ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company.

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
Process Selection.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 How to Achieve High Reliability, Availability, and Maintainability L. Waganer June 2007.
IPCC Synthesis Report Part IV Costs of mitigation measures Jayant Sathaye.
FNSF Blanket Testing Mission and Strategy Summary of previous workshops 1 Conclusions Derived Primarily from Previous FNST Workshop, August 12-14, 2008.
Overview of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego 8 th International Symposium on Fusion Nuclear Technology Heidelberg, Germany 01–
ARIES Project Meeting, L. M. Waganer, Jan 2009 Page 1 Debrief of Dr. Whelan’s TRL and Aerospace & R&D Risk Management Debrief of Dr. Whelan’s TRL.
To drill or not to drill? Nuclear Energy FIGURE 16: Structure of the atom.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Systems Code Cost Algorithm Status and Planned Enhancements L. Waganer/ L. El-Guebaly 3-4 April.
The Tokamak "тороидальная камера в магнитных катушках" Invented in the 1950s Leading candidate for fusion energy production Startup Plasma heating –Ohmic.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
FY 2000 System Studies Activities Farrokh Najmabadi VLT/FWP Meeting April 6-9, 1999 OFES Headquarters, Germantown Electronic copy:
September 6-7, 2007/ARR 1 Power Management Technical Working Group: Status and Documentation A. René Raffray Mark Tillack University of California, San.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Summary Report of the Energy Issues Working Group Organizer: Farrokh Najmabadi Covenors:Jeffrey Freidberg, Wayne Meier, Gerald Navaratil, Bill Nevins,
Thoughts on Fusion Nuclear Technology Development and the Role of ITER TBM Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
IE 3265 Production & Operations Management Slide Series 2.
The current overall EU policy framework: Europe 2020 strategy, Innovation Union and Energy 2020 Strategy On March 2010, the Commission presented a Communication.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
MODULE “STRATEGY DEVELOPMENT”
EV – HV (1) General description Market –failure in the past for EV –Public acceptance hard to determine Technology –A continuum from hybrid to full EV.
Nuclear Energy in the 21 st Century BEIJING 2009 International Ministerial Conference April 2009.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
New Nuclear Power Plants Need and Status ASQ-EED 31 st Energy & Environmental Division Conference September 12, 2004 Adrian Heymer, NEI
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
August 2007 Kuala Lumpur Convention Centre, Malaysia August 2007 Kuala Lumpur Convention Centre, Malaysia Theme : Innovating Towards Sustainability.
Identifying Source Reduction Opportunities and Engineering Trade-Offs Kenneth R. Stone Engineering Trade-Offs Team Leader Kenneth R. Stone Engineering.
Overview of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego US-Japan Workshop on Power Plants Study and Related Advanced Technologies with.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
Engineering Deans Institute 2015 The Future of Nuclear Energy Dr. Terry A. Michalske Laboratory Director April 13, 2015.
1 Future Powertrains Global Opportunities & Challenges Sue Cischke Vice President of Environmental & Safety Engineering January 14, 2004.
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
An Expanded View of RAMI Issues 02 March 2009 RAMI Panel Members: Mohamed Abdou (UCLA), Tom Burgess (ORNL), Lee Cadwallader (INL), Wayne Reiersen (PPPL),
Opportunities and Challenges Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
Are You Ready for an SIS? What to do before starting on your SIS…and after it’s installed March 24, 2009.
ARIES “Pathways” Program Farrokh Najmabadi University of California San Diego ARIES brainstorming meeting UC San Diego April 3-4, 2007 Electronic copy:
BY: WALLACE M. MAYS W M MINING COMPANY. South Inkai under construction.
Clean and Diversified Energy Initiative Rich Halvey Western Governors’ Association Legislative Forum Monterrey, N.L., Mexico.
State and Business Action on Climate Change Judi Greenwald Director of Innovative Solutions Pew Center on Global Climate.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
ARIES- Pathways, October 25-26, 2010 Bethesda, MD Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting October 2010.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION ARIES Pathways Study Kick-off Meeting Ken Schultz 3 April 2007 Determining the.
Briefing on the Pebble Bed Modular Reactor Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
Advanced Design Activities in US Farrokh Najmabadi University of California, San Diego Japan/US Workshop on Fusion Power Plants & Related Technologies.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
Nuclear Power Economics and Project Structuring 2017 Edition
Camera PDR/CD1 Planning 19 September 2008
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
Operations Technical Working Group
The European Power Plant Conceptual Study Overview
Application of Systems Engineering to Nuclear Fusion projects
Overview of the ARIES “Pathways” Program
Coal – security of coal supply considerations of EURACOAL
Advanced Design Activities in US
Introduction DEFINATION :-
Controlling Project Cost and Schedule
US/Japan Workshop on Fusion Power Plant Studies
TWG goals, approach and outputs
How To Save Big Bucks with Modeling and Simulation
Presentation transcript:

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company 3-4 April 2007 UCSD Project Meeting

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 2 Timing of The Next Step Minimal Risk Approach Starting basis will be reference ITER/DIII-D physics and engineering design and machine performance results (Design = 6 y, Lic = 2 y, Constr = 8 y, approximate) assuming positive results Assume TNS and Demo design, licensing, and construction take approximately the same as ITER construction and operation for each phaseconstructionoperation Further, the economic and political climate must be favorable To start Demo construction by 2050 and operation before 2060, the TNS must start design by 2023, construction by 2031, and operation by 2039 ‘10‘20‘30‘40‘50‘60 Start Constr Start Power Core Constr H PlasmaD DT Plasma 400 sec Current Drive Q = 5: 500 MW Extended Operation ITER ConstructionConstruction Design L Construction Operation Design L Construction Operation Start TNS Design Start Demo Design TNSDemo ITER Operation 3 y typ

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 3 Timing of The Next Step Minimal Technical Risk - Aggressive Design, Construction Schedule Assume TNS and Demo design, licensing, and construction phases can be shortened by 25% (16 y to 12 y), but maintain same interval between machines This allows Demo to start construction by 2044 and operation before 2050; also TNS can start design by 2023, construction by 2029, and operation by 2035 (compared to 2060 in base case) This is really aggressive for design, licensing, and construction, especially in the US. ‘10‘20‘30‘40‘50‘60 Start Constr Start Power Core Constr H PlasmaD DT Plasma 400 sec Current Drive Q = 5: 500 MW Extended Operation ITER Start TNS Design Start Demo Design TNSDemo Design L Construction Operation Design L Construction Operation

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 4 Timing of The Next Step Higher Technical Risk Approach – Nominal Design, Construction Schedule ‘10‘20‘30‘40‘50‘60 Start Constr Start Power Core Constr H PlasmaD DT Plasma 400 sec Current Drive Q = 5: 500 MW Extended Operation ITER Design L Construction Operation Design L Construction Operation Start TNS Design Start Demo Design TNSDemo Assume TNS and Demo design, licensing, and construction phases are nominal Shorten the time between start of operation and start of next machine design to 1 year – higher technical risk solution This allows Demo to start construction by 2046 and operation before 2054; also TNS can start design by 2021, construction by 2029, and operation by 2037 (compared to 2060 in base case) This is really aggressive for design, licensing, and construction, especially in the US. 1 y typ

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 5 Discussion On Timing Options Nominal approach seems too long for Demo Minimal or no basis for shortening design, licensing or construction times Minimal overlap of operational time with design introduces a significant technical risk if the TNS and Demo design depends on prior results. IF TNS and Demo designs are significant advancements from prior designs AND there is confidence in the ITER or TNS yet-to-be-proven results, then the risk may be acceptable.

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 6 Determining the Technology, Physics, Industrial and Organizational Needs Current state: The most relevant tokamak experimental reactor is being built outside the US –Limited technology transfer back to US –Minimal or no infrastructure to develop a technology, physics, industrial, or organizational basis to develop, build or operate a large facility –DIII-D will probably not be operating in a suitable time frame to influence the TNS preliminary and final design and will not provide operating experience –The US experience hiatus to TNS is on the order of years since a large US fusion experiment has been built. Realization: Our study can initiate efforts directed toward certain technologies, but TNS will be a green- field approach with new people developing the design.

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 7 Assumptions, Groundrules, Definitions ITER: It is successful; US in for a 10% role; results will be shared; but technology basis will be generally specific to country interests Post-ITER: All development work will be country-based; limited partnerships may occur to foster mutual, high cost and high risk developments US Demo: –Will be full or nearly-full sized (1-1.5 GWe) electrical power plant to demonstrate economic, safe, and reliable power production –Funded by: a) US Gov, b) Consortium of utilities, or c) combination –Operated by: a)…., b)….., or c)…… The TNS: –Will be funded and operated by the US Gov or a limited partnership of a few governments –Role of ARIES-TNS will be(?) to identify needs to be satisfied by the operation of a TNS to reduce the performance, programmatic, and operational risks for Demo

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 8 Likely Demo Metrics Cost of Electricity = Safety –No evacuation plan required (no runaway plasma condition) –Minimal hazardous materials –Low tritium inventory –Minimal pressurized gases –etc Environmental Impact –Low level radioactive hazardous waste, high volume –Minimal conventional hazardous waste –Nominal site impact –Minimal impact on limited resources (Lithium, Beryllium) –No CO 2 releases –Minimal traffic impact (all fuel processing on site) Balance of Trade Benefits (reduced oil dependency) (Gross Electric x Effcy – Recir Power) x Avail (D + ID Capital Cost) x FCR + Fuel + O&M

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 9 Likely TNS Metrics Reduction of Technology risk (engineering, manufacturing, operational, applicability of design approach, software, and hardware to Demo) Reduction of Physics risk (beta, control, disruptions, applicability of physics basis to Demo ) Reduction of Industrial Risk (involvement and maturation of infrastructure, limited financial risk, likelihood of a significant role) Reduction of Organizational Risk (management of large multi-national organizations) Cost of Electricity projection (all factors considered) Safety Impact demonstration Environmental Impact demonstration Balance of Trade Benefits demonstration of validity Supports US Economic Trade Policies Supports US and World Environmental Initiatives

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 10 Backup Slides

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 11 Present ITER Construction Schedule Previous Slide

ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 12 Planned ITER Operational Schedule Previous Slide