Engineering Management MSE507 Lean Manufacturing Introduction Lean Thinking versus Muda.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

International Campus – Kish Sharif University of Technology Session#6.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Operations Management and Quality
Operations Management Just-in-Time Systems Supplement 12
MSE507 Lean Manufacturing
CSUN - Prof. David Shternberg
Business Plan Preparation Introduction Frank Moyes Leeds School of Business University of Colorado Boulder, Colorado 1.
MSE507 Lean Manufacturing
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on down, simply by spending his money.
© 2007 Prentice Hall, Inc. All rights reserved.7–1 Chapter 7 Operations Management and Quality.
Engineering Management MSE507 Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
MSE607B Systems Engineering
Chapter 6, Process-Flow Analysis
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #2.
Lean and Sustainable Supply Chains. 1. Describe how Green and Lean can complement each other. 2. Explain how a production pull system works. 3. Understand.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Basics of Lean How to See and Eliminate Waste Slides courtesy of Doug Fingles, MERC.
Value Stream Mapping.
The Value of Lean Thinking Presented by: Brian D Krichbaum Process Coaching Incorporated.
Continuous improvement is about removing stuff that get in the way of your things working well. Lean Thinking.
NETA PowerPoint Presentations to accompany The Future of Business Fourth Edition Adapted by Norm Althouse, University of Calgary Copyright © 2014 by Nelson.
Value Stream Mapping. Introductions & Objectives Value Stream Mapping.
Business Essentials, 7th Edition Ebert/Griffin
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
10 Aug 2010 ECE/BENG-492 SENIOR ADVANCED DESIGN PROJECT Meeting #2.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
Lean Basics Dewey Warden.
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 Prentice Hall, Inc. All rights reserved. Operations Management.
MSE507 Lean Manufacturing
JUST IN TIME Operational Systems for Manufacturing… JIT and Lean Production.
Lean Manufacturing Chapter 15 pp June 29, 2012.
COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.
Facility Planning and Material Handling. Today’s Agenda Information on syllabus Office hours Text Grading Exams & Homework Class format Introductory lecture.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #9.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #12.
Operations Management Optimising operations. The aim of an OM system is to extract maximum productivity and quality from the production process. This.
Chapter 12 THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition Chapter Achieving World-Class Operations.
7 chapter Business Essentials, 7 th Edition Ebert/Griffin © 2009 Pearson Education, Inc. Operations Management and Quality Instructor Lecture PowerPoints.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Shelve more with less – with Lean Nancy Kress University of Nevada Las Vegas.
Designing, Controlling, and Improving Organizational Processes.
Lean Manufacturing. Why do this? Lets look at jobs on Monster.com that refer to Lean - ployer/?WT_srch=1&s_kwcid=job%20ope.
7 chapter Business Essentials, 8 th Edition Ebert/Griffin Operations Management and Quality Instructor Lecture PowerPoints PowerPoint Presentation prepared.
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Value Stream Mapping The flow of your business from start to customer March 8, 2012.
Just In Time Manufacturing Push Manufacturing vs. Pull Manufacturing Push System: Traditional production system as parts are processed based on the master.
Lean Manufacturing. Lean Enterprise - A business system for organizing and managing product development, operations, suppliers and customer relations.
Lean Production Strategy Lean Manufacturing Strategy
Lean Manufacturing Series
Chapter 27 Cost Management for Just-in-Time Environments
MSE507 Lean Manufacturing
MSE507 Lean Manufacturing
Pull Manufacturing and Just In Time
Lean Thinking ‘’ A small Professional Approach ‘’
Welcome to my presentation
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

Engineering Management MSE507 Lean Manufacturing Introduction Lean Thinking versus Muda

Learning Objectives Present an overview of lean manufacturing concepts Introduce methods and tools designed to put these concepts to work in a manufacturing environment This course will discuss the basic principles of: Lean Value The technical value stream Flow Pull, and Perfection Compare and contrast lean with the Theory of Constraints and Quick Response Manufacturing

Background and Purpose Value is a key attribute of the technical professional is his/her emphasis on and interest in professional values and goals rather than those of an organization. Lean thinking principles are emerging as a method to improve the flexibility, reliability, and profitability of enterprises worldwide. Lean thinking is being used to reduce setup times, lot sizes, and inventories. Lean is all about removing waste in the enterprise. In time as well as cost. As enterprises have reduced costs and improved quality, the primary competitive measure is the ability to respond to the customer

Required Textbooks Lean Thinking : Banish Waste and Create Wealth in Your Corporation Womack, James P. and Jones, Daniel T. (2003) New York: Simon & Schuster ISBN: Learning to See Version 1.3 Rother, Mike Shook, John Womack, James and Jones, Dan. (1999) Lean Enterprises Inst Inc. ISBN: Cellular Manufacturing: One-Piece Flow for Workteams (Shopfloor Series). Productivity Press; 1st edition (1999) Productivity Development Team ISBN: X

Textbook 1 Lean Thinking : Banish Waste and Create Wealth in Your Corporation Hardcover List Price: $30.00 ISBN:

Textbook 2 Learning to See Version 1.3 Spiral-bound paperback List Price: $50.00 ISBN:

Textbook 3 Cellular Manufacturing: One-Piece Flow for Workteams (Shopfloor Series) Paperback List Price: $25.00 ISBN: X

My Contact Info David Shternberg Address (use all three) CSUN - Home – Phone Numbers Cell Office Hours 6:00-7:00PM Thursdays JD 3310 By Appointment Only

My Work Experience Israeli Air Force F-16 Mechanic F-16 Mechanical Systems Instructor Israeli Aircraft Industries Ground test inspector CRANE Hydro-Aire, Burbank CA Mfg Engineer, Producibility Mgr, Lean & Cont Improvement Mgr Eaton Aerospace, Los Angeles Jan July 2005 Manufacturing Manager Mfg Eng & Fabrication Focus Factory Manager Manufacturing and Sustaining Engineering Manager Maintco Corporation, Burbank, Aug-2005 – July 2006 General Manager Eaton Aerospace, Los Angeles July-2006 – Jan 2011 Manufacturing Engineering Manager Supply Chain Manager OpEx Manager Meggitt Control Systems, N. Hollywood Jan 2011 – Present Director of Operational Excellence

My Academic Records Holtz Academy of Aviation Technology, Tel-Aviv, Israel Certified Aircraft Technician Associate Engineer Santa Monica College AA Degree California State University, Northridge BS Mfg Systems Engineering California State University, Northridge MS Mfg Systems Engineering & Management Part-time MSEM faculty member since Jan 2004

Class Material Website URL MSE507 Course Page Login: shternberg Password: mse507 Class Syllabus PowerPoint Presentations Schedule of classes My and phone numbers

Reading Assignments Essential for interaction and understanding Read assigned chapter prior to class Prepare to discuss issues/questions Preparation will make the course more interesting Pop-quiz may be given

Course Performance Evaluation Structure 25 %Mid-Term 25 %Final Exam 35 % Team Research Project 5 %Attendance and professionalism 10 %Participation and active learning (based in part on Partnership Peer Review Reports) Letter-Grade Scale Plus/Minus will be used ScoreGradeScoreGrade A70-74C 88-89A-68-69C B+60-67D 80-84B58-59D B-0-57F 75-77C+

Student Roles & Responsibilities Attend class sessions and to be prompt Be a team player Submit original work only I was a student too… Be considerate and respectful of one another Get the job done right and on time Budgeting 5-6 hours per week for this course, in addition to class attendance, is not unreasonable

Course Overview

Muda Muda means “waste” Any human activity which absorbs resources but creates no value Mistakes which require rectification Production of items no one wants so inventories and remaindered goods pile up Processing steps which aren’t actually needed Movement of employees and transport of goods from one place to another without any purpose Groups of people in a downstream activity standing around waiting because an upstream activity has not delivered on time Goods and services which don’t meet the needs of the customer

Lean Thinking Powerful antidote to muda Provides a way to specify value Line up value-creating actions in the best sequence Conduct these activities without interruption whenever someone requests them Perform them more and more effectively Lean thinking is lean because it provides a way to do more and more with less and less Less human effort Less equipment Less time Less space Coming closer and closer to providing customers with exactly what they want

Lean Thinking Make work more satisfying by providing immediate feedback on efforts to convert muda into value Create new work rather than simply destroying jobs in the name of efficiency Lean thinking steps: 1.Precisely specify value 2.Fully map the value stream for a specific product, and eliminate wasteful steps 3.Make the remaining, value-creating steps flow continuously Require complete rearrangement of your mental furniture… 4.Let the customer Pull the product from you as needed 5.Continuously improve to reach perfection

Step 1 - Specify Value The critical starting point for lean thinking Value can only be defined by the ultimate customer Only meaningful when expressed in terms of a specific product (a good or a service, and often both) which meets the customer’s needs at a specific price at a specific time. Value is created by the producer From the customer’s standpoint, this is why the producers exist Lean thinking must start with an attempt to precisely define value in terms of specific products with specific capabilities offered at specific prices through a dialog with specific customers Providing the wrong good or service the right way is muda

Step 2 - Identify the Value Stream The value stream is the set of all specific actions required to bring a specific product (goods, services, or both) Through the three critical management tasks of any business: Problem solving task – from concept through detailed design and engineering to production launch Information management task – from order taking through detailed scheduling to delivery Physical transformation task – from raw materials to a finished product in the hands of the customer Identifying the entire value stream for each product (or product family) is the next step in lean thinking

Step 2 - Identify the Value Stream (cont.) Value stream analysis will almost always show the three types of actions are occurring along the value stream: 1.Unambiguously create value 2.Create no value but necessary with current technologies and assets (type One muda) 3.Create no value and could be removed (type Two muda) Lean enterprise – a continuing conference of all concerned parties to create a channel for the entire value stream, removing all the muda

Flow Make the remaining, value-creating steps of the process flow Redefine the work of functions, departments, and firms Create single piece flow instead of batch processing Ensure positive contribution to value creation Speak to the real needs of employees at every point along the stream so it is actually in their interest to make value flow

Pull Let the customer pull the product from you as needed rather than pushing products, often unwanted, onto the customer The demands of the customer become more stable when they know then can get what they want right away Pull system is more responsive to changes then push systems

Perfection There is no end to the process of reducing effort, time, space, cost, and mistakes while offering a product which is ever more nearly what the customer wants

SPECIFY VALUE IDENTIFY THE VALUE STREAM FLOW CONVERT PUSH TO PULL Lean Manufacturing Cycle Step 5 – CONTINUOUSLY IMPROVE Getting value to flow faster always exposes hidden muda in the value stream. The harder you pull, the more the impediments to flow are revealed so they can be removed.

Homework Assignment Lean Thinking Chapter 1 Value Pages Question: 1. What do customers consider as value? Give examples 2. Explain why we need to define what value is before we start any performance improvement.

Questions? Comments?