Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.

Slides:



Advertisements
Similar presentations
XMM EPIC MOS Jenny Carter 4 th EPIC BG WG Meeting Mallorca, 25/10/06 BGWG blank sky data analysis Jenny Carter, University of Leicester.
Advertisements

WORK PLAN FOR THE EPIC CALIBRATION TEAM (AND BEYOND)
XMM Calibration/Ops Meeting Mallorca October Using 3X3 Binned Mode for MOS Cameras for Fast(er) Imaging Tony Abbey, Leicester University.
Bruno Altieri EPIC Calibration meeting, Feb. 1-3, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC The XMM-Newton cross-calibration.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
European Space Astronomy Centre Villafranca del Castillo, Madrid, Spain A.M.T. Pollock XMM-Newton SOC EPIC calibration October 2006 Calibration of.
Experience with combined Fe55/Vela SNR calibration - MOS Andrea Tiengo INAF, IASF-Milano In collaboration with: Mariachiara Rossetti (IASF-Milano) Martin.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 EPIC pn at low energies: LW mode Properties of EPIC pn at low energies: LW mode.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
MOS 3x3 mode slow slew survey Richard Saxton October 2006.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 EPIC pn: Jumps in the energy scale Sudden jumps in the absolute energy scale and their origin.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
EPIC TTD#14 SCIENCE OPERATIONS Mallorca, 01 February 2005 L. Metcalfe SCI-SDX Science Support Manager 1 Science Operations & Data Systems Division Research.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 CTI.. update for EPIC pn EPIC pn: Update on the CTI, the absolute energy scale and the energy.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 Suppression of the low-energy noise Suppression of the low-energy noise: an improved approach.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Martin Stuhlinger Mallorca, European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with SASv7.1 CAL Meeting.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group Palma de.
XMM EPIC MOS Jenny Carter 8 th EPIC BGWG Meeting Mallorca, March 09 Jenny Carter, University of Leicester Andy Read, University.
XMM EPIC MOS Andy Read 6 th EPIC BG WG Meeting Mallorca, Spain 05/11/07 Agenda:
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
Guillermo Buenadicha / Neil Cheek SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha Neil Cheek MALLORCA 26/10/2006.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Andy Read OPS/CAL/BG (OCB) Meeting Mallorca, Spain 05-07/11/07 Report from the BGWG (05/11/07) Andy Read, on behalf.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Cross-Calibration between XMM-Newton and Chandra Herman L. Marshall Chandra X-ray Center, MIT Kavli Institute.
JCN, Justice Cooperation Network European treatment and Transition management of High Risk Offenders.
The Slow Slew Survey Richard Saxton / Pedro Rodriguez November 2006.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
UID Program Plans.  Template Released after last JACG 14 October  Comments Rec’d from the Air Force and the Army Plans need to address: Cost, schedule.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
XMM-Newton Users Group Meeting #6 Science Support ESAC, 19 th. / 20 th. May 2005 L. Metcalfe SCI-SDX 1 Science Operations & Data Systems Division Research.
Jan 2016 Solar Lunar Data.
August ICA Agenda Time Topic 8:00 – 8:15
IT Strategy Roadmap Template
ctclink Steering Committee
XRN 4927 – MiR Drop 4 - Status Update
Presentation transcript:

Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton

Meeting/action Status SubjectActioneeDue EPIC TTD-0014/3 Open Explain increases in pn offset variance in the 840M. Smith to 870 plus revolution range EPIC TTD-0014/5 OpenProvide an agenda draft for a hypothetical OBSW G. Buenadicha contract meeting addressing all concerns raised during the presentation EPIC TTD-0014/9 Open Make MOS2 CCD5 effect public M. Stuhlinger EPIC TTD-0015/2 Open Identify what is needed for testing and preparing M. Casale for the use of redundancies EPIC TTD-0015/3 Open Subsequently to evaluate and decide which of the A. Abbey items resulting from action 15/2 can be delivered EPIC TTD-0016/1 Open Investigate the possibility of MOS small window A. Abbey mode in peripheral ccds M. Casale EPIC TTD-0016/2 Open Provide SOC with the sequence for MOS extended A. Abbey small window mode. 2 Science Operations & Data Systems Division Research & Scientific Support Department Page 2 XMM-Newton ACTIONS

SCIENCE OPERATIONS STATUS for EPIC TTD MEETING PALMA de MALLORCA 26 October 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 3 Science Operations & Data Systems Division Research & Scientific Support Department Page 3 XMM-Newton

CONTENTS Significant meetings and dates Operations: Status & Modes General Calibration Points Data Processing - SSC Miscellaneous 4 Science Operations & Data Systems Division Research & Scientific Support Department Page 4 XMM-Newton

SIGNIFICANT MEETINGS AND DATES 5 Science Operations & Data Systems Division Research & Scientific Support Department Page 5 XMM-Newton

SIGNIFICANT MEETINGS Users Group Meeting #718/19May2006 SAS Workshop May-02Jun.2006 ICWG meeting, Iceland 14-16Jun.2006 Variable & Broad Fe Lines around Black Holes26-28Jun.2006 EPIC Background Working Palma 25Oct.2006 EPIC Cal./Ops. Palma de Mallorca26-27Oct.2006 SSC Consortium Potsdam13-15Nov.2006 (incl. SAS Wk. Group Meeting) OM Cal. & TTD ESAC late 2006 EPIC Cal. ESAC 18-19Jan.2007 Inter-mission X-ray cross-calibration 08-11May2007 Intnl. Working Group on cross-cal. & the defn. of X-ray standards no.II. ESAC Science Workshop 2007: Legacy Science modes 04-06Jun.2007 Users Group meeting # Jun.2007 SAS Workshop Jun.2007

SIGNIFICANT DATES I Proceedings of 2005 conference (“The X-ray Universe 2005”) Distributed Mar.2006 Calibration Progress, especially with RGS (t dept.) vs EPIC, at UG#7May2006 EPIC Background Working Group toolsApr. & June2006 SAS SAS 7.0 release (+ RGS vs EPIC cal. Improvements) 30 June2006 to be used for the reprocessing 7 Science Operations & Data Systems Division Research & Scientific Support Department Page 7 XMM-Newton

SIGNIFICANT DATES II XSA XSA 2.9 Querying other ArchivesApr.2006 XSA 3.0 Release of the Slew Survey Catalogue03May2006 XSA 3.5 2XMM-beta 28Aug XMM-beta Released by SSC 24 July2006 and through XSA Aug Science Operations & Data Systems Division Research & Scientific Support Department Page 8 XMM-Newton

SIGNIFICANT DATES III AO6 Call AO6 Call 28 Aug.2006 Closed Phase I 06 Oct.2006  595 valid proposals yielding an over-subscription of 6.91 Open phase II 15 Jan.2007 Close XRPS 09 Feb.2007 Begin AO6 observations May Science Operations & Data Systems Division Research & Scientific Support Department Page 9 XMM-Newton

OPERATIONS 10 Science Operations & Data Systems Division Research & Scientific Support Department Page 10 XMM-Newton

STATUS and MODES  All instruments essentially stable  Slew Mode tests on rev.1242 (Sept.19-21) went well  essentially ready with EPIC (pn & MOS) and RGS instruments  but SOC systems need to handle slew scheduling less manually  also OM mode  RGS2 ADC-problem glitch  now better understood  see dedicated splinter on contingency preparation  Slewing / re-pointing ‘mode’ for RGS !  implementation requirements/plan by end-year ??

APOGEE GAP & SANTIAGO COVERAGE  Santiago provided coverage across Kourou-Perth gap allowed continuous coverage throughout complete revolution  Gap shrinking through years & closes by end 2007  By end 2006: the gap in telecommanding is as little as 35 minutes and telemetry gap totally disappeared  Decided to discontinue Santiago as of 1 Dec  Plot shows evolution of apogee gap from 2006 to 2010

13 Science Operations & Data Systems Division Research & Scientific Support Department Page 13 XMM-Newton In the graph the TC gap on 01/12/2006 is ~1300 sec (22 min) to which a little margin (say 10 min) is added for acquisition of signal, carrier sweeping, etc.

APOGEE GAP & SANTIAGO COVERAGE In the 810 revs. from 450 to 1259 there were 5 cases of instrument closure due to soft protons (detected by the instruments themselves) at the time of the Santiago pass around apogee -/+ 2 h 1) Rev-614:instruments were closed for 35min 2) Rev-621:instruments were closed for 2 h 20min 3) Rev-628:instruments were closed for 20min 4) Rev-873:instruments were closed for 1 h 30min 5) Rev-1149:instruments were closed for 1 h 35min The probability of having an alert at that point in the revolution is, for the period considered, about 0.62 % (note also that three cases were very close together in rev-614 to 628 due to exceptionally high solar activity, so this could actually bias a bit the statistics and make it slightly worse). 14 Science Operations & Data Systems Division Research & Scientific Support Department Page 14 XMM-Newton

Science Operations & Data Systems Division Research & Scientific Support Department Page 15 XMM-Newton

Science Operations & Data Systems Division Research & Scientific Support Department Page 16 XMM-Newton

Science Operations & Data Systems Division Research & Scientific Support Department Page 17 XMM-Newton

Science Operations & Data Systems Division Research & Scientific Support Department Page 18 XMM-Newton

Science Operations & Data Systems Division Research & Scientific Support Department Page 19 XMM-Newton

Science Operations & Data Systems Division Research & Scientific Support Department Page 20 XMM-Newton

Science Operations & Data Systems Division Research & Scientific Support Department Page 21 XMM-Newton

Science Operations & Data Systems Division Research & Scientific Support Department Page 22 XMM-Newton

GENERAL CALIBRATION POINTS 23 Science Operations & Data Systems Division Research & Scientific Support Department Page 23 XMM-Newton

CCF RELEASE NOTES IN PERIOD XMM-CCF-REL-220 RGS1 CCD9 node1 CTIX scale factor 11Aug2006 XMM-CCF-REL-218 RGS cool pixels 29Jun2006 XMM-CCF-REL-217 RGS background spectra templates 28Jun2006 XMM-CCF-REL-216 A new model for RGS effective area 29Jun2006 XMM-CCF-REL-215 RGS per.-CCD sens. 2&3 order gr.eff. 29Jun2006 XMM-CCF-REL-214 Revision of the RGS CCD gains 27Jun2006 XMM-CCF-REL-213 Evolution of the RGS CTI 29Jun2006 XMM-CCF-REL-212 Tuning RGS Instr. MgF2 abs. Mkn421 27Jun2006 XMM-CCF-REL-207 Update of EPIC MOS Gain 17May2006 XMM-CCF-REL-206 Update of EPIC MOS CTI 24May2006 XMM-CCF-REL-204 EPIC PN Bad Pixels 06Mar2006 XMM-CCF-REL-203 Long term EPIC-pn CTI refinement 05Apr2006

NRCOs 59 RGS long- response & MOS CTI with Vela Refinement of pn-CTI corr. (follow-up NRCO 34) Establishing X-ray stdrds: RGS and RXJ The RGS response to the Crab X-ray standard RGS CTI calibration Verification of the EPIC high energy resolution Investigation of the random EPIC-pn gain scatter Verification of the EPIC-pn relative timing RGS long- response & the MOS CTI with Vela EPIC-pn Burst mode energy calibration refinement

DATA PROCESSING - SSC 26 Science Operations & Data Systems Division Research & Scientific Support Department Page 26 XMM-Newton

Science Operations & Data Systems Division Research & Scientific Support Department Page 27 XMM-Newton Turn-around time between data acquisition and GO (PIPE) delivery as of 31-March-2006

MISCELLANEOUS PUBLICATIONS OTHER … 28 Science Operations & Data Systems Division Research & Scientific Support Department Page 28 XMM-Newton

29 Science Operations & Data Systems Division Research & Scientific Support Department Page 29 XMM-Newton Oct  1224

30 Science Operations & Data Systems Division Research & Scientific Support Department Page 30 XMM-Newton

XSA 31 Science Operations & Data Systems Division Research & Scientific Support Department Page 31 XMM-Newton