in progress) –Integrated project management with module PS (in progress) Kurt Fantes Prototyp jw LIMS

Requirements to an integrated SAP R/3 LIMS l Additional (I) –Environmental l sample management l periodic, automatic creation of samples l reporting –CO l automatic posting of appraisal costs Kurt Fantes Prototyp jw LIMS

Requirements to an integrated SAP R/3 LIMS l Additional (II) –Plant maintenance (PM) l Test equipment administration in QM –Calibration planing –Calibration order –Calibration inspection Kurt Fantes Prototyp jw LIMS

Requirements to an integrated SAP R/3 LIMS l Additional (III) –Data security –Archiving –Authorisation –Audit-Trail-Function –Performance Kurt Fantes Prototyp jw LIMS

Success factors l Based on a tested prototype l Industry sector know-how l Experienced consulting team l Maximum support by customer Kurt Fantes Prototyp jw LIMS

Development principles (I) l No modifications l no influence on release upgrades l Effective modelling of complex technological processes l Separation of user interface from data and function l User defined menus and interfaces l Detailed function- and user documentation Kurt Fantes Prototyp jw LIMS

Development principles (II) l Integration of processes (f.e. LIMS) –no bi-directional interfaces –standardised integration of pre- and post l System networks (ALE/IDOCs) –Producer (f.e. chemical plant) –Service (f.e. centralised purchasing) –Customers, vendors Kurt Fantes Prototyp jw LIMS

Project Sivento Chemie Rhf. GmbH (I) l Handling of all kinds of inspections –in process inspections –final inspections –environmental inspections –research & development inspections –special inspections Kurt Fantes Prototyp jw LIMS

Project Sivento Chemie Rhf. GmbH (II) l Sample registration l Sample management – Resource management – Multiple reporting functions l Audit-Trail-Function l Automatic generation of quality certificates Kurt Fantes Prototyp jw LIMS

Projekt Sivento Chemie Rhf. GmbH (IV) l renewal of usage decision when specifications change l for unplanned (special) samples all parameters (unit of measurement, inspection method,...) can be changed until results recording inspection scope (inspection plan) for unplanned samples can be copied from all existing specifications or other samples Kurt Fantes Prototyp jw LIMS

Projekt Sivento Chemie Rhf. GmbH (V) l Usage decision for all specifications of a substance (certain chemical compound) l integrated change function for shelf life dates Kurt Fantes Prototyp jw LIMS

SAP R/3 QM Workshop Kurt Fantes Prototyp jw LIMS specifications are realised as SAP inspection plans all relevant Data concerning the specification is maintained here specifications can be linked to any SAP object Customers Customer groups Countries.....

SAP R/3 QM Workshop Kurt Fantes Prototyp jw LIMS Consideration of specifications through all processes allocation of substance / specification to customer automatic determination of specification in sales order (if not unique, pop-up for selection) complete UD-Info for all specifications in all stock reports specification and / or customer as additional selection criterion in all stock reports automatic batch determination automatic usability check for all batches in delivery

SAP R/3 QM Workshop Kurt Fantes Prototyp jw LIMS Inspection certificate only one profile per certificate category necessary (Exception => certificates with data from process chain) Add-Ons and additional functions available manual with additional data summaries of inspection results weekly or monthly certificates with statistical values

Project Sivento Chemie Rhf. GmbH (VI) l Extensions –automatic, periodic creation of samples –variable validation of results and samples –Extension of organisational structures l inspection in several laboratories processing of external assigned inspections Kurt Fantes Prototyp jw LIMS

Advantages of the integrated SAP-LIMS (I) l safe start by basing on a tested prototype l short implementation times l individual functionality l avoidance of interfaces l no redundant data l one database Kurt Fantes Prototyp jw LIMS

Vorteile des integrierten SAP-LIMS (II) l no additional software l no additional hardware l Individual interfaces, but standard SAP design l Individual operation Kurt Fantes Prototyp jw LIMS