CONSTRUCTION FOR TETRAPOD PRESENTATION

Slides:



Advertisements
Similar presentations
Trainers Notes This package provides an overview of the major issues likely to impact on Group Training Organisations with the Introduction of the new.
Advertisements

Evaluating Construction Methods for an Electrical Transition Compound Christopher OConnor Andrew Canniff.
Installation of new drainage systems and reshaping of “splitter” island Rushden Redevelopment 2014.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Construction Laborer Carpenters Helper Rough Carpenter Construction Carpenter Cabinetmaker/Bench Carpenter.
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Hargrave Street Pumpstation – Site Preparation July 2014.
Building acoustics Sealing technologies Reinforcement technologies Formwork technologies Spacers Zemdrain®
The ice machines are available at various capacities and can be placed where needed in the site. Capacities range from 3 to 70 tons per day. The ice is.
Numbers
Optimizing “Big Box” Construction Lauren Hughes Josh Hogan Kevin Hanson Joseph Garrott Rose-Hulman Institute of Technology.
Concrete Construction
CDM 2015 Are we there yet? Michael Anderson Anderson Bradshaw Limited.
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
Eco-$mart, Inc Pre-panelized, steel reinforced, super insulated, poured concrete wall system.
Why DURA-CRETE? DRIVEWAYS BY: YOUR NAME HERE. Agenda/Topics  DURA-CRETE Program History  DURA-CRETE The “Mix”  Installer’s Certification Process 
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY AGNICO-EAGLE MINES CHESTERFIELD INLET MEADOWBANK SHIPPING PROGRAM 2007.
Mobile Solutions in Construction industry! “Technology has no value unless it brings added value to the process” Marcus Wiksten Project Manager Solutions.
FORMWORK COST AND CONSIDERATIONS We are reviewing Chapt. 1&2 and we assigned Chapt. 3 & 4 for reading assignment!!! Chapter One- Introduction to Forming.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
A construction worker is a tradesman, laborer, or professional employed in the construction of the built environment and its infrastructure. A construction.
12.5 Volume of Pyramids and Cones
NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.
Do Now: Compare a Want vs. a Need
G’Day! Stefan Hörnlund University of South Australia
When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house.
Concrete Countertops. Cast in place Pre – Cast Overlay.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Name of the course :Building construction Course code :HED 228 Credit hours :3hours Prepared by Eng. Nadir Abd alrazig siddig.
Considering Workplace Exposure Initial findings from the Construction CIP.
Week 6 Timber based columns
1 AASHTO 2011 Annual Meeting Joe Cappel, Director of Cargo Development October 13, 2011 Maritime Transportation- State, Regional, National and Regional.
Introduction to Concrete Design and Control of Concrete Mixtures – Chapter 1.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
Installing a Backflow Cage. Verify the Backflow and Area.
Port Pepard Docks New dock for car exports Review of car movements 1.
New dock for car exports Review of car movements.
Fall from Ladder while Climbing to the Mobile Scaffold (Serious Accidents in Construction) Construction The copyright to this material belongs.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
“ TOWARDS A GREEN REVOLUTION IN BUILDING CONSTRUCTION ”
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Simplex Method for BLENDING OF AGGREGATES The contract specifications of a building project require that the course aggregate grading for concrete mixing.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Temporary Works – P8 Project Practice.
Shyamaghat Rainwater Model Project
Environmental Assessment
BUILDING ECONOMICS.
Common Structural Forms
Gang Form Fall During Installation
The Use of Polystyrene as Substitute of Sand in Pontoon Concrete
Asphalt Drum Mixing Plant Asphalt drum mix plantAsphalt drum mix plant is one of the road construction machinery.This plant is well suited for the homogenous.
MONTHLY STATUS REPORT– May 2013
Yahoo Mail Customer Support Number
TECHjOSH.COM TechJosh.com.
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
CONCRETE FORMWORK Formwork.
Concrete Structures DR. Nabil Dmaidi.
Fabric form concrete and paraweb system
THANK YOU!.
Thank you.
Thank you.
Delft University of Technology

Construction site plan
Table 3. The needed requirements of the Concrete Sustainability
Presentation transcript:

CONSTRUCTION FOR TETRAPOD PRESENTATION LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT CONSTRUCTION FOR TETRAPOD PRESENTATION Subcontractor: Phuc Hung

Construction sequence for construction tetrapod block LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT Construction sequence for construction tetrapod block Site preparation Operate & transport Tetrapod’s formwork to the site Installation formwork Installation scaffolding Casting conscrete Dismantling scaffoiding, formwork Curing, transport to Tetrapod’s storage yard & go to the other blocks

Construction for auxiliaries building & Casting Tetrapod’s yard LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 1. Site preparation Construction for auxiliaries building & Casting Tetrapod’s yard

2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE Tetrapod’s Formwork

2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE Installation for concrete mixed plant

2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE Installation for concrete mixed plant

3. INSTALLATION FORMWORK LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 3. INSTALLATION FORMWORK Installation for Tetrapod’sformwork

3. INSTALLATION FORMWORK LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 3. INSTALLATION FORMWORK Installation for Tetrapod’sformwork

3. INSTALLATION FORMWORK LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 3. INSTALLATION FORMWORK Installation for Tetrapod’sformwork & scaffolding

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 4. casting concrete Casting concrete

5. DISMANTLING SCAFFOIDING, FORMWORK LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 5. DISMANTLING SCAFFOIDING, FORMWORK Dismantling scaffoiding, formwork

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 6. CURING concrete Curing concrete

7. TRANSPORT TO TETRAPOD’S STORAGE YARD LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT 7. TRANSPORT TO TETRAPOD’S STORAGE YARD Transport to tetrapod’s storage yard

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT as above, all the images were collected by our engineers when they were carying out for casting tetrapod block in da nang port improvement project. THANK YOU SO MUCH !!!