Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.

Slides:



Advertisements
Similar presentations
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
Advertisements

STEAM TRAPS.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
Ottone Caretta & Chris Densham Technology Business Unit Rutherford Appleton Laboratory A new idea for NuFact targets and beam dumps BENE Nov 06 – Frascati,
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
1Managed by UT-Battelle for the U.S. Department of Energy NF/IDS Hg Vessel Layout 30 Jun 09 Cryostat 2 Front Drain Mercury Vessel Concept Matthew F. Glisson.
Mercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
High Power Hg Target Conceptual Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Mercury Catcher Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
KT McDonald Target Studies Meeting June 14, Mechanical Issues for the Target System K. McDonald Princeton U. (June 14, 2011) Target Studies Meeting.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NF Splash Mitigation 12 July 2011 Neutrino Factory Mercury Pool Splash Mitigation V.B. Graves.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 5 Aug 2009 Cryostat Front End Design Update Matthew Glisson Van Graves.
Chapter 12: Alternative Technologies To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Hydronic Mechanical Controls
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.
1Managed by UT-Battelle for the U.S. Department of Energy PASI_2012_Flowing_Target_Challenges Challenges for Flowing Targets Bernie Riemer (ORNL) (Jan.
-Fact 99 cdj Experiments with liquid jets C.Johnson CERN History CERN Mercury Jet Target - version 1985 Muon Collider Collaboration Targetry Workshops.
A powder jet target for a Neutrino Factory Ottone Caretta, Chris Densham (RAL), Tom Davies (Exeter University), Richard Woods (Gericke Ltd)
Neutrino Factory Mercury Vessel: Initial Cooling Calculations V. Graves Target Studies Nov 15, 2012.
Northvale Korting Fluid Jet Theory and Applications of Eductors By Patrick Belcher.
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
Forced two-phase helium cooling scheme for Mu2e Transport Solenoid Greg TatkowskiSergey ChebanNandhini Dhanaraj Daniel EvbotaMauricio LopesThomas Nicol.
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.
20to2T5m100cm Images Van Graves February 13, 2014.
K. McDonald Target Studies Meeting June 29, Materials for the Target System Internal Shield K. McDonald Princeton U. (June 27, 2010) Iron Plug Proton.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
Nuclear Thermal Hydraulic System Experiment
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Other R&D Harold G. Kirk Brookhaven National Lab.
Target On axis field [scale /20 T] Target Magnets Decay-Channel Triplets Taper magnets.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Neutrino Factory Mercury Catcher Concept
Outline: Why now ? What ? How ?
V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004
Mercury Catcher Status
FUEL DELIVERY SYSTEM Copyright © MILE 2011 MILE / XUV500 / IC / VER 01 / JUL 2011.
Presentation transcript:

Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011

2Managed by UT-Battelle for the U.S. Department of Energy Mercury Chamber Considerations, July 2011 Flow Loop Review 1 cm dia nozzle, 20 m/s jet requires 1.57 liter/sec mercury flow (94.2 liter/min, 24.9 gpm). MERIT experiment showed that a pump discharge pressure of ~40 bar required to produce the desired jet. Basic flow scheme Pump → Nozzle → Jet/Beam Dump → Heat Exchanger → Pump

3Managed by UT-Battelle for the U.S. Department of Energy Mercury Chamber Considerations, July 2011 Hg Flow Minimize pressure drops through piping by increasing diameter – 2" nozzle supply piping transitioning to 1 cm nozzle Overflow Mercury Drain Mercury Pump Gravity Drain Flow Control Valve Storage Tank Heat Exchanger Beam Dump

4Managed by UT-Battelle for the U.S. Department of Energy Mercury Chamber Considerations, July 2011 Gravity Drain Requires Flow Control Bulk flow exits dump via overflow drains Gravity drain intended to remain closed until end-of run, but this liquid becomes static Decay heating requires gravity drain to have flow control Mercury Jet Proton Beam Mercury Overflow Gravity Drain Flow Control Overflow drains WC Shielding

5Managed by UT-Battelle for the U.S. Department of Energy Mercury Chamber Considerations, July 2011 Mercury Chamber Basics Chamber serves as both jet and beam dumps – Chamber must encompass the nozzle tip No openings into chamber during operation – Mercury flows in a closed loop – Likely will be double-walled for mercury containment, possibly water cooled No embedded sensors Gravity drain of mercury required Penetrations (ports) into chamber – Nozzle – Hg drains (overflow and maintenance) – Vents (in and out) – Beam windows (upstream and downstream) – Cooling?

6Managed by UT-Battelle for the U.S. Department of Energy Mercury Chamber Considerations, July 2011 Simple Chamber – Overflow Drain Options Splash mitigation not shown Size of drainage system outlets TBD Drain Pipes Drain Slots Drain Chamber

7Managed by UT-Battelle for the U.S. Department of Energy Mercury Chamber Considerations, July 2011 Mercury Chamber Ports Chamber requires several ports Sizes likely to increase due to remote handling requirements Vents (In/Out) Jet Nozzle Overflow Drains Maintenance Drain (Valved) Beam Pipe

8Managed by UT-Battelle for the U.S. Department of Energy Mercury Chamber Considerations, July 2011 Chamber Relative to Existing Coils Sized to locate drain pipes below resistive magnets No beam pipe shown Severely impacts tungsten shielding Chamber shape requires significant increase in complexity Integrating resistive magnets and chamber into a single module likely to be required

9Managed by UT-Battelle for the U.S. Department of Energy Mercury Chamber Considerations, July 2011 Upstream Solenoids Affect Design Long piping required Remote removal / insertion more difficult Beam trajectory impacted – Dictates the location of upstream accelerator – Ramifications of inaccurate field map? More utility connections interfere with beam path