1 1 Presented : Pre-Bid Conference March 25, 2015 IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS.

Slides:



Advertisements
Similar presentations
Zonal & Station Identification Systems
Advertisements

Effective Generator Testing & NFPA o Highlight key elements of NFPA 110 as it relates to generator testing o Describe diesel engine fundamentals.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Scissor Lift Safety Training
SCAFFOLD SAFETY.
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
GA Tech Safety and Health Consultation Program FALL PROTECTION.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Electronics II Lab. Two Weeks. power connections Solderless Prototyping Board jacks for power connections.
Inspection and Testing of Fire Alarm Systems (ITFAS)
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
3200A Electrical Test Equipment Calibrator. Automatic Loop Correction To simplify calibration of loop testers, the 3200A can be fitted with the Auto.
Georgia Tech Safety and Health Consultation Program ELECTRICAL SAFETY TOOL BOX SESSION.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Course Overview Course Requirements Knowledge and Skills Student Expectations.
Mechatronics: An On-Boarding Corporate Training Example Jay Bouis Coordinator of Technical Training The Community College of Baltimore County Penny Jung.
School Technology Solutions, LLC Technology Audits What's in it for you? 4 th Annual SW/WC Technology Conference March 11, 2010 Presenter: Lee Whitcraft.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Source Selection. What is Source Selection? Source Selection is the process of conducting competitive negotiations. Source Selection allows the Government.
WEE District Plans Writing, Updating and CDE Approval Updated 10/2009.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
From Research Prototype to Production
PRESENTS.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008 Date: 24 March 2014 Time: 11:00.
1 W. Owen – ISECON 2003 – San Diego Designing Labs for Network Courses William Owen Michael Black School of Computer & Information Sciences University.
Advanced CIS NAME: ___________________. OBJECTIVE: Maintaining, Managing, and Troubleshooting Systems Maintenance includes following established procedures.
Unit 1006 Maintain and use carpentry and joinery power tools © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 1 Know how to.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
APM Automation Solutions Ltd. Good Installation Practice Guidelines Eran Perlstein, Customer Support Director.
QUALITY MANAGEMENT STATEMENT
1 Access to the World and Its Languages LRC Technical Assistance Workshop (Part 1) Access to the World and Its Languages I N T E R.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Elementary School Administration and Management GADS 671 Section 55 and 56.
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
NPQ Instructor II. Introduction  The NPQ Instructor II program is designed for individuals that are interested in the Fire and Emergency Services Training.
P ART 46/48 T RAINING P LAN A PPROVAL. Federal Mine Safety & Health Act of 1977 SEC (a) Each operator of a coal or other mine shall have a health.
ICT POLICY Donna Varney Autumn 2005 Adapted from the Becta requirements.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Cryogenic Plant Electrical and Controls
World Health Organization
CO6001 Managing a Computer Based Environment
NSTM 074 VOL 3 (SERIES) FAMILIARIZATION
Radiopharmaceutical Production
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
PRC Implementation Plan and Summary of Devices
SR1 cleanroom extension
AMT Toolkit for MCM Sales
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008
Washington Metropolitan Area Transit Authority (WMATA)
Emergency Lighting Design, Inspection and Maintenance Requirements
Washington Metropolitan Area Transit Authority (WMATA)
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Series 5300 Lithium Cell Formation System
Specifications What should it cover Goods Services Warranty
Presentation transcript:

1 1 Presented : Pre-Bid Conference March 25, 2015 IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS

PROJECT OVERVIEW Supply, install, interconnect, program, calibrate, synchronize and test  - Two (2) set of 8 ea., 20 metric tons capacity mobile lifting jacks  - A control panel in each of the 2 sets, to synchronize the operation of the eight (8) jacks  - One (1) set of 4 ea., 20 metric tons capacity mobile lifting jacks that can be used as spare jacks (excluding the control panel) 2 IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS

3 Lifting capacity per jack:20 tons Lifting capacity per set of four jacks:80 tons Lowest position of cantilever (claw) above upper edge of rail (floor): 400 mm Highest position of cantilever (claw) above upper edge of rail (floor): not less than 1950mm Vertical Stroke:not less than 1565mm Lifting/lowering speed:12 to16 inch per minute Operating Voltage:480 V Protection of electrical equipment:IP 54 or higher Synchronized precision for set4 mm or.16 in Noise Level< 70 db (A) Documentation:Two fold each: GA drawing, Spare Parts List, Wiring Diagram, Lubrication Plan, Operation and Maintenance manual. Refer to Deliverables section. Coating:Blast cleaning according to SIS Standard, SA grade 2-1/2. Color: Yellow, RAL 1007 Regulations:EN 1493, ISO Standard, DIN Standard, IEC Regulations, VDE Regulations, and OSHA Lifts shall meet the following requirements : IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS

4 EquipmentAmount Mobile lifting jacks (Portable Jacks)16 Spares mobile lifting jacks (Portable Jacks)4 Control panels to synchronize the operation of eight (8) jacks 2 Electrical requirementsContractor to provide electrical cable and plugs type HBL460P7W necessary to operate all the Jacks. Reference Attachment A for electrical infrastructure existing in the Facility. IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS

5 Deliverables OPERATION MANUALS AND MAINTENANCE MANUALS - (5) hard copies (inserted in binders) and one (1) electronic copy (pdf format) on the day of the delivery of the portable jacks. Two (2) of the Manuals shall have laminated or similarly protected pages throughout. Shall include, but not limited to; 1. Equipment function, normal operating characteristics, limiting operations. 2. Demonstrate assembly, disassembly, and installation instructions of all equipment. Technical manuals shall include testing, troubleshooting charts with corrective action and scheduled maintenance instructions. 3. Operating instructions for start-up, routine and normal operation, regulation and control, shutdown, and emergency conditions. 4. Incorporate the equipment’s lubrication and maintenance instructions. 5. Parts list and predicted life of parts subject to wear. IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS

6 6. Outline, cross-section, and assembly drawings; engineering data; and electrical diagrams, including elementary diagrams, wiring diagrams, connection diagrams, word description of wiring diagrams and interconnection diagrams. 7. Test data and performance curves. 8. List of recommended spare parts with a price list and a list of spare parts provided under these specifications. 9. Copies of installation instructions, parts lists or other documents packed with equipment when delivered. 10. Product Technical Specifications. Shall include, but not limited to (cont.); IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS

7   Performance and Acceptance Criteria  On-site training class in the operation of the jacks within a week after the delivery to the Yard. Training shall include two sessions for two different shifts of a minimum duration of one day (7.5 hours) per each session (maximum of 16 students per session). Provide presentation and materials (laptop computer, projector, etc.) to educate, train, and teach personnel enabling the staff to operate, service, and maintain the equipment satisfactorily. Training shall include on-site instructions, supplying twenty (20) handouts per session manuals, classroom aids, and all other items required to satisfactorily train personnel. Practical training on equipment shall occupy a significant portion of all training classes. At WMATA’s request, Training must also include a demonstration of the operation of the jacks by means of lifting a two (2) married pair train. IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS

8