Chapter 9 PLANNING TOOLS AND TECHNIQUES © Prentice Hall, 2002 9-1.

Slides:



Advertisements
Similar presentations
HEALTH PLANNING AND MANAGEMENT
Advertisements

Planning Tools and Techniques
Chapter 20 CONTROLLING FOR ORGANIZATIONAL PERFORMANCE
Cost Behavior and Cost-Volume-Profit Analysis
Halaman 1 Matakuliah: J0084 / Introduction to Management and Business Tahun: 2007 Versi: 1 / 3 Pertemuan 06 (Sixth Meting) Planning Tools and Techniques.
Chapter 5 Planning - To Set Direction
Plans and Planning Techniques
Planning and Goal Setting
Chapter 8 Planning.
PowerPoint Presentation by Charlie Cook
Last Week 1. Looked at concepts of planning and goals 2. Reviewed types of plans according to dimensions of breadth, time, specificity and frequency of.
Chapter 9 BUDGETING A budget is a formal written statement of management’s plans for a specified future time period, expressed in financial terms Control.
Chapter 9 PLANNING TOOLS AND TECHNIQUES © Prentice Hall,
Management 11e John Schermerhorn
Operations Management 14 Chapter Copyright ©2011 Pearson Education.
PLANNING TOOLS AND TECHNIQUES
Planning Tools and Techniques with Duane Weaver
Operations Management 14 Chapter Copyright ©2011 Pearson Education, Inc. Publishing as Prentice Hall.
Basic Challenges of Organizational Design
Chapter 20 CONTROLLING FOR ORGANIZATIONAL PERFORMANCE © 2003 Pearson Education Canada Inc.20.1.
HIT241 - TIME MANAGEMENT Introduction
Planning Tools and Techniques BUS 206 Erlan Bakiev, Ph. D. Zirve University Spring 2012.
Planning Processes and Techniques
Planning Tools and Techniques
© Farhan Mir 2007 IMS Principles of Management BBA (Hons) 4 th Semester (Lectures 25,26,27) Planning Tools & techniques By: Farhan Mir.
Planning Tools and Techniques Unit 4: Planning and Controlling.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Cost Behavior Analysis
UNIT 2: Planning The Planning Process and Types of Plans.

©2003 Prentice Hall, IncMarketing: Real People, Real Choices 3rd edition 12-0 Chapter 12 Pricing the Product.
BUSINESS PLUG-IN B15 Project Management.
23-1 Copyright  Houghton Mifflin Company. All rights reserved. Chapter 23 Cost-Volume-Profit Analysis and Variable Costing Belverd E. Needles, Jr. Marian.
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 Prentice Hall, Inc. All rights reserved. Operations Management.
Planning and Scheduling
Copyright © 2015 Pearson Education, Inc. publishing as Prentice Hall 14-1.
Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Eighth Canadian Edition. Copyright © 2005 Pearson Education Canada Inc. 1 Chapter.
Planning Tools and Techniques Module
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
8 th edition Steven P. Robbins Mary Coulter PowerPoint Presentation by Charlie Cook Copyright © 2005 Prentice Hall, Inc. All rights reserved.
Ninth edition STEPHEN P. ROBBINS PowerPoint Presentation by Charlie Cook The University of West Alabama MARY COULTER © 2007 Prentice Hall, Inc. All rights.
Chapter9Chapter9 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Activities Budget Critical path Events Forecasting.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
CHAPTER 12 MANAGERIAL ACCOUNTING AND COST-VOLUME- PROFIT RELATIONSHIPS McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
UNIT 2: Planning The Planning Process and Types of Plans.
PowerPoint Presentation to Accompany Management, 8/e John R. Schermerhorn, Jr. Prepared by: Jim LoPresti University of Colorado, Boulder Published by:
Management Fundamentals - Chapter 81 How do managers plan?  Planning The process of setting objectives and determining how to best accomplish them. 
Management, Eleventh Edition by Stephen P. Robbins & Mary Coulter ©2012 Pearson Education, Inc. publishing as Prentice Hall 9A-1.
Planning Tools and Techniques Appendix B B–1. Assessing the Environment  Environmental Scanning  The screening of large amounts of information to anticipate.
Ninth edition STEPHEN P. ROBBINS PowerPoint Presentation by Charlie Cook The University of West Alabama MARY COULTER © 2007 Prentice Hall, Inc. All rights.
Planning Tools and Techniques
Principles of Management Learning Session # 20 Dr. A. Rashid Kausar.
Chapter 20 CONTROLLING FOR ORGANIZATIONAL PERFORMANCE
BUSINESS DRIVEN TECHNOLOGY
PLANNING TOOLS AND TECHNIQUES
Chapter 8: Planning – Processes and Techniques
Contemporary Planning Techniques
Management Chapter 18A Planning and Control Techniques Module
2. 2 Assessing the Environment Environmental scanning - the screening of large amounts of information to anticipate and interpret changes in the environment.
Planning and Control Techniques Module
Copyright ©2011 Pearson Education, Inc. Publishing as Prentice Hall.
Planning Tools and Techniques
Planning Tools and Techniques
Planning Tools and Techniques
Importance of Project Schedules
How do managers plan? Planning Objectives Plan
Chapter 4: planning processes and techniques
Presentation transcript:

Chapter 9 PLANNING TOOLS AND TECHNIQUES © Prentice Hall, 2002 9-1

Learning Objectives You should learn to: Describe three techniques for assessing the environment Describe four techniques for allocating resources Tell why budgets are popular planning tools Differentiate Gantt and load charts Identify the steps in developing a PERT network © Prentice Hall, 2002 9-2

Learning Objectives (cont.) You should learn to: Describe the requirements for using linear programming Explain the concept of project planning Tell how managers might use scenarios in planning © Prentice Hall, 2002 9-3

Discussion How data and information is collected about competitors and global environment? 9 -

Techniques For Assessing The Environment Environmental Scanning the screening of information to anticipate and interpret changes in the environment. It helps organizations to develop their strategies accordingly. competitor intelligence - gathering information about one’s competitors. It helps to answer may questions: who are competitors? What are they doing? a variety of sources of information is easily accessible reverse engineering - analyze a competitor’s product becomes illegal corporate spying when proprietary materials or trade secrets are stolen fine line between what is legal and ethical and what is legal but unethical internet opened vast sources of data. © Prentice Hall, 2002 9-5

Assessing The Environment (cont.) Environmental Scanning (cont.) global scanning - screening of information on global forces that might affect an organization that has global interests. requires more extensive procedures than those used for scanning the domestic environment It might require subscription in different international journals, information basis, periodicals. © Prentice Hall, 2002 9-6

Assessing The Environment (cont.) Forecasting used to predict future events to facilitate decision making Techniques quantitative - applies a set of mathematical rules to a series of past data to predict outcomes qualitative - uses the judgment and opinions of knowledgeable individuals to predict outcomes collaborative forecasting and replenishment\replacement (CFAR). Internet software standardized way for businesses to use the Internet to exchange data information used to calculate a demand forecast for a particular product. It is based on past sales trends, promotion plans and others of the company. © Prentice Hall, 2002 9-7

Forecasting Techniques © Prentice Hall, 2002 9-8

Assessing The Environment (cont.) Forecasting (cont.) Effectiveness - managers have had mixed success. Forecasts are most accurate in relatively stable environments. Forecasts are relatively ineffective in predicting non-seasonal events, unusual occurrences, and the actions of competitors. To improve forecasts – use simple forecasting methods. compare every forecast with “no change”. use several forecasting methods and get the average shorten the length of forecasts. practice forecasting for training © Prentice Hall, 2002 9-9

Benchmarking . Benchmarking is the search for the best practices among competitors or non-competitors that lead to their superior performance. The benchmarking process typically follows four steps. (See Exhibit 9.2 on p. 230.) a. A benchmarking planning team is formed. The team’s initial task is to identify what is to be benchmarked, identify comparative organizations, and determine data collection methods. b. The team collects internal and external data. c. The data is analyzed to identify performance gaps and to determine the cause of the difference. d. An action plan is prepared and implemented. 2. Exhibit 9.3 on p. 230 lists some suggestions for improving benchmarking efforts. 9 -

Steps In Benchmarking Form a benchmarking planning team Best Practices Gather internal and external data Best Practices Prepare and implement action plan Analyze data to identify performance gaps © Prentice Hall, 2002 9-11

Suggestions for improving benchmarking Link benchmarking efforts with strategic objectives. Have the right size team -6-8 persons. Involve those people who will be directly affected by the benchmarking. Focus on specific targeted issues rather than broad. Set realistic timetable. 9 -

Techniques For Allocating Resources the assets of the organization take many forms, including financial, physical, human, intangible, and structural. Techniques for allocation: Budgeting Scheduling Breakeven analysis Linear programming © Prentice Hall, 2002 9-13

Techniques For Allocating Resources First: Budgeting budgets - numerical plans for allocating resources to specific activities are prepared for revenues, expenses, and large capital expenditures are applicable to a wide variety of organizations and activities force financial discipline © Prentice Hall, 2002 9-14

four different types of budgets A revenue budget is a budget that projects future sales. An expense budget is a budget that lists the primary activities undertaken by a unit and allocates a dollar amount to each. A profit budget is a budget used by separate units of an organization that combines revenues and expense budgets to determine the unit’s profit contribution. A cash budget is a budget that forecasts how much cash an organization will have on hand and how much it will need to meet expenses. 2. These budgets are based on the assumption of a single specified volume— fixed budgets. However, volume can’t be predicted exactly. Therefore, a variable budget is a budget that takes into account the costs that vary with volume. 3. Managers can improve their budgeting effectiveness by following the suggestions in Exhibit 9.5 on p. 232. 9 -

Suggestions For Improving Budgeting Be flexible. Goals should drive budgets -- budgets should not determine goals. Coordinate budgeting throughout the organization. Use budgeting/planning software when appropriate. Remember that budgets are tools. Remember that profits result from smart management, not because you budgeted for them. 9 -

Techniques For Allocating Resources (cont.) Second: Scheduling detailing what activities have to be done, the order in which they are to be completed, who is to do each, and when they are to be completed Gantt Charts - show when tasks are supposed to be done allow comparison with the actual progress on each task serve as a control tool a bar graph with time on the horizontal axis and the activities to be scheduled on the vertical axis shading represents actual progress © Prentice Hall, 2002 9-17

A Gantt Chart Activity Edit Manuscript Design Sample Pages Draw Artwork Print Galley Proofs Print Page Proofs Design Cover Month 1 2 4 3 Reporting Date Goals Actual Progress © Prentice Hall, 2002 9-18

Techniques For Allocating Resources (cont.) Scheduling (cont.) Load Charts - modified Gantt Chart schedule capacity by work areas vertical axis lists either entire departments or specific resources allow managers to plan and control capacity utilization. Load chart schedule capacity by work areas. © Prentice Hall, 2002 9-19

A Load Chart Editors Anne Antonio Kim Maurice Dave Penny Month 1 2 3 4 5 6 Work scheduled © Prentice Hall, 2002 9-20

Techniques For Allocating Resources (cont.) Scheduling (cont.) Program Evaluation and Review Technique (PERT) Network Analysis used to schedule complex projects. Such projects require coordinating hundreds of activities some of them must be done simultaneously and some cannot begin without finishing the preceding activity. E.g., building a construction project. Flowchart-like diagram that depicts the sequence of activities needed to complete a project indicates the time or costs associated with each activity can compare the effects alternative actions might have on scheduling and costs. © Prentice Hall, 2002 9-21

How to construct PERT network Scheduling (cont.) PERT (cont.) – nomenclature events - end points that represent the completion of major activities activities - time or resources required to progress from one event to another slack time - amount of time an activity can be delayed without delaying the entire project critical path - the most time-consuming sequence of events and activities in a PERT network delays on critical path will delay completion of the entire project (zero slack time) © Prentice Hall, 2002 9-22

Steps in Developing a PERT Network © Prentice Hall, 2002 9-23

A PERT Network for Constructing an Office Building © Prentice Hall, 2002 9-24

A PERT Network For Constructing An Office Building H I G J K Start 10 6 14 3 5 4 1 © Prentice Hall, 2002 9-25

Techniques For Allocating Resources (cont.) Scheduling (cont.) Breakeven Analysis - used to determine how many units must be sold to have neither profit nor loss used to make profit projections points out relationships between revenues, costs, and profits breakeven point - total revenue is just enough to equal total costs © Prentice Hall, 2002 9-26

Techniques For Allocating Resources (cont.) Scheduling (cont.) Breakeven Analysis (cont.) - nomenclature P - unit price of product VC - variable cost per unit TFC - total fixed costs Fixed costs - costs that do not change as volume increases Variable costs - costs that change in proportion to output © Prentice Hall, 2002 9-27

Breakeven Analysis $90,000 80,000 70,000 Profit 60,000 Area 50,000 40,000 30,000 20,000 10,000 Revenue/Cost($) Profit Area Total Revenue Breakeven Point Variable Costs Total Costs Loss Area Fixed Costs 100 200 300 400 500 600 Output (in thousands) © Prentice Hall, 2002 9-28

Contemporary Planning Techniques Project Management the task of getting a project’s activities done on time, within budget, and according to specifications project - a one-time-only set of activities that has a definite beginning and ending point in time standardized planning procedures often are not appropriate for projects. Projects are temporary in nature. Project Management Process team created from appropriate work areas team reports to a project manager project manager coordinates activities team disbands when project is completed © Prentice Hall, 2002 9-29

Project Management Process Define objectives Establish sequences Identify activities and resources Compare with Estimate time for activities Determine project completion date additional resource requirements © Prentice Hall, 2002 9-30

Contemporary Planning Techniques (cont.) Project Management (cont.) Role of the Project Manager role is affected by the one-shot nature of the project role is difficult because team members still linked to their permanent work areas members may be assigned to several projects simultaneously managers must rely on their communication skills and powers of persuasion © Prentice Hall, 2002 9-31

Contemporary Planning Techniques (cont.) Scenario Planning scenario - a consistent view of what the future is likely to be contingency planning - developing scenarios if this is what happens, then these are the actions we need to take intent is to reduce uncertainty by playing out potential situations under different specified conditions © Prentice Hall, 2002 9-32

Preparing for Unexpected Events © Prentice Hall, 2002 9-33

discussion It’s a waste of time and other resources to develop a set of sophisticated scenarios for situations that may never occur. Do you agree or disagree? Support your position. Although the situations that scenarios depict may never occur, the process of developing the scenario can prove beneficial and worthwhile. So it’s not a total waste of time to develop these sophisticated scenarios. 9 -

Discussion Do intuition and creativity have any relevance in quantitative planning tools and techniques? Explain. Yes, intuition and creativity may have relevance in determining the factors to be analyzed or the scenarios to be developed. The planning tools and techniques provide a way for the manager to quantitatively assess a situation, but the manager still needs to be creative in setting up the components to be studied. 9 -