28 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
14 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Rods Schedule and Issues J. Incandela University of California Santa Barbara for the TOB Rod Group Tracker Integration Meeting October 27, 2005 Slides.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
The Great I2C Mystery Act 2. The facts Occasionally, when accessing sequentially components on the I2C bus (LLD, DCU etc.), the APVs are found not to.
24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Comprehensive Review June 28,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the illustrious TOB Group Tracker General Meeting October 26,
Juan Valls 1 TOB System Test Status Report  DS ROD System Test Setup  DAQ Software  DS ROD Characterization PLL, FED Timing Scans OPTO Scans  Noise.
The Great I2C Mystery Act 2. The facts Occasionally, when accessing sequentially components on the I2C bus (LLD, DCU etc.), the APVs are found not to.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
The Great I2C Mystery. The mystery Occasionally, when accessing the I2C bus, the APVs are found not to respond correctly to I2C commands, actually they.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Annual Review June 15, 2004.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
I2C Signal propagation on TOB cards Where do we stand A. Marchioro 13/7/2003 v.2.
6/23/2005 Claudio Campagnari, weekly US rod meeting 1 New Development: Tentative Plan for Rod Production As relayed to me by Joe, following the discussion.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
M&O Review, FNAL, July 22, 2005 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker I&C and M&O planning Joe Incandela University of California.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the illustrious and colorful TOB Group Tracker General Meeting.
1 Status on Rod Production and Single Rod Tests at FNAL Ryan J. Hooper.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
André Augustinus 9 October 2006 Interlocks update.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
17 May 2005Jim Lamb (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
SCHEDULE Nov 1st - Assembly Table Complete
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Hybrid & Module Testing Status
Update of US Testing Status
Unexpected Failures of Modules on Rods
On behalf of the US TOB testing group
First Assembled Rod in US
Operations/Failure Analysis
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
US Module Testing Progress Report
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Operations/Failure Analysis
Operations/Failure Analysis
TOB Module Production Overview and Plan
Module Failures on Rods
US Module Testing Progress Report
Operations/Failure Analysis
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
The Design Process.
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

28 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth Kalavase Jim Lamb assembly testing

28 June 2005C. Campagnari (UCSB)2 Recall presentation from Marchioro ~ 2 weeks ago had 6 options to fix the I 2 C problem They now have come up with a 7 th option New Development: Tentative Plan for Rod Production

28 June 2005C. Campagnari (UCSB)3 Option 7 (from Marchioro's slides) AOH FE-Hybrid SCL SDA 100 pF Parasitic on AOH C A PSU Control PSU FE ICC Line driver 10   pF  pF 330  LLD DCU/APV

28 June 2005C. Campagnari (UCSB)4 Option 7 (cont.) Introduction of line driver (buffer), presumably powered from front end, decouples the front end from the CCU Prevents problems at power up It also gives more margin w.r.t. jumper solution –Like R=0  solution –But preserves power on sequence

28 June 2005C. Campagnari (UCSB)5 Main drawback of Option 7 Need to re-design and re-fabricate all ICC cards –In case you forgot: these are cards on the rods –Interconnects between buss, optohybrids, front- end hybrids There is a 1 st order plan

28 June 2005C. Campagnari (UCSB)6 Schedule (from Marchioro's slides)

28 June 2005C. Campagnari (UCSB)7 Tentative Plan 1.Each of FNAL and UCSB will build ~ 30 rods now with jumpers, ship to CERN To be used for integration practice We will add the jumpers in US Manpower question 2.If everything goes well, will build more rods like this to complete L6, then stop L6 is ~ 150 rods Who does the modifications? Joe (and I) suggests CERN. Means that we ship empty rod frames back

28 June 2005C. Campagnari (UCSB)8 Tentative Plan (cont.) 3.In the meantime, prototype solution 7 ICC boards are fabricated 4.If OK, then fabricate more, and equip all rods Rod production would then re-start in Septmeber or October 5.L6 rods would then be pulled and retrofitted to Although there will be pressure to keep as-is Question of re-test of retrofitted L6 rods

28 June 2005C. Campagnari (UCSB)9 Request from Duccio List of rods to populate first TOB cooling segment List of rods to populate cosmic rack SS4 rods at UCSB only, DS not in US Where / what to ship?

28 June 2005C. Campagnari (UCSB)10 Other questions/issues What about header errors? –Building more rods and shipping them to CERN will give more statistics and allow them to study these in more detail –Personal opinion: we know that header errors are there. We should push the CERN group to take them What about I 2 C errors 64 & 68 at FNAL –Same as above –Although, still do not understand (AFAIK) why UCSB does not see them

28 June 2005C. Campagnari (UCSB)11 Other questions/issues (part 2) My opinion: Before restart of production need a well defined testing protocol for digital problems –To be defined by experts (CERN) –I think we have many of the pieces, but it should be looked at again Storage of modules Bookkeeping –We have modified rods and unmodified rods With several flavors of modifications – We will ship rods with jumpers, and later rods with "solution 7" ICC cards –We still have (I think) rods that have not been "cleaned" and/or rods with switched thermistor lines  need to take stock of where we are in the two labs  need to see if existing database can be of help if not, use ad-hoc methods (stickers, etc)

28 June 2005C. Campagnari (UCSB)12 UCSB status Inventory of modifications exists Have 6 "solution 6" rods ready to go Four have already gone through SRT Tomorrow we'll start MRT burn-in –It will be an extra-long burn in, probably run standard scenario two or three times