International Coordination and Implementation Group (ICIG) AMMA Operational Center (Niamey; NIGER)

Slides:



Advertisements
Similar presentations
FORECASTING ACTIVITIES DURING THE SOP THE WEST AFRICA SYNTHETIC ANALYSIS WASA/F APPROACH J.P. Lafore 1, Z. Mumba 2, P. Chapelet 1, N. Chapelon 1, M. Dufresne.
Advertisements

Air Traffic Management
BRAUNTON BMX CLUB The Role of the Secretary / Go-Ride contact The Secretary/Go-Ride Contact is the principal administrator for the club. This is a pivotal.
Careers in Aerospace. Chapter 1, Lesson 3 Lesson Overview Aerospace as a career option Major agencies in the aerospace sector Education required for aerospace.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Actions from DAOS-4 Action 2: WMO to set up the DAOS web pages and implement appropriate links to other projects and monitoring sites (T. Nakazawa) Action.
Current programs in Africa update Scientific Challenge: Aerosol – Cloud Interactions: Implications for precipitation and weather modification R. T Bruintjes.
AMMA - GPS network O. BockPrepared for Leeds meeting, April Status of implementation on April 1 st 2006 O. Bock, IPSL/SA, France.
Incident Command System Basic Course
JCOMM in situ Observing Platform Support Centre JCOMMOPS
OWP: Radiosondes and profilers Doug Parker, CEH Wallingford, 21 January 2005.
Organisation of the Benin AOC ( Cotonou) A. Borgstedt : coordination, link with AOC J.M. Bouchez : tech. coordinationA. Dadé: secretary C. Peugeot/S. Galle.
AMMA-UK News January MIT radar  C-band doppler radar to be deployed at Niamey  Funded for around 75 days by NASA  Planned to start 1 June 2006.
2.2 Data Group Membership: Reeves (chair), Lloyd, Morse. Reports to SSC. This group will be responsible for preparation of the AMMA-UK Data Protocol, which.
Combining satellite and surface observations to determine the radiative divergence across the atmosphere Tony Slingo Environmental Systems Science Centre.
Radar Operations during AMMA SOP Alain Protat  Benin mesosite : Scanning Polarimetric Doppler X-band radar (X-Port) + Scanning Polarimetric Doppler C-band.
LIDAR network F.Fierli, C. Flamant, F. Cairo. Scientific Task for SOP ● provide the aerosol content before convection episodes to improve the estimate.
SCOUT-O3 BALLOON/SONDES CAMPAIGN NIAMEY 26 JULY- 26 AUGUST 2006 J. P. Pommereau, A. Garnier and SCOUT-O3 team Objectives: Convective transport across tropopause.
Forecasting during the SOP1-2 Forecasting Forecast Sub-Group of the AOC/ST2 J-P Lafore, D. Parker (Leeds U.), C. Thorncroft (SUNY - US), Z. Mumba, A. Kamga,
AMMA-Africa and the African Involvement Plan (PIAF) Arona DIEDHIOU (IRD ; Niger)
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
RAINEX Real time Communications Overview NCAR, NOAA, Rest of the World Operational Products Satellite Imagery Model Products Surface Observations RECON.
Proposal to upgrade infrastructure and radars and stream data through UNIDATA back to NCAR. R. T Bruintjes, M. Moncrieff, A Laing and others Africa meeting.
Auger Project Management H. Glass Director’s Review15-Dec-2011 Fermilab (Technical Division) has hosted Auger Project Management office since collaboration.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
Firefighter III Introduction Mod A Identify the Firefighter III’s role as a member of the organization. (4-2.1) The role of a firefighter III.
Mary E. Kicza Assistant Administrator for NOAA Satellite and Information Services Responsible for Responsible for providing timely access to global environmental.
GOES Users’ Conference The Role of Geostationary Satellites in WMO’s Global Observing System Dr. Donald E. Hinsman Senior Scientific Officer WMO Satellite.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
VAMOS PROGRAMS PROJECT OFFICE C. B. Emmanuel, Director José Meitín, Deputy Director C. B.
Nursing Home Incident Command System Module 3 Applying ICS in Nursing Homes.
DAILY LOGISTICS IN MOBILE DATA COLLECTION FOR UNHCR SENS.
Communications in the Face of Crisis Lesley Bruinton Tuscaloosa City Schools.
Buckinghamshire County Council 1 Winter Service Presentation to Members November 4 th
Summary of KO meeting With some subsequent developments.
NY-ÅLESUND, SVALBARD, NORWAY A village dedicated to polar science The northernmost civilian community in the world Home to 35 people App research.
Internet, T-PARC Operations Center NPS, Monterey CA Ops. Coordination Science Team Facility Status In-field Analysis Forecast/Nowcast Data Ingest T-PARC.
Boundary-layer Pressurised Balloons & Driftsondes Status of implementation on April 1 st 2006.
AIRTANKER BASE MANAGER (ATBM).
T-PARC Operations Plan Outline Chapter 1. T-PARC Overview Chapter 2 Scientific Mission Planning Organization and Intensive Observing Period Definition.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
African Monsoon Multidisciplinary Analyses Afrikanske Monsun: Multidisiplinære Analyser Afrikaanse Moesson Multidisciplinaire Analyse Analisi Multidisciplinare.
DOW NPOL & D3R EC X-Band WSR-88D MRR Figure 14: Locations of all the available ground radars for OLYMPEX and the RHI scanning regions for NPOL and EC X-band.
Office of the Federal Coordinator for Meteorology WORKING GROUP FOR WEATHER INFORMATION FOR SURFACE TRANSPORTATION (WG/WIST) Meeting 05-4 Office of the.
State of Florida Emergency Support Function 6 1 EMERGENCY SUPPORT FUNCTION 6 - MASS CARE & EMERGENCY ASSISTANCE “Training for incoming EMAC personnel”
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
“America’s NOAA National Weather Service: Protecting Lives, Livelihoods, and A Way of Life” Water Resources Vision 2020 Deliver a broader suite of improved.
Africa Programs. Burkina Faso infrastructure Radar installation on top of control tower and King Air B-200 and hangar facilities at the airport in Ouagadougou.
Working environment WO Blanka Zelenková. Vocabulary & Definitions & Abbreviations Tower Cab – the upper part of the Control TWR where ATC crew is situated.
NORTH AMERICAN MONSOON EXPERIMENT (NAME) An internationally coordinated, joint US-Mexico process study aimed at improving warm season precipitation prediction.
International Bureau of the BMBF - Creating international research and education networks 1 Creating international research and education networks Petra.
NAME 2004 Field Operations and Procedures NAME Special Session Field Operations Center Concept: Define requirements for, and conduct the day-to-day operations,
T-PARC Operations Support Dick Dirks Jim Moore National Center for Atmospheric Research T-PARC Operations Meeting Tsukuba, Japan 7-8 April 2008.
MNCC Operational Rhythm. MULTINATIONAL COORDINATING CENTER OPERATIONAL RHYTHM Legend: * As Required Note: Operational Rhythm Change Process: Examined.
The Financial Management and the Torino Management Team tasks for URB-HEALTH thematic network Slide 1: Financial Management Organizational Chart/1 Slide.
Communications Plan: Ji Young Kim, Chul Han Song, Saewung Kim, and Jim Crawford.
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
UCAR Office of Programs University Corporation for Atmospheric Research Overview of NAME Field Catalog NAME Special Session José Meitín NAME Project Office.
WMO Data Rescue: Review of relevant outcomes of WMO constituent body sessions; Recent WMO activities Peer Hechler, Omar Baddour WMO; Data Management Applications.
Report of RAI Working Group on Climate Related Matters (WGCRM) Alphonse KANGA International Workshop on Rescue and digitalisation of Climate Records in.
SADC REGIONAL WORKSHOP ON TRADE IN SERVICES STATISTICS FEB 2016 JNB/SA International Trade in Services UNCTAD-UEMOA project Viviane MWITIREHE In.
Module 3 Organization Overview Module 3 Organization Overview Subjects to be covered in this module include: Terminology Terminology Organizational structure.
© 2016 University at Buffalo Click Training Safety Module University at Buffalo Office of the Vice President for Research and Economic Development Electronic.
SIGMA: Diagnosis and Nowcasting of In-flight Icing – Improving Aircrew Awareness Through FLYSAFE Christine Le Bot Agathe Drouin Christian Pagé.
Years of the Maritime Continent ( )
Polarstern Helicopters
José Meitín Overview of NAME Field Catalog NAME Project Office
The AMMA project: Studying the climate and environment of West Africa
CEOS Membership Issues
Presentation transcript:

International Coordination and Implementation Group (ICIG) AMMA Operational Center (Niamey; NIGER)

International Science and Steering Committee (ISSC) International Coordination and Implementation Group ( ICIG ) TT1: RS, GPS, Pilots, VHFTT2a: Flux stations, Scint TT2b: Dust, Aerosol, RadiationTT3: Gourma Meso-Site ObsTT4: Niamey Meso-Site ObsTT5: Ouémé Meso-Site ObsTT7: Dry periodTT8: Wet periodTT9: Export EOP TTsSOP TTs TT6: Oceanic campaigns ST1 ST2 Ocean (B. Bourles) Senegal (F. Roux) Benin (A. Borgstedt) Mali (F. Lavenu) Burkina (B. Stefano) Tamanrass. (C. Flamant) Chad (P. Drobinski) AMMA Operational Center ST3 (database) ST4 (partnership) Overall Coordination NIGER (Project Office)

The Principal AMMA Operational Center (Niamey) AOC-Niamey must provide the following functions: a) Coordination of the surface, altitude and airborne instruments to maximize synergies in order to meet the ISSC’s and ICIG’s scientific and operational objectives. b) Organisation of briefings and support for the daily decision-making c) Writing daily summary of the weather situation and the development of the monsoon system during SOPs. d) Daily archiving of the operational status of the equipment during the EOP and the SOPs; e) Daily support for the teams working in Niger for AMMA’s campaigns.

The Principal AMMA Operational Center (Niamey) On the logistical side, the AOC will provide information or assistance on the following items : a) Phones and general communications b) Accommodation c) Transportation requirements d) Availability of funds e) Electricity and fluids f) Medical assistance For further information, refer to the implementation guide

Communications Serge Legouis Organisation of the Principal AOC in Niamey (Niger) Administrative Tasks Cheikh Kane Logistics Cheikh Kane Scientific Secretary Norbert Raynal Forecasting Jean Philippe Lafore National Committee Cheikh Kane Aircraft Frederique Said ARM, GPS, RS Arona Diedhiou Balloons Arona Diedhiou MIT Radar Thierry Lebel Relations with TTs Thierry Lebel Secondary AOCs Thierry Lebel Overall Management Arona Diedhiou Operations in NIGER

AOC Coordination Center (IRD) ACMAD Center Niamey Airport ASECNA/DMN/DAC Niger Air Force Civil Airport Military Airport AMMA Forecasting Center General coordination of the AOC Visiting scientists room GPS ARM Radio soundings MIT C-band Radar (US) SOP Secondary AOCs (Burkina, Benin, Dakar) ECMWF, NWP, MSG, models (Meteo-France,Toulouse) PUMA and RETIM The AMMA Operation Center in Niger : Locations, roles and network Ground Measurement EOP/LOP Radiosoundings, AERONET, IDAF,GPS, Flux stations EOP/LOP config

AOC Coordination Center (IRD) ACMAD Center SOP Coordination Center (Met.Office; DMN) Niamey Airport ASECNA/DMN/DAC Niger Air Force Civil Airport Military Airport AMMA Forecasting Center General coordination of the AOC Visiting scientists room Daily briefings AMMA-Niger room Office for the scientific secretary, IST. Room with computers (quick look..) Visiting scientists room UK aircraft team ARM (AMMA-US) GPS Radio soundings French aircraft team German aircraft team Balloons (CNES, FR) MIT C-band Radar (US) SOP Secondary AOCs (Burkina, Benin, Dakar) (Banizoumbou, Gourma) ECMWF, NWP, MSG, models (Meteo-France,Toulouse) PUMA and RETIM The AMMA Operation Center in Niger : Locations, roles and network Ground Measurement EOP/LOP Radiosoundings, AERONET, IDAF,GPS, Flux stations SOP config

Questions related to the main AOC a) ST2, linking with TT8 b) Communications Phone link to Banizoumbou (cell phones versus INMARSAT) MIT images: where, how ? Links with secondary AOCs c) Human resource for the coordination (contrib of science team). d) Human resource for ground based instruments (SOP intense operation mode: radiosoundings, MIT radar, ) e) Partnership with Africans (field school)

Questions related to secondary AOCs a) Djougou Products to be sent to Niamey through FTP Schedule of communication Feedback from Niamey b) Ouagadougou Requests ? What kind of connection Access to the SOP website; Niamey, Toulouse ?? Mirror site in Ouaga ?? c) Gourma Requests ? What kind of connection d) Dakar ??

SOP OPERATIONS The objectives of the SOP coordination are: a) To review and select the most promising scientific activities for the coming days, based on environmental analyses and predictions, previous activity the ‘opportunity’ given by a forecast; b) To manage and to maintain information on the operational status of instruments, on the current environmental situation, on the records of previous and ongoing activity, and on the planned activities of PIs;

SOP Operations (continue) c) To select the most suitable operational modes and timings of ‘responsive’ ground-based instruments and aircraft; d) To implement decisions on Intensive Observing Period (IOP)based on the current and predicted environmental conditions, and the status of operational facilities; e) To communicate decisions to all of the necessary teams and personnel;

Coordination structure during operations a) Scientific Coordinator: acts as chair of the IOP Selection Team, member of the AMMA-ISSC Executive Bureau and is assisted by a deputy. Takes final decision on the type of IOP to be run. b) Scientific secretary: liases with forecasters and instrument PIs; in charge of collecting all forecasts, and making the information available on the relevant web pages; in charge of writing the minutes. c) Facility Supervisor in charge of the information flow between the primary AOC and the secondary AOCs as well as the isolated sites (Tamanrasset, Dano, R/V Atalante, etc..); in charge of summarizing the daily status of each instrument/platform. d) Logistics manager Responsible for maintenance of the logistical programme during SOP, Reports to the Scientific Coordinator.

Planning an IOP a) IOP Selection Team (IST) IOPs will be selected by an IST. A nominal maximum membership is 12 people on any given day. The management group for each key platform or instrument will nominate its own PI for a given day, who will have final responsibility for the activities of that platform or instrument in the IST. The IST will be chaired by the Scientific Coordinator. b) IOP Planning Group (IPG) Following the discussions of the IST, a small IOP Planning Group will work on detailed flight plans (to be activated the following day), and will, where necessary, choose between IOP options, and abort when necessary. c) Operational forecasting team The operational forecast team will operate at ACMAD and will be coordinated by Meteo-France with forecasters from Niger and from other African countries. An ideal mode of activity will be for the operational forecasters to work in a combination of daily shifts and ‘responsive’ activity during IOPs.