Three Point Consulting Hawthorn Park Enhancement Project 3 Consulting TT hree Poin.

Slides:



Advertisements
Similar presentations
Lesson 3 Responding to Emergency Events. For additional information or questions please contact Toledo-Lucas County Health Department APC:
Advertisements

OCPS SCHOOL SITE SELECTION PROCESS
Module 2: Bioretention Area Siting and Design Andy Rowe, PE, LEED AP, QSD Cannon.
WARD LAKE MASTER PLAN Public Input Workshop #1 July 14, 2011.
Griffith Park Fire Draft Recovery Plan May 30, 2007 Mayor Antonio R. Villaraigosa Councilman Tom LaBonge, CD 4 General Manager Jon Kirk Mukri City of Los.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
Welcome “Sewers – The Key to Hauppauge Revitalization: The Next Economic Boom ” 1 June 23, 2010.
Duane Hill, District Engineer
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
NRC LICENSE APPLICATION PROCESS
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
City of Hillsdale & Hillsdale Township.  Location  Socioeconomic Summary  Population History & Projections  Age & Sex of the Population  Household.
Civil Engineering The best kind!!!!!!!!!!!!!!!!!!.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
Final Presentation Minerva Engineering. Introduction  John Kats- Project Manager  Ryan Schipper- Project Editor  Matt Lash- Project Engineer/Client.
Stormwater Quality Enhancement
Three Point Consulting Hawthorn Park Enhancement Project 3 Consulting TT hree Poin.
Acting Assistant City Manager REFUSED 2/3/04 Assistant Director of Public Works INTERVIEWED 1/27/04 1 City Manager, Originally agreed Then REFUSED 1/30/04.
Larrison Pavilion Deming Park Terre Haute, Indiana.
Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda.
Engineering Hydrology (ECIV 4323)
Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.
City of Greencastle Flood Protection Plan Presented by, United Geotech, LTD.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
William B. Reed Senior Hydrologist Colorado Basin River Forecast Center CBRFC Support for Dam Breaks DamBreak and EAPs Arizona 2011 Spring Hydrology Seminar.
Utilizing LiDAR for Engineering Applications Conservation Our Purpose, Our Passion.
Hydrologic Cycle. Hydrologic Cycle Processes Surface Water Soil water Atmospheric water Groundwater Processes Precipitation Evaporation Surface Runoff.
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
Upper Brushy Creek Water Control & Improvement District
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
The WLP must be consistent with these objectives 1.maintaining or enhancing an economically valuable supply of commercial timber from the woodlot licence.
Manual Direction Cave & Karst Resources Management James Goodbar Senior Cave /Karst Specialist Bureau of Land Management May 12-16, 2014 Cody, Wyoming.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Project Our group collaborated with students at the University of Zacatecas (UAZ) to accomplish the following: 1- Create an accurate hydrologic model which.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
PART 1 - INTRODUCTION TO SITES B. History and Focus of the SITES Software and its Application SPECIALTY WORKSHOP: SITES TRAINING AND INTRODUCTION TO WINDAM.
ALLIANCE TEXAS CONFERENCE SMALL BUSINESS WORKSHOP June 29, 2010.
HYDROLOGIC DATA. BACKGROUND Analysis and synthesis of data is required to perform any hydrologic computation. The engineer needs to: Identify and define.
Finding the S vs. Q relationship By: Cody Hudson.
Civil and Environmental Engineering
Kentucky Growth Readiness for Water Quality Does your water quality matter?
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
Basic Hydrology & Hydraulics: DES 601 Module 1 Introduction.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
An area of significant change and identified as: Placeshaping in West Hampstead Area of Intensification in the London Plan Work completed and underway:
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
The Effects of Impervious Cover on a Hydrologic System BRUSHY CREEK WATERSHED By Ruth Haberman.
What does a Civil Engineer do?
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Division of Engineering Geotechnical & Engineering Services Branch Project Geology Section in West Sacramento Rob Barry Supervising Engineering Geologist.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Tailings Dam Stability
MENTAL HEALTH CLINIC Siting Process and Analysis.
USDA -Natural Resources Conservation Service
Innovation Through GIS
Griffith Park Fire Draft Recovery Plan May 30, 2007
Draft Transportation Element September 6, 2017
Tennessee Safe Dams Program
Anne Arundel County Maryland
National Association of State Conservation Agencies
Steps To Prepare Site For Site Work Construction Calhoun GA.
Urban Water Institute 24th Annual Conference Oroville Dam
Presentation transcript:

Three Point Consulting Hawthorn Park Enhancement Project 3 Consulting TT hree Poin

3 Consulting TT hree Poin Hawthorn Park Enhancement Project Project Manager: Jon Keim Report Editor: Daniel Conley Project Engineer: Eric Diehl Project Engineer: Andy Bolyard

Hawthorn Park Enhancement Project Project Background Project Approach Design Solutions

Project Background Location of Hawthorn Park in relation to the State of Indiana  Property Previously Owned by the Hulman Family  1982 – Land Purchased by Vigo Co. Parks and Recreation Dept.  Burns Lake  National Road Heritage Trail  Client: Mr. William K. Ruble, Superintendent of Vigo County Park and Recreation Dept.  Project Encompasses: water resources, geotechnical, transportation, and environmental

Project’s Design Requirements Assess current Burns Lake Dam Hazard Classification Investigate adequacy of Emergency Spillway for Burns Lake Connect Existing National Road Heritage Trail to Tupelo Shelter

Design Solutions Site and Dam Investigation Survey Dam & Spillway Codes and Regulations Indiana Code for Regulation of Dams Indiana Dam Safety Inspection Manual General Guidelines for New Dams and Improvements to Existing Dams in Indiana AASHTO Guide for the Development of Bicycle Facilities

Design Solutions Emergency Spillway Hydrologic Study Hydraulic Study USACE HEC-HMS Results

Design Solutions Hydrologic Study Watershed Delineation SCS Curve Numbers Land Use Hydrologic Soil Groups Time of Concentration Design Storm: 6hr PMP Stage Storage Relationships

Progress to Date

Design Solutions Hydrologic Study Watershed Delineation SCS Curve Numbers Land Use Hydrologic Soil Groups Time of Concentration Design Storm: 6hr PMP Stage Storage Relationships

Design Solutions HEC-HMS Results Emergency Spillway Adequate Developed Conditions

Design Solutions Emergency Action Plan Chain of Command Keith Ruble Local Authorities Evacuation Plan Emergency Agencies State Emergency Management Agency (SEMA)

EMERGENCYACTIONPLANEMERGENCYACTIONPLAN

Design Solutions Hazard Classification Assessment Breach analysis HEC-RAS modeling Breach wave will overtop trail grade

Design Solutions Riser and Barrel Design Existing Structure will Degrade in Future Have Design Ready for construction

Design Solutions Trail Layout and Design Connect to Tupelo Shelter and Restroom Facilities Surface Options Site Preparation

Design Solutions

Preliminary Slope Stability Assessment Subsurface Investigation Dynamic Cone testing XSTABL modeling Adequately Stable

Summary Site Investigation Hydrology/Hydraulics Study & Modeling Hazard Classification Assessment Trail Design & Layout Riser & Barrel Design Slope Stability Assessment

Questions? 3 Consulting TT hree Poin