The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS30 +22 BIS36 ) chambers ALL since Sept 04 University of Athens (UoA)

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Homogeneity of Small Chambers T4, T6, T7, T8 and Gas Gain Measurements of Frascati and Roma Chambers Emmanuel Angulo (CSU Fresno) Weekly Meeting ATLAS.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS BIS36 ) chambers University of Athens (UoA) Tube wiring/assembly (30,000.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanidis V. Birioukov (engineer from Protvino) UNIVERSITY.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
14/11/03 CERN-ilo presentationC.Kourkoumelis,UoA1 ATLAS Muon Drift Tube wiring and testing in Greece Joint effort UoA+NTUA* Athens,14/11/03 Christine KOURKOUMELIS.
1-4 April 2004HEP 2004 D.Fassouliotis, UoA ATLAS Muon Chambers Construction in Greece Dimitris Fassouliotis Conference on RECENT ADVANCES IN PARTICLE AND.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
UoA, NTUA, AUThATLAS Overview week 1-7 Oct 2004 BIS Integration and Commissioning Status All 112 bare BIS chambers are at CERN All but 5 are equipped with.
ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou S. Igropoulos C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanides V. Birioukov (engineer from.
University of Athens ATLAS BIS MDT assembly HEP 2001 Presented by Heraklion, 6-8 April 2001 D. Fassouliotis D. Fassouliotis.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
An Integrated Single Electron Readout System for the TESLA TPC Ton Boerkamp Alessandro Fornaini Wim Gotink Harry van der Graaf Dimitri John Joop Rovekamp.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Micromegas for SLHC A project to investigate the use and determine the working parameters of Micromegas for SLHC tracking – in conjunction with the ATLAS.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
ELENA installation progress F. Butin / ELENA collaboration.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
TOTEM Electronics Status
Renovation of the 45-year old PS magnets
Overview of the Frascati Production Facilities
10/month is the present production rate 2 FTE + sporadic contributions
CMS RPC Endcap RE1 Status Report
Pierluigi Paolucci - I.N.F.N. Naples
Assembled by the Rubicon Forest Protection Group
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
Teleconference ACS – FREIA 19th June 2017
Plans for the 2004 CSC Beam Test
Presentation transcript:

The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS BIS36 ) chambers ALL since Sept 04 University of Athens (UoA) Tube wiring/assembly (30,000 tubes finished Dec.2003) National Technical University of Athens(NTUA) Quality Assurance/Quality Control of tubes (30,000 tubes finished Mar.2004) University of Thessaloniki (AUTh ) C hamber assembly (112 chambers finished April 2004)

The Greek ATLAS Muon Collaborating institutes UoA C. Kourkoumelis P. Ioannou D. Fassouliotis I. Hatziantonaki K. Nikolopoulos D. Pappas NTUA M. Dris A. Filippas E. Gazis T. Alexopoulos E. Katsoufis T. Papadopoulou E. Fokitis Y. Tsipolitis S. Maltezos A. Tzamarioudaki P. Savva AUTh Ch. Petridou T. Liolios M. Manolopoulou S. Dedousis M. Chardalas D. Sampsonidis T. Lagouri K. Ypsilantis A. Krepouri C. Lamboudis K. Economou K. Filippousis

…providing the services the procedure  Preparation activities home Preparation activities home ( gas bars, cables +29 chambers at Thessaloniki) FINISHED summer 2004  Stage 1 (Blg 184 : equip with gas bars, FC’s, HH’s+ MECCA test Stage 1 (Blg 184 : equip with gas bars, FC’s, HH’s+ MECCA test 78 chambers at CERN, test for gas leak OK) STARTED March FINISHED Sept 2004 (but 7 chambers)  Stage 2 NOW HALF_FINISHED Stage 2 NOW HALF_FINISHED  Electronic Noise test NOW Electronic Noise test NOW  Cosmic Ray test NOW Cosmic Ray test NOW  Database NOW Database NOW

Blg 283 (ALL 112 CHAMBERS) Test facilities shared with BIL team

Stage 2 (Bldg:283 started Oct 2004 after gas leak test) Equip chambers with:  gas supply brass tubes, plugs, valves etc gas supply brass tubes, plugs, valves etc  Mezzanines boards +FC covers Mezzanines boards +FC covers  alignment platforms + cables + measure them alignment platforms + cables + measure them  HV and readout cables (stiff cables/support!!) HV and readout cables (stiff cables/support!!)  B field platforms +cables B field platforms +cables  T sensor cables T sensor cables  Protective covers Protective covers A team of 2 technicians working on them since Oct Since Dec. 3 technicians + ½ physicist (since Jan.) FINISHED 56 CHAMBERS RATE IS : 4 min to 5 max chambers/week Expect to finish by Easter (Greek)

…providing the services Stage II-Blg 283 (ALL CHAMBERS) Noise test/ Cosmic Ray Test (10 chambers before Xmas+restarted last week) Data base A team of 1 physicist –S.Vlachos (since Jan.) +½ physicist (Ph.D.student) (from March) Leak test/certification

CONCLUSIONS … providing the services+commissioning the chambers Stage I- Blg 184 Finished 6 months ago (but 7 chambers are still bare) Stage II-Blg 283 (ALL CHAMBERS) Half are fully equipped, rest by May Integration has just restarted MAIN EFFORT NOW Expect to finish by July