Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group
Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Work on system design à Breakout boards ordered à Sensor connectors specified and ordered Solenoid Valves received ARC PC Card Cage received
Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Solid State Relays Arrived Lab View Errors Resolved à File for digital temperature sensor addresses à File for run history required Power Transformer Board Layout
Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Current Needs NIM Crate from SLAC with plugins Move BaBar Chiller in CMS Test Lab Plumb dry air to test system
Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Solenoid Valve Panel Layout for shop Complete Schematics for Analog I/O and Digital I/O Breakout Boards Set up Temperature Sensors and verify calibration and Communication à Read unique sensor firmware addresses à Generate Digital Sensor file
Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Fabricate Analog I/O Breakout Board Test Humidity Sensor against Sensirion sensor Fabricate Power Transformer board Reverse Engineer Peltier Relay Board from CERN