GLAST LAT ProjectF-to-F, June 15, 2005 4.1.7 DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 Face-To-Face.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S September Status
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Monitoring V6 1 GLAST Large Area Telescope: Electronics, Data.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectOct DAQ & FSWV3 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Analysis of cPCI Backplane.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650)
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 3, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectPDU/GASU MRR, February 4, DAQ & FSWV3 1 GLAST Large Area Telescope: B. Estey, G. Haller, D. Marsh SLAC
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectPDU TRR, July, DAQ & FSWV4 1 GLAST Large Area Telescope: Presented by P. Young SLAC (650)
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: Gunther Haller SLAC (650)
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
EPU load – same as SIU load except…
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face June 15 Meeting Gunther Haller (650) Gamma-ray Large Area Space Telescope

GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 2 TEM/TPS Status & Schedule Status –Qual Module: at SLAC –Flight Tower-Electronics Modules/Tower Power Supplies A & B on towers Status of #1 thru #19 on Production/SLAC_Prod/slac_prod.htmhttp://www-glast.slac.stanford.edu/Elec_DAQ/Flight- Production/SLAC_Prod/slac_prod.htm #1 thru #5 delivered to I&T #6 has bad TEM connector, to be repaired #7 thru #9 were vibrated, need TV testing (5 days for set of 2) TEM and TPS modules for #10 thru #19 in various states, still to be integrated into TEM/TPS packages (#15 thru #19 are spares)

GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 3 PDU Status and Schedule Status –1 st PDU box was pre-coat tested at SLAC and returned to assembler –Is in conformal coating, expected delivery to SLAC is June 27 (followed by vib/TV/EMI) –Expected delivery to I&T is Aug 9 –2 nd box is in manual assembly, expected delivery to I&T is Oct 4 Tester –Thermal vacuum test-setup in commissioning

GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 4 GASU Status and Schedule Status –4 GASU Power-supplies CCAs done, waiting for GASU box integration –4 DAQ boards: finish flying probe testing –Expected delivery to SLAC (pre-coat): June 29 –Expected delivery to SLAC (final assembly): Aug 4 –Expected delivery to I&T: Sept 16 –2 nd box: expected delivery to I&T: Nov 9 Issue: –Microsemi Zener diode to protect ACD over-voltage is again delayed, now 7/7 (ordered 2.5 years ago). –Working with Microsemi to possible get a in-stock lower voltage 3.9V device and screen them to get minimum Zener voltage (devices are +/- 5%, but would need e.g. 3.9V – 0%, +10% 2 devices needed per GASU enclosure Tester –TV test setup in assembly

GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 5 SIU/EPU Status and Schedule cCPI board assembly test –Backplane Issues with under-fill on back-plane (some pins have down to 60-70% fill Refabricated board with less copper, but still have under-fill –Did couple of rounds (assembly, X-ray/cross-sectioning at GSFC, discussions) –Discussions on what fill is sufficient Discussions whether to change from ERNI to Hypertronics connectors, but they are not compatible (so issue with RAD750 board to back-plane compatibility) In assembly of first 3 flight backplanes, will be sent to GSFC for X-ray before CCA is completed Agreed to do some qual testing using one of those backplanes (continuity test while thermal- cycling the board) –Need to come up with test-setup/procedure asap –Plug-in boards (CPS/LCB/SIB) SIB –3 rounds of SIB test-assemblies: issues with voids (not with under-fill) –Modifying wave-solder fixture to possible take care of voids –Require new lot of Austin EEPROM’s (found chlorine contamination issue, parts in hand can’t be used) »Partial delivery expected mid June LCB –1 flight board in assembly, one test-board with only connectors also in assembly (to be analyzed by GSFC) CPS –Same state as LCB Schedule –Oct 13: deliver first SIU crate to I&T –Oct 25, deliver 2 nd crate first EPU) to I&T –Subsequent crate have 1 week lag (TV)

GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 6 Harness & HCB Harness cables are coming in steadily –Some cables needed rework and retest Heater Control Box assembly –Contract about to be awarded

GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 7 VSC (Virtual Spacecraft Simulator) & Several VSC‘s assembled, in use by FSW and I&T Thermal Control Lockheed test setup –Rack in assembly with Power supplies Custom regulated feed bus-protection unit Custom unregulated feed bus-protection unit SIU with SIB/LCB/CPS GASU & PDU Misc cables and test-boxes Software –Expected completion by end of next week

GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 8 Issues AUSTIN EEPROM delivery Qualification of cCPI press-fit connector assembly using solder process Delivery issue with GASU PS Zener protection diode for ACD voltage Need to work on closing open FPGA review items