“ MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA ”

Slides:



Advertisements
Similar presentations
The Trouble of Water Floods in Changjiang Basin - Causes - Effects - Solutions Droughts in Huanghe Basin - Causes - Effects - SolutionsSolutions.
Advertisements

The Caserones Project October 2014 Mr. Héctor Sepúlveda O.
I Situation of water supply and sewerage in Beijing 1. General situation of water supply business Beijing, the driest city in the world: Lack of water.
E LECTRICIDAD A NDINA Carbon Finance Risk Management Workshop Peruvian small hydros 19 th November 2003 Project Presentation Peru Hydros Strictly Private.
Kwale County Investment Forum
Flooding Creek What Value as Riparian Habitat ??.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
1 Reform of Electricity Industry & Construction of Electricity Market In China Northeast East South Centre Northwest North Sitsang Taiwan Zhang Diansheng.
PROJECT PORTFOLIO. PROJECTS IN TRANSPORT INFRASTRUCTURE.
Loudoun Water’s Potomac Water Supply Program RWI/PRWPS- Request for Qualifications Pre-submittal Conference– July 9, 2013.
Lima - Perú. Huanuco Pucallpa Tingo María 3 Huancayo 2 Dv Cerro de Pasco La Oroya Pte Ricardo Palma Ramiro Prialé 1  Section 1:Ramiro Prialé - Bridge.
Improvement of the Capacity of Drinking Water Treatment Plant in East Quantara (Case Study) Dr. Eng. Ibrahim Khaled El-Sayed Chairman 1North & South Sinai.
About Water Purification Station Changgen Yang. Main water purification station. It is too high in this plot, we would like to change to ~4m. It is located.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
CUBA national experience Synergies and cooperation with other conventions 2003.
Globalisation, Climate Change and Urban Governance Oxford Brookes 9-11 March 2011 Pedro Roberto Jacobi Program in Environmental Science,
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
CE HYDRAULICS ENGINEERING
The Southern California Water Dialogue Bruce Moore, Division Manager Southern Nevada Water Authority April 27, 2011.
Water is supplied to Kağıthane Drinking Water Treatment Plants established on the back of Kağıthane district being one of the historical regions of.
‘The world’s greatest plumbing system’ An example of how a river is managed to use its water as a resource.
1 Ministry of External Relations Department of Trade and Investment Promotion Investments Division Investment Opportunities Brazil-China.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Water System Planning Study
Interlocal Cooperation for a Sustainable and Secure Water Supply Don Greeley Regional Managers Meeting April 8 th, 2014.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Ruataniwha Water Scheme HB Today Public Meeting 6 August 2015 HBRIC is a subsidiary (CCO) of Hawke’s Bay Regional Council H AWKE’S B AY R EGIONAL I NVESTMENT.
AIU Day 4. Water, Water, Everywhere!! Water Treatment in SW Pennsylvania.
1 March 18, Bridging the 4 th and the 5 th World Water Forum (Great actions for big challenges) Bridging the 4 th and the 5 th World Water Forum.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Northern Integrated Supply Project NSPE-Colorado State Meeting February 2010.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
Grand Canalscape Phase I and II General Update October 30, 2015.
1 Institute of Energy & Gia Lam Joint Stock Company Development of Krong Pa 2 and implementation issues Dissemination and Training workshop Hanoi December.
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
Surface Water Plants Hueco Wells Mesilla Wells. Drilling Fresh Water Wells; Both Bolsons.
KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
BUILDING STRONG ® PORTLAND DISTRICT 1 The Dalles Dam Emergancy AWS Backup Water Supply P&S FFDRWG Meeting, 4 Feb Pat Duyck Project Manager.
Submitted in partial fulfillment for the Award of degree of Bachelor of Technology In Electrical Engineering Submitted By: Submitted To : Department.
Is composed by 54 artificial lakes 32 dams which provide Mmc of storage capacity 850 km of aqueducts 210 km conveyance canals 47 pumping plants 4.
Present and Future Water Supplies to Meet El Paso Demands Presentation to NM-TX Water Commission August 20, 2004 by Michael Fahy El Paso Water Utilities.
Update on RCR Permitting
Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
Investment opportunities in public infrastructure
Investment Opportunities in Public infrastructure and Public Service Infrastructure – ProInversion Updated to September 2.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
Erdeneburen HPP Project Implementation Unit
Investment opportunities in infrastructure and energy Korea and the Pacific Alliance.
MINISTRY OF ENVIRONMENT, WATER AND NATURAL RESOURCES STATE DEPARTMENT FOR WATER ENG. K. Kyengo KENYA-SPAIN MULTI-LATERAL PARTNERSHIP MEETING 10th.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
ENDLESS INVESTMENT OPPORTUNITIES IN PUBLIC INFRASTRUCTURE AND SERVICES March 7,2014.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
Paper Presented by At the Zambezi River Basin Stakeholder Conference : 22 – 23 Nov Windhoek, Namibia Eng. S. Z. Mhlanga Senior Manager (Projects.
Overview of Desalination Trends and Jaffna Project
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
Richland Creek Water Supply Program Briefing
(State Initiatives and Unsolicited proposals projects)
Water Resource Management Planning Update
Kings Bluff Raw Water System Parallel Raw Water Main Project
Presentation on Ken – Betwa Link Project-Phase-II
Class III Estimate for Regional Consolidation
Water Resource Management Planning Update
Delta Water Supply Project
Kvesheti – Kobi Tunnel Section
Water & Environmental Affairs
Kvesheti – Kobi Tunnel Section
White Flint North Entrance Feasibility Study
Presentation transcript:

“ MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA ”

Main objective: Lima Metropolitan Area: To increase the availability of drinking water to meet the demand of the population of Lima Location: -Province of Yauli, Department of Junín -Provinces of Huarochirí and Lima, Department of Lima Concession term: 30 years Modality: DFBOT/Self-sustained Type of concession: Integral Project Bid Estimated investment: US$ 600 million Project Overview Location map

The Project comprises: 1. Design, financing, construction, operation and maintenance of new works: a)Pomacocha and Huallacocha Bajo Dams (36.1 MMC to 90 MMC) b)Left Bank Canal (Rumichaca Catchments, 6 Km) c)Right Bank Canal (Chumpe and Chushuro Grande Catchments 6 Km) d)Trans-Andean tunnel (10 m and 3.5 m in diameter) e)Huachipa II Treatment Plant Phase 1 (2.5 m3/s) f)South Branch (40.7 km with diameters between 2000 mm and 600 mm and 3 tunnels) g)South Branch reservoirs (7 units per 49,000 m3) h)Interconnection lines (91 km with diameters between 1200 mm and 300 mm) i)Huachipa II Treatment Plant Phase 2 (2.5 m3 / s) j)Complementary reservoirs (2 units per m3) 2. Operation and maintenance of existing works: a)Huachipa Intake (12 m 3 /s) b)Drinking Water Treatment Plant Huachipa I (5 m3 / s) c)North Branch (27.1 km with diameters between 2000 mm and 600 mm) d)North Branch Reservoir (4 units per 23,000 m3) Scope of the project COMP 1 COMP 2 COMP 3 COMP 4

Rímac river Pomacocha Reservoir Río Blanco river reservoirs (future) South branch (future) PTA Huachipa 1st stage (existing) PTA Huachipa 2nd stage (future) Lima Huarochirí Yauli Huallacocha Bajo Reservoir Trans-Andean tunnel (future) North branch (existing) Left Bank Canal Right Bank Canal General framework of the Project

Obras de Cabecera y Conducción Componentes: Represas, Canales y túnel de derivación Damming and Transfer WESTERN MOUNTAIN RANGE 10 KM TRANS - ANDEAN TUNNEL LEFT BANK CANAL POMACOCHA DAM ELEVATION HUALLACOCHA BAJO DAM ELEVATION OR CONDITIONING EXIT GATEWAY 00 RIGHT BANK CANAL Río Yauli Río Blanco Pomacocha Dam (Today) 24.4 MMC at 4262 masl Huallacocha Dam (Today) 11.7 MMC at 4345 masl 90 MMC COMP 1

Huachipa intake (existing) Río Rímac Raw water pipeline (existing) Huachipa I (5 m3/s) (existing) N Huachipa II (5 m3/s) (planned) Planeed reservoir Planned filters Flocullants- Decantanters pre- chlori nation,r pre- chlori nation,¿r Sand removers (existing) Huachipa Plant detail Existing reservoir Existing filters Floculants- Decanters pre- chlori nation, COMP 2 y 4 Planned reservoir

South Branch detail Huachipa plant Reservoir RRS-1 Ceres Tunnel 1 Ate – La Molina Tunnel 2 La Molina - Manchay Tunnel 3 Manchay - Villa María Reservoir RRS-2 La Planicie Reservoir RRS-3 Sol La Molina Reservoir RRS-4 Manchay Reservoir RRS-5 Atocongo Reservoir RRS-6 Villa María Reservoir RRS-7 Pachacamac COMP 2 Pipeline 40,7 km 7 reservoirs ( m3) Interconnection lines with existing or planned reservoirs (91 km)

TUPAC AMARU RESERVOIR 8000 m 3 END OF NORTH BRANCH PTAP Huachipa I and North Branch COMP 3 PTAP Huachipa I (5 m3/s) Pipeline 27,1 km 4 Reservoirs ( m3) TRAMO: SECTION TÚNEL: TUNNEL PLANTA DE TRATAMIENTO: TREATMENT PLANT COLLIQUE RESERVOIR 4000 m 3 CANTO GRANDE RESERVOIR 9000 m 3 JICAMARCA RESERVOIR m 3 MAIN RESERVOIR m 3

Concession schedule

Bid Schedule Schedule ActivityDate Fourth Draft ContractJul 2015 Deadline for Prequalification (Envelopes No. 1)Aug 2015 Final Version of the Concession AgreementAug 2015 Submission of Bids (Envelopes No. 2 and No. 3)Sep 2015 Bid awardSep 2015 Signing of the Concession ContractNov 2015

THANK YOU