DRAFT (12/18/00) AURA’s road map to future 30m - 100m groundbased observatories - entering the “ era of the Giants ” in partnership The New Initiatives.

Slides:



Advertisements
Similar presentations
TheEuropean Extremely Large Telescope. The E-ELT 40-m class telescope: largest optical- infrared telescope in the world. Segmented primary mirror. Active.
Advertisements

Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
1 Can we afford to build an extremely large groundbased diffraction limited optical/IR telescope? Jim Oschmann Francois Rigaut Mike Sheehan Larry Stepp.
Maximum Aperture Telescope Workshop Organized by AURA Chaired by Jay Gallagher MAX-AT Workshop Madison, Wisconsin, August.
LMS, 3/07/00 GSMT Systems Task Group MeetingBoulder, CO Systems Issues: Optical Design & Fabrication GSMT Working Group on Optical Design & Fabrication.
AGENDA l New Initiatives Office concept, purpose of NIO Advisory Committee –Smith l Science Case – Strom l Technology considerations – Oschmann l Near.
Mauna Kea. The Gemini Project Who: An international partnership of the United States, United Kingdom, Canada, Chile, Argentina, Brazil and Australia.
Maximizing GSMT Science Return with Scientific Figures of Merit.
Aug-Nov, 2008 IAG/USP (Keith Taylor) ‏ Instrumentation Concepts Ground-based Optical Telescopes Keith Taylor (IAG/USP) Aug-Nov, 2008 Aug-Sep, 2008 IAG-USP.
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
STAR FORMATION STUDIES with the CORNELL-CALTECH ATACAMA TELESCOPE Star Formation/ISM Working Group Paul F. Goldsmith (Cornell) & Neal. J. Evans II (Univ.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 25.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
AURA New Initiatives Office. Larry Stepp and Brooke Gregory The GSMT Point Design.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
Adaptive Optics Road Map An Adaptive Optics Road Map Presentation to the AURA Board 7 February 2001 A Renaissance in Groundbased IR (even Optical) Astronomy?
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
MCAO A Pot Pourri: AO vs HST, the Gemini MCAO and AO for ELTs Francois Rigaut, Gemini GSMT SWG, IfA, 12/04/2002.
Agenda GSMT Controls Workshop, 11 September, :00 am GSMT Overview – Brooke Gregory, Larry Stepp 9:30 am Pointing Control for a Giant Segmented Mirror.
Gemini Observatory Results & Lessons Leaned SPIE August 2002 Matt Mountain Jean-Rene Roy Phil Puxley Eric Hansen.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 23.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
Telescopes & recent observational techniques ASTR 3010 Lecture 4 Chapters 3 & 6.
‘OHANA Towards kilometric infrared arrays Visions for InfraRed Astronomy Paris March 21, 2006 Guy Perrin (+ many others including Pierre)
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
European Extremely Large Telescope - Status April ESO.
MAXAT-II Woods Hole September Overview Science Drivers Lessons of the past Focusing on Science and Innovation.
Viewing the Universe through distorted lenses: Adaptive optics in astronomy Steven Beckwith Space Telescope Science Institute & JHU.
Optical principles of diffraction focussing, Preparing the way to space borne Fresnel imagers NiceSeptember 23-25, Laurent Koechlin Laboratoire.
Stellar Populations Science Knut Olsen. The Star Formation Histories of Disk Galaxies Context – Hierarchical structure formation does an excellent job.
1 What we are: Two 8m telescopes, capable of forefront imaging and spectroscopy at optical and IR wavelengths. A young Observatory designed to enable and.
ASTR 3010 Lecture 18 Textbook N/A
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
Objectives 1. How should Gemini respond in terms of scientific effectiveness to the the current competition from Subaru, ESO and perhaps even Keck? 2.
Swift/BAT Census of Black Holes Preliminary results in Markwardt et al ' energy coded color.
NIO GSMT Overview VLOT/GSMT WORKSHOP Victoria, BC 17 JULY, 2001 S. Strom, L. Stepp.
LMS11/26/01NIO Workshop on Wind Modeling Welcome and Introduction Larry Stepp.
1 Progress on the 30m Giant Segmented Mirror Telescope AURA New Initiatives Office Leiden, 17 May 2001 Matt Mountain Jim Oschmann Knut Olsen.
CELT Science Case. CELT Science Justification Process Put together a Science Working Group –Bolte, Chuck Steidel, Andrea Ghez, Mike Brown, Judy Cohen,
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
Technology Development for ELTs Doug Simons GSMT SWG April 28, 2003.
Mega Telescopes of the 21 st Century Evolution in the Ground-Space Synergy Dr. Marc Postman (STScI) & Richard Ellis (Caltech) James Webb Space Telescope.
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Lessons Learned Workshop 24 th August 2002 Success Success Challenges Challenges The Context for Aspen 2003 The Context for Aspen 2003  Looking ahead.
Forming High Mass Stars Probing the Formation Epoch.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
1 Can we afford to build an extremely large groundbased diffraction limited optical/IR telescope? Jim Oschmann Francois Rigaut Mike Sheehan Larry Stepp.
1 Comparative Performance of a 30m Groundbased GSMT and a 6.5m (and 4m) NGST NAS Committee of Astronomy & Astrophysics 9 th April 2001 Matt Mountain Gemini.
Wide field telescope using spherical mirrors Jim Burge and Roger Angel University of Arizona Tucson, AZ Jim
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 25.
AURA New Initiatives Office Euro50 - GSMT - XLT MeetingLMS, 08/02/02 The Giant Segmented Mirror Telescope.
FIRST LIGHT A selection of future facilities relevant to the formation and evolution of galaxies Wavelength Sensitivity Spatial resolution.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
François Rigaut, Gemini Observatory GSMT SWG Meeting, LAX, 2003/03/06 François Rigaut, Gemini Observatory GSMT SWG Meeting, LAX, 2003/03/06 GSMT AO Simulations.
Gemini AO Program March 31, 2000Ellerbroek/Rigaut [ ]1 Scaling Multi-Conjugate Adaptive Optics Performance Estimates to Extremely Large Telescopes.
Sample expanded template for one theme: Physics of Galaxy Evolution Mark Dickinson.
Galaxy formation and evolution with a GSMT: The z=0 fossil record 17 March, 2003.
X-ray Interferometer Mirror Module ISAL Study Pre-work Overview.
Next Generation O/IR Telescopes Stephen E. Strom Associate Director GSMT Development NOAO User’s Committee October, 2005.
Stellar Populations Science Knut Olsen. The Star Formation Histories of Disk Galaxies Context – Hierarchical structure formation does an excellent job.
The Science Case Hubble Space Telescope CELT+AO HDF.
Observing brown dwarfs in the E-ELT era
Pyramid sensors for AO and co-phasing
Theme 2 AO for Extremely Large Telescopes
A 10-m Diameter Submillimeter-wave Telescope for the South Pole
Comparative Performance of a 30m Groundbased GSMT and a 6
Probing the IMF Star Formation in Massive Clusters.
Theme 2 AO for Extremely Large Telescopes
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

DRAFT (12/18/00) AURA’s road map to future 30m - 100m groundbased observatories - entering the “ era of the Giants ” in partnership The New Initiatives Office - a partnership between Gemini, NOAO and our Communities DRAFT – first thoughts (12/18/00) abbreviated version

DRAFT (12/18/00) AURA’s “New Initiative Office” - a New Initiative for Groundbased Astronomy Global context Science Drivers (highly abbreviated in this version) Organizing for success in partnership Focusing on Innovation

DRAFT (12/18/00) Global context NGST NGST ALMA SIM ALMA SIM VLA-upgrade VLA-upgrade Keck-Inter. ESO-VLTI Keck I&II UT1,UT2,UT3,UT4 Gemini N&S HET LBT Phase A: of what? OWL CELT and maybe GSMT… LSST? The decade of adaptive optics NIO timeline The era of the “giants”

DRAFT (12/18/00) How we will be competitive from the ground The “ Next Generation ” Space Telescope (NGST) will probably launch – an 6m - 8m telescope in space NGST will be extremely competitive for: – deep infrared imaging, – spectroscopy at wavelengths longer than 3 microns Groundbased telescopes can still compete in the optical and near-infrared – moderate to high resolution spectroscopy Groundbased facilities can also exploit large baselines – high angular resolution observations

DRAFT (12/18/00) “Deconstructing High z Galaxies” Integral field observations of a z = irregular HDF galaxy (Ellis et al) “Starformation histories of physically distinct components apparently vary - dynamical data is essential” -- this is very hard on 8m – 10m telescopes

DRAFT (12/18/00) Going beyond Gemini Jupiter Solar 10 pc 500 mas Gilmozzi et al (1998) Log 10 F  (  Jansky)  m) 10  t = 10,000s R = 1800 Gemini x 30 Models for 1 M J Planets at 10 pc from Burrows et al 1997

DRAFT (12/18/00) 1 R 1 AU 100 AU 0.1 pc 10 pc Accretion Disks Protoplanetary Disks Planets Molecular Cloud Cores Jets/HH GMC Mol. Outflows Stellar Clusters milli- arcseconds Observations at z = AGN Galactic observations out to 1kpc at 10 mas resolution 10 AU Spectroscopy Imaging  100 pc Velocity dispersion R= Flux Going beyond 0.1 arcsecond astronomy requires resolution and sensitivity

DRAFT (12/18/00) New Frontiers: Galaxies Dense sampling over large fields of view: Depth: to reach z= for dense sampling Capabilities Large aperture Telescope Large FOV (>20’) O/IR MOS at R~5000

DRAFT (12/18/00) Why a wide field Sensitivity + FOV* Large Scale Structure 100Mpc (5 O x5 O ), 27AB mag (L* z=9), dense sampling NBT1.5 yr Gemini50 yr NGST140 yr * uniqueness cf. ESO 100m OWL

DRAFT (12/18/00) The NIO – organizing for success in partnership Steering Committee: Pres. AURA Dir. Gemini Dir. NOAO Another (S.Strom) GeminiNOAO NIO Office PM: J. Oschmann PS: (TBD) NIO staff (allocated FTE’s) Resources NIO Advisory Committee Working Groups Study Contracts External resources AURA

DRAFT (12/18/00) Baseline Approach - ambitious at the outset 0.9  m  m Tech. challengeScience challenge Minimize risk -- if at all possible Focus on technologies that have the potential to produce the most innovative results Multi-conjugate AO Smart structures Optical materials and support approaches Analytical analysis of wind-buffeting “Cheap” enclosures 1 arcmin - 3 arcmin Tech. challengeScience challenge Tech. challenge Diffraction limited telescope D ~ 30m - 100m Operating wavelengths Corrected Field of View Uncorrected FOV arcmins

DRAFT (12/18/00) New Initiative’s Office, a partnership between Gemini, NOAO and our Communities Working Groups – Science – Systems – Adaptive Optics – Optics – Structures and Controls – Sites – Instrumentation – Management Issues – Corrected vs. uncorrected FOV – Error Budget, Complexity – Strehl ratio vs. FOV vs. No. lasers – Cost of aspheric vs. spherical M1 – Wind buffeting analysis, the role of smart structures – Mauna Kea vs. Chajnantor – Narrow vs. Wide field, detectors – National vs. International support

DRAFT (12/18/00) Possible Concept A “radio telescope” married to active and adaptive optics Mirror-to-cell actuators Integrated mirror/cell segment Large stroke actuators Mirror support truss with smart structure elements/active damping as needed Three levels of figure control: Each mirror segment Each mirror segment is controlled within an individual cell is controlled within an individual cell Each cell is then controlled with respect to the primary mirror support structure Each cell is then controlled with respect to the primary mirror support structure The support structure may have to use “smart structure” technology to maintain sufficient shape and/or damping for slewing/tracking The support structure may have to use “smart structure” technology to maintain sufficient shape and/or damping for slewing/tracking

DRAFT (12/18/00) A proposed approach to achieving the image quality science goals LGSs provide full S.C. Deformable M2 : First stage MCAO, wide field seeing improvement and M1 shape control 10-20’ Field at ” seeing 1-2’ field fed to the MCAO module Wide and narrow field science multiplexing M2: rather slow, large stroke DM to compensate ground layer and telescope figure, or to use as single DM at >3  m. (~20000 act) Dedicated, small field (1-2’) MCAO system (~4-6DMs). Focal plane Active primary (0.1Hz)?

DRAFT (12/18/00) How do we cost a m? Risk assessment examples 1 of 3 Adaptive OpticsAdaptive Optics –multiple-conjugate AO needs to be demonstrated –requires a laser solution –deformable mirror technology needs to expanded for 50m ( x more actuators How do we make “light-weight”, 2 - 4m aspheric segment mounted in its own active cell and can we afford hundreds of them?How do we make “light-weight”, 2 - 4m aspheric segment mounted in its own active cell and can we afford hundreds of them? How much dynamic range do we need to control cell- segment to cell-segment alignment ?How much dynamic range do we need to control cell- segment to cell-segment alignment ?  Will “smart”, and/or active damping systems have to be used telescope  evaluate by analysis and test.  Composites or Steel?

DRAFT (12/18/00) An Enclosure for 50m -- “ how big ?” Risk assessment examples 2 of 3 Restrict observing range to airmasses < 2.0Restrict observing range to airmasses < degrees 75m “Astro-dome” approach“Astro-dome” approach Heretical proposition #1 - excavateHeretical proposition #1 - excavate –significantly lowers enclosure cost –further shields telescope from wind –reliant on AO to correct boundary layer 150m 75m Heretical proposition #2 - perhaps the wind characteristics of a site are now more important than the seeing characteristicsHeretical proposition #2 - perhaps the wind characteristics of a site are now more important than the seeing characteristics

DRAFT (12/18/00) Risk assessment examples 3 of 3  Telescope Structure and wind loading  We need to characterize this loading in a way that is relatively easy to use in finite element analysis. This is easy, but mathematically intensive. Basically for each node that gets a wind force, a full vector of force cross spectra is generated, therefore the force matrix is a full matrix with an order equal to the number of forces (10’s of thousands).  Enclosure concept (do we need one)?  What concept can we afford both in terms of dollars/euros and environmental impact (note Heretical Proposition #2) èPROBABLE CONCLUSION: WE NEED A TECHNOLOGY TEST-BED  a 20m - 30m “new technology telescope”  this is probably to only way to establish a credible cost for a 50m - 100m diffraction limited optical/IR groundbased telescope

DRAFT (12/18/00) New Initiative’s Office, a partnership between Gemini, NOAO and our Communities Working Groups – Science – Systems – Adaptive Optics – Optics – Structures and Controls – Sites – Instrumentation – Management Preliminary reports in draft form, community meetings and first design studies underway - Strategy Document by June 2001

DRAFT (12/18/00)