David Fritz XPP June 17, 2008 1 The X-ray Pump-Probe Instrument Instrument Scientist: David Fritz Second Scientist:

Slides:



Advertisements
Similar presentations
SXC meeting SRON, July 19-20, SXC meeting 19-20/07/2007 Alignment Positioning of mirror with respect to detector (internal). Positioning of total.
Advertisements

Research Opportunities at LCLS September 2011 Joachim Stöhr.
Tom Fornek LUSI 12 November 2008 SLAC National Accelerator Laboratory 1 LUSI Status Update Tom Fornek Project Manager.
Tom Fornek LUSI June 17, LUSI UPDATE – June, 2008.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
David Fritz LCLS FAC Meeting Oct. 30, X-ray Pump-Probe Instrument David Fritz Instrument Overview Instrument Layout System.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
LCLS Studies of Laser Initiated Dynamics Jorgen Larsson, David Reis, Thomas Tschentscher, and Kelly Gaffney provided LUSI management with preliminary Specifications.
Aymeric Robert XCS 11/12/2008 SLAC National Accelerator Laboratory 1 X -ray C orrelation S pectroscopy Instrument Aymeric.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 1 Diagnostics/Common Optics:
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
XCS Aymeric ROBERT 1 LUSI X-ray Correlation Spectroscopy Instrument Advanced Procurement Review : Large Angle Detector Mover.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
D. M. Fritz LCLS FAC Meeting April 16, 2007 XPP Instrument X-ray Pump-Probe Instrument D. M. Fritz Pump-probe Experiments System.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
JINR: J. Budagov, V. Glagolev, M. Lyablin, G. Shirkov CERN: H. Mainaud Durand, G. Stern A laser based fiducial line for high precision multipoint alignment.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
XCS Aymeric ROBERT 1 LUSI X-ray Correlation Spectroscopy Instrument Advanced Procurement Review : Large Offset Monochromator.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Constraints-based Motion Planning for an Automatic, Flexible Laser Scanning Robotized Platform Th. Borangiu, A. Dogar, A. Dumitrache University Politehnica.
Auger Electron Spectroscopy (AES) 1. Brief History Auger Effect discovered in 1920’s Meitner published first journal Auger transitions considered noise.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
David Fritz LUSI DOE Review July 23-24, 2007 XPP (WBS 1.2) Breakout 1 X-ray Pump-Probe (WBS 1.2) David Fritz System Specifications.
Understanding typical users for this instrument Graduate studentGraduate student –not an X-ray expert but wants to make a spatially resolved measurement;
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
Experimental Setup of the H8-RD22 Experiment Massimiliano Fiorini (on behalf of the H8-RD22 Collaboration) University of Ferrara – INFN Ferrara CARE HHH.
DECam Daily Flatfield Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
FIG. 5.1 Multiple scattering is viewed as a random walk of the photon in diffusing wave spectroscopy (DWS)
X-Ray Measurement Methods From Chapter 6 of Textbook 2 and other references Diffractometer Hull/Debye-Scherrer method Pinhole method Laue Method Rotating.
Date Event Global Design Effort 1 Platform Moved on Hillman Rollers, Deformations John W. Amann ILC – Mechanical Engineering 9/12/07 IREng07.
LCLS Facility Planning for LCLS-II. 2 LCLS vs. LCLS-II NowHXU - CuSXU - CuHXU - SCSXU - SC Photon Energy Range (eV)
NMX Instrument Layout and End-station Giuseppe Aprigliano Lead Instrument Engineer NMX IKON 7 September 15 th, 2014.
Contents: 1. Introduction 2. Gyroscope specifications 3. Drift rate compensation 4. Orientation error correction 5. Results 6. Gyroscope and odometers.
Summer '07 at CLS Small Angle X-Ray Scattering Peter ChenChithra Karunakaran & Konstantine Kaznatcheev.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
ΜD Series 9 LFB --- CYCLOPS. Provides technical support for sister companies including robotic system design and fabrication, equipment maintenance Founded.
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
X-ray Correlation Spectroscopy (WBS 1.4) Aymeric Robert
Experimental Facilities Planning
X-ray Pump-Probe (WBS 1.2) David Fritz
X-ray detectors and diagnostics for HED instrument
LUSI Diagnostics & Common Optics WBS 1.5
LCLS Instrument Development
FRED A software tool for modern optical engineering
X-ray Pump-Probe Instrument
Multiplexing of LCLS II SXR beamlines using a canted undulator concept
LUSI X-ray Pump-Probe Instrument WBS 1.2
Development of LCLS Far Experimental Hall Hutches
X-ray Pump-Probe Instrument
X-ray Pump-Probe Instrument
LUSI WBS 1.2 X-ray Pump Probe Status Review
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
X-ray Correlation Spectroscopy Instrument
Test Beamline System Requirements and Charge to PDR Committee
Fixed Support Design & Testing
LUSI Status and Early Science
X-Ray Endstation Systems (XES) 2006 Schedule
Presentation transcript:

David Fritz XPP June 17, The X-ray Pump-Probe Instrument Instrument Scientist: David Fritz Second Scientist: Marc Messerschmidt Lead Engineer: J. Brian Langton Designer: Jim Defever Designer: Jim Delor

David Fritz XPP June 17, Outline Brief Instrument Overview Sample Goniometer System Detector Mover System Optics Table Design Conclusion

David Fritz XPP June 17, XPP Experimental Techniques Time-Resolved X-ray Diffraction (TRXD) Time-Resolve Diffuse Scattering (TRDS) Time-Resolved Protein Crystallography (TRPX) X-ray Emission Spectroscopy (XES) Small Angle X-ray Scattering (SAXS) Optical Probing of X-ray Transients * The instrument budget is not sufficient to provide capability to all techniques

David Fritz XPP June 17, XPP Instrumentation Categories X-ray Beam Preparation (spatial profile, intensity, spectrum, repetition rate) Delivery to sample Characterization (spatial profile, intensity, arrival time) Optical Beam Creation Preparation (spatial profile, intensity, spectrum, repetition rate, temporal profile) Delivery to sample Characterization (spatial profile, intensity, spectrum, temporal profile) Sample Environment Orientation & Positioning X-ray Detection

David Fritz XPP June 17, Instrument Block Diagram

David Fritz XPP June 17, XPP Instrument Location XCS AMO (LCLS) CXI XPP Endstation Near Experimental Hall Far Experimental Hall X-ray Transport Tunnel

David Fritz XPP June 17, Instrument Layout – Plan View

David Fritz XPP June 17, Detector Mover – Design Goals Flexibility to accommodate a wide variety of sample environments Capable of orienting small samples (~ 50 μm) over a wide range of reciprocal space Sphere of confusion < 30 μm Open access to allow close proximity laser optics No interference with direct beamline while in monochromatic mode

David Fritz XPP June 17, Sample Goniometer – Tilt Platform 400 mm x 400 mm top surface ± 5°angular range of arc segments Large load capacity (>> 50 kg) 200 mm working distance

David Fritz XPP June 17, Sample Goniometer – Tilt Platform (2)

David Fritz XPP June 17, Sample Goniometer – Kappa Configuration

David Fritz XPP June 17, Detector Mover – Design Goals Operate in both interaction points 10 cm – 100 cm sample to detector distance in forward-scattering upper hemisphere quadrant 10 cm – 50 cm sample to detector distance in back-scattering upper hemisphere quadrant Repeatable position the XPP detector pixels to a fraction of the pixel size Definitively know the position of all detector pixels to a fraction of the pixel size

David Fritz XPP June 17, Detector Mover – Coordinate System

David Fritz XPP June 17, Detector Mover – Coverage Requirements

David Fritz XPP June 17, Detector Mover – Concept 6-axis Industrial Robot Load capacity (> 20 kg) ± 50 µm repeatability Floor or ceiling mountable No counterweights Remotely variable sample to detector distance Remote control of detector clocking angle

David Fritz XPP June 17, Detector Mover – Path Forward Engineering and manufacturing will be broken up into 3 work packages Statement of work 1 Verify that a industrial robot has the capability of meeting motion requirements Statement of work 2 Create a concept for integrating robot into the XPP instrument Statement of work 3 Manufacturer, install, test and integrate system

David Fritz XPP June 17, Detector Mover – SOW 1 Test 1 – Spherical motion and pointing System is capable of moving the detector about a spherical surface of a user defined radii while pointing the detector at the interaction region Test 2 – Repeatability Measure repeatability and hysterisis of system Test 3 – Detector Clocking Angle Measure how well the clocking angle can be controlled Test 4 – Stability Measure long term (~ hours) motion drift for various fixed positions Test 1 Test 2

David Fritz XPP June 17, Detector Mover – SOW 2 Concept for integrating system into XPP Robot arm mounting Reach requirements can be met without intruding into mechanical stay clear zones Safety system

David Fritz XPP June 17, Optics Support Table – Design Goals Repeatable position optics in two operating positions (mono, direct) Initial beam based alignment is expected for each position but the desire is to have a configuration file loaded for each operating mode without the need for alignment Stably support X-ray optics and diagnostics Design logic: Optical axis will be defined by XPP slits X-ray optics and interaction point can drift together on the order of 100 µm with minimal impact However, the diffractometer thermal drift is an unknown It was determined that it was best to design a support table that fixes the position and alignment of the optical elements to the highest extent reasonably achievable This reduces misalignment issues to a one dimensional problem Design goals in priority order: Stability of optics with respect to each other over short and long term periods Absolute position stability Slits are the gold standard and need to be the most stable of all elements

David Fritz XPP June 17, Optics Support Table – Case Studies Analyzed component displacement due to bowing of support structure for a 2° F temp change Analyzed global displacement of entire structure due to 2° F thermal expansion Large granite surface plate with a low profile strongback was best option Themalization time constant of the granite is many days However, the drawback is the rigging effort – must be moved in through the FEH

David Fritz XPP June 17, Optics Support Table – Design Strongback has been split into two sections to minimize bowing and to prevent system overconstraints Strongback is strategically tied down to rails near locations of slits

David Fritz XPP June 17, Questions for the Committee Is the sample goniometer design optimized form the scientific goals of the instrument? Are the sample mover design requirements reasonable? Does the sample mover path forward seem reasonable? Is the design logic of the optics support table valid? Any other concerns/comments?