Reliable Power Reliable Markets Reliable People Market Services Stakeholder Session Thursday, January 7, 2010 Metropolitan Centre, Calgary.

Slides:



Advertisements
Similar presentations
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
Advertisements

1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
OCTOBER 8, 2014 Bob Laurita INTERNAL MARKET MONITORING New Import Capacity Resource FCM Market Power Mitigation Order to Show Cause Compliance Filing.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
Reliable Power Reliable Markets Reliable People Implementation of Market & Operational Framework for Wind Integration Stakeholder Information Session Monday,
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Demand Response Working Group AESO ‘As Is’ and Needs Assessment.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
Reliable Power Reliable Markets Reliable People Reliable Power Reliable Markets Reliable People Interconnection Queue Business Practices Stakeholder Consultation.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
2011 Contribution Policy AESO Tariff Applications October 17 th, 2011.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Reliable Power Reliable Markets Reliable People Wind Developments in North America APEX Conference – Sydney, Australia October 14, 2008 Warren Frost, Vice.
Reliable Power Reliable Markets Reliable People ISO Rules Update – – Outage Cancellation – Long Lead Time Energy Dispatch Compliance.
Reliable Power Reliable Markets Reliable People Rule 6.6 Recommendation Update January 29, 2009.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Market Services Stakeholder Session January 12, 2011.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Public Market Surveillance Panel Consultation on CMSC Issues Related to Constrained off Payments to Generators and Imports Market Operations Standing Committee.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.
The Australian Market Evolution Dr Brian Spalding Chief Operating Officer NEMMCO.
Reliable Power Reliable Markets Reliable People AESO Integrated Market Roadmap March 2009 Stakeholder Session.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
ERS Update – DSWG Presentation September 21, 2012.
1 TAC Report to the ERCOT Board February 16, 2005.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
An Overview of: Generation Connections: Transmission Connection Cost Responsibility Review July
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. Southwest Connecticut RFP Markets Committee November 14, 2003.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Community Solar, Remote Net Metering, and Behind the Meter Solar Update Solar Progress Partnership* Summary of April 18, 2016 Comments The Solar Progress.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
Asia-Pacific Energy Regulatory Forum
Market Services Stakeholder Session
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
GMD Data Request NERC Rules of Procedure Section 1600
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

Reliable Power Reliable Markets Reliable People Market Services Stakeholder Session Thursday, January 7, 2010 Metropolitan Centre, Calgary

Reliable Power Reliable Markets Reliable People Wind Technical Rule John Kehler Senior Technical Specialist

3 Agenda Purpose of Session Why a Wind Technical Rule Summary of Key Points Authoritative Documents Inputs to the Wind Technical Rule Overview and Discussion of the Wind Technical Rule Next Steps

4 Background Market and Operational Framework Market and Operational Framework: effective September 26, 2007 Premise of framework - If the System Operator receives a reasonable forecast of wind power generation, then they can establish an operating plan to accommodate the forecast wind energy by using the following resources/tools: –Forecasting –The Energy Market Merit Order –Regulating Reserves –Wind Following Services –Wind Power Management Market and Operational Framework: effective September 26, 2007 Premise of framework - If the System Operator receives a reasonable forecast of wind power generation, then they can establish an operating plan to accommodate the forecast wind energy by using the following resources/tools: –Forecasting –The Energy Market Merit Order –Regulating Reserves –Wind Following Services –Wind Power Management AESO Final Recommendations for the implementation of the MOF - June 18, 2009

5 Purpose Review and discuss the Wind Technical Rule with stakeholders prior to submission of comments (deadline for comment is Jan 22) Encourage stakeholders and suppliers of wind facility equipment to comment on the Wind Technical Rule

6 Key Points The Wind Technical Rule is: For all wind power facilities, any considerations for existing and new facilities will be addressed in the Rule In most cases the technical intent remains the same as in the predecessor standard Primarily to add requirements for physical infrastructure at wind power facilities for wind power forecasting capability, power limiting, ramp rate limiting and over-frequency control Proposing effective date of 180 days post AUC approval to provide existing facilities a reasonable period of time to add or modify equipment at wind generating facilities

7 Transition of Wind Technical Requirements New ISO Rules Framework AESO Tariff Authority for the Technical Requirements currently under the Tariff Authority for Technical Requirements will transition to Part 500 of ISO Rules Article 4 Customer Interconnection Requirements Transition

8 Transition of Wind Technical Requirements Existing Requirements Use and consistency of definitions Clarify the language and incorporate new or updated definitions Clarify the requirements based on last 5 years experience New Requirements Add grandfathering Add Over Frequency Control requirements Add Ramp and Power Limiting requirements Add forecasting and meteorological data requirements Example of an Information Document Existing Guide Existing Requirements New Rule and Requirements New Information Document Future

9 Considerations in Developing Wind Technical Rule Current Wind Power Facility Technical Requirements - November 2004 Wind Power Forecasting Pilot Project Work Group recommendations Wind Power Management Protocol Work Group recommendations Wind Power Management Technical Requirements Work Group Transition Of Authoritative Documents (TOAD) policies, template, framework, standards and principles Any applicable provisions of Alberta Reliability Standards AESO final recommendations to implement the Market and Operational Framework for Wind Integration - June 2009

10 Specific Policy Considerations All forms of generation in Alberta have certain basic obligations Wind Technical Rules are specifically for wind power facilities that connect to the transmission system Wind Power Facility Technical Requirements included “policy place holders” for future technical requirements In a separate and future consultation on wind power integration, the AESO will consult on how and when wind power or ramp rate limiting, and wind forecasting, will be used

11 Technical Considerations Development of technical requirements in Wind Technical Rule is based on either: –NERC/WECC requirements, or –AESO requirements Fairness amongst generating facilities, Technical capability of existing wind facility technology

12

13 Performance Points Collector Bus –Maximum Authorized MW –Gross MW –Reactive Power requirements –Voltage Regulation –Voltage Operating Range –Over Frequency Control –Monitoring Point of Connection –Voltage Ride Through –Off Nominal Frequency –Power and Ramp Rate Limiting –Monitoring Facility –Meteorological data

14 Definitions (Apply to all participants) General Definitions “generating facilities” “maximum authorized MW” “operator” “person” “wind turbine generator” “transmission system” “voltage regulating system” “owner” “gross MW” “point of connection” These definitions will move out of Wind Technical Rule and into Part 100: General of the ISO Rules

15 Applicability Section 1 Applies to all wind generating facilities New facilities must comply Existing facilities connected under 2004 technical requirements must comply Grandfathering considerations to those facilities connected under 1999 technical requirement All wind generating facilities participate in wind power forecasting requirements including meteorological data requirements

16 Example of Grandfathering Rule 18 MW grandfathered to the 1999 technical requirements Two 3 MW turbines are upgraded over any period of time. The upgraded 6 MW must fully comply with the Wind Technical Rule. The older 12 MW remain under the 1999 requirements until such time they are upgraded.

17 Example of Grandfathering Rule Upgraded portion will be required to comply with voltage ride through, voltage regulation, reactive power, over frequency control, power limiting, ramp rate limiting and any other requirements that are deficient to the new Wind Technical Rule Grandfathered portion is not likely to comply with the voltage ride through and is not required to comply with the over frequency control, power limiting and ramp rate limiting requirements of the new Wind Technical Rule

18 Over Frequency Control Section 15 Frequency control requires fast measurement and good resolution of system frequency –30 samples per second at Hz resolution in the standard Consistent with conventional generators –0.036 Hz allowable deadband –Equivalent to 5% speed drop –Response rate equivalent to gas and hydro Coordinates with the off nominal frequency requirements –Facilities can disconnect from the grid at 61.7 Hz

19 Over Frequency Control Example Example of actual over frequency event in 2009 Wind MW is illustrative only When system frequency exceeds the allowable dead- band Controls will reduce MW output of the wind generating facility

20 Power Limiting and Ramp Rate Limiting Section 17 Power limiting and ramp rate limiting manage the MWs produced at the Point of Connection –These are the MWs supplied to the market –These are the MWs that will be forecasted Power limiting will be manually put in control with a Directive The control system must be fast and precise to maintain the MWs within reasonable tolerance of the Power Limit during variable and gusting wind conditions –Prevent MW from exceeding the power limit by 2% for normal wind conditions and by 5% during gusts Ramp rate limiting is required with a default rate of 10% per minute

21 Power Limiting Control Example Power Limit for the WPF 1 minute average MW cannot exceed Power Limit + 2% of the maximum authorized MW The instantaneous MW cannot exceed Power Limit + 5% of the maximum authorized MW Instantaneous MW 1 Min Average MW

22 Illustrative Example of How Power Limiting and Ramp Rate Limiting Could Coordinate

23 SCADA Requirements Section 31 New SCADA signals from the facility to the AESO –Potential MW capability signal –Power limit signal –On/off status of the power limiting controls

24 Description of potential MW capability Measured wind speed and direction Local computer calculates potential MW from the turbine WPF SCADA system collects and sums the potential MW from all turbines at the WPF Utility SCADA system sends data to the AESO

25 Wind Power Forecasting Data Collection Section 32 Met tower with 2 weather measurement devices –measurement at the wind turbine generator hub height and another taking measurements at a height specified by the ISO Measurements are 10 minute average values –wind speed, wind direction, barometric pressure and ambient temperature AESO is currently working on details for data transfer

26 Wind Power Forecasting Data Collection Section 36 Historical data and facility information necessary for wind power forecasting –Historical 10 minute averaged meteorological data, containing details on wind speed, wind direction, temperature and barometric pressure –Historical data and records referenced in subsection for up to 2 calendar years prior to the commissioning period of wind generating facilities –Provide wind turbine generator data and records, including hub height, turbine land coordinates, turbine power curves, high wind speed cut-out, and any applicable temperature cut-outs

27 Other Changes Transfer trip or anti-islanding schemes are proposed additions where the facility is not required to voltage ride through Monitoring requirements were a “may require” - we are now proposing a “must require” Harmonic and Flicker measurements/tests were a “must require” - we are proposing a “may require” Figures and tables moved into appendixes

28 Next Steps January 22, 2010 –Stakeholder comments back to the AESO February, 2010 –Post Stakeholder comments –Post AESO response to stakeholder comments March 2010** –File Wind Technical Rule with AUC **Date may change depending on any material changes as a result of consultation

Questions ?

30 Contact Information John Kehler Ph: Kevin Wiens Ph:

Reliable Power Reliable Markets Reliable People Wind Power Forecasting Update Rob Baker Manager Forecasting Rob Baker Forecasting

32 Agenda – Wind Power Forecasting Pilot Study Wind Power Forecast RFP Purpose and Benefits of Wind Power Forecasts Wind Forecast Service Cost Recovery Next Steps Questions

33 Wind Power Forecasting Pilot Project AESO conducted a wind forecasting pilot project in 2006 to –Trial different methods and providers –Identify the most effective forecasting methods in Alberta –Identify the most effective providers of wind power forecasts –Educate industry on the capabilities of wind power forecasting in Alberta Project funded by Dept of Energy, Alberta Energy Research Institute, AESO with expertise provided by CanWEA Wind forecasters were AWS Truewind, energy & meteo, and WEPROG Industry working group monitored results from pilot project and provided recommendations to AESO used to develop Forecasting Service RFP

34 Wind Power Forecasting RFP AESO issued a request for proposals in June 2009 The objective of the RFP is to solicit proposals to deliver accurate wind power forecasts for the AIES with these outcomes: –Availability of a production Wind Power Forecasting Service for the AESO –Accuracy and reduced uncertainty of wind power forecasts –A high quality Wind Power Forecasting Service and ongoing performance improvements AESO involved industry stakeholders (ENMAX, Canadian Hydro, Shell, Suncor, TransAlta, and CanWEA) to provide input and advice to the AESO regarding the selection and RFP review process Negotiations with a vendor are underway

35 Purpose and Benefits of Wind Power Forecasts AESO Reliable operation of the power system –Ancillary service forecasting and procurement –Supply adequacy Wind Developers Each individual wind generating facility will have access to the forecast for its facility Industry / Market Participants Aggregate forecasts provided on the AESO website Transparency of aggregate wind forecasts to market participants

36 Wind forecast service cost recovery External wind power forecasting service cost will be allocated amongst wind power facility owners as a $/MWh charge Cost recovery will begin in Q and will be levelized over Q and the subsequent 3 years An escalation factor of 10% to the $/MWh rate will be applied Variances from forecast costs and revenues will be reconciled on an annual basis

37 Next Steps Finalize contract and announce successful vendor AESO expects to start receiving wind forecast data in January 2010 Phased implementation of IT infrastructure for data management and integration into AESO system operator tools Establish a Wind Power Forecasting Working Group for continuous improvement on forecasting performance

Questions ?

39 Contact Information Rob Baker Ph:

Reliable Power Reliable Markets Reliable People Transmission Constraints Management (TCM) Gordon Nadeau Market Design Specialist

41 Agenda TCM Rule 9.4 AUC Re-Filing Proposal Discussion Paper –AUC Decision : Review AESO views on Commission findings Review AESO proposals on Commission directions Remedial Action Scheme (RAS) in the planning domain –Review AESO approach in RAS comment response matrix

42 Proposed TCM Rule 9.4 Protocol Steps to Manage Constraints 1.Determine effective generation and load 2.Directives to generate above MC are canceled 3.Dispatch off downstream Dispatch Down Service (DDS) providers 4.Curtail imports/exports as appropriate 5.Curtail downstream Demand Opportunity Service (DOS) 6.Dispatch effective TMR (use DDS to reconstitute price) 7.Curtail upstream energy in reverse merit order (RMO) based on energy offer price followed by pro rata, if congestion is sustained beyond T-2 period, use pro rata only 8.Dispatch downstream energy using the merit order up to replace the curtailed upstream energy 9.Curtail downstream load 10.When curtailing effective upstream assets, curtail ancillary services before energy

43 Review of Findings in AUC Decision on TCM Rule 9.4 Economic Dispatch: The use of the merit order for dispatch instructions is aligned with regulation. Price Impact: Price impact of the TCM rule will be reasonable under current and anticipated market conditions. Compensation: Constrained down payments are not contemplated under regulation.

44 Review of Findings in AUC Decision on TCM Rule 9.4 Transmission “rights”: Regulation provides for reasonable system access which does not equate to a “right”. The AESO is allowed to assign a RAS under regulation where appropriate. Use of TMR/DDS: The use of TMR/DDS may be applicable in certain situations but that it is not appropriate in all constraint situations.

45 AESO Proposals regarding Commission Directions on TCM Rule 9.4 Directions: Scope of Rule Use of TMR Pay as bid protocol Define fundamental terms Clarify TCM process steps Proposal: 9.4 is real time rule only TMR for reliability only and not price management Pay as Bid not recommended Definitions provided for load pocket and other terms Explain use of TMR/DDS within steps

46 Pay as Bid Discussion Pros Price impact of constraint removed Creates separate side payments for constraints Congestion costs may be lower than proposed TCM protocol Cons Does not promote price fidelity under current market design Not the best price signal and may not be effective in managing constraints Not a generic, in-market solution that applies to all constraint cases Operationally and administratively complex to implement

47 Pay as Bid Discussion AESO Conclusions Price signal is the appropriate method of encouraging FEOC behaviour not out of market solutions The Rule 9.4 protocol: –Is effective and practical –works within current market framework –Is a single protocol that deals with all constraints –Promotes price fidelity by minimizing the price impact and level of market distortion The AESO does not recommend using any pay as bid protocol within the TCM Rule Severe market distortions are not constraint management issues and will be dealt with appropriately through other means

Reliable Power Reliable Markets Reliable People Remedial Action Scheme (RAS) in the Planning Domain

49 RAS in the Planning Domain Stakeholder comments on the RAS discussion paper and the AESO response to those comments were published in December 2009 A review of the AESO approach is provided to facilitate ongoing stakeholder consultation on RAS

50 RAS Discussion Transmission Regulation gives the AESO the authority to use RAS RAS is permitted under the Transmission Regulation section 15(1), however, RAS is not an alternative to major system upgrades or key transmission paths RAS can be temporary or permanent under section 15(1) Specific temporary RAS exceptions are allowed under sections 15(2) and 15(3)

51 RAS Discussion Overarching RAS rules are appropriate Requirement for RAS determined by Reliability Criteria and Alberta Reliability Standards - It is not appropriate to have RAS criteria in the ISO rules Reliability Criteria documentation to be reviewed in 2010 and specific RAS criteria will be discussed

52 RAS Discussion Two types of RAS: Connection RAS and System RAS, each of which serve different purposes and require different approaches Connection RAS Assigned to and paid for by customers on a last in first off basis - Alternatively, the customer can choose to wait until facilities are built Is temporary, however, the AESO can only provide an estimate of when it is no longer needed Customers do not receive compensation for being connected to a RAS

53 RAS Discussion System RAS May be assigned or procured Customers do not receive compensation for being constrained down May be permanent System RAS applications unique: –May develop over time with no single cause –Variety of solutions may exist –Could involve generation or load or both –Compensation may be a consideration depending on the purpose and who benefits from the protection –Each application will require consultation on a case by case basis –May require high level guiding rule

54 Next Steps Comments on the TCM paper due January 15, 2010 AESO response to comments will be provided and may proceed to re-filing Rule 9.4 with the AUC in Q1 OPPs will be filed in stages in 2010 and full implementation of Rule 9.4 thru OPPs and systems to proceed on a yet to be determined schedule Consultation to proceed on RAS rules and a RAS Information Document in Q1

55 Contact Information Gordon Nadeau Ph: