Transition Plan for Removing Wind Phase 1 Generic Models

Slides:



Advertisements
Similar presentations
Generic Models for Type 3 and 4 Wind Turbine Generators
Advertisements

1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Stephanie Lu, MVWG Chair Seattle City Light
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
MVWG Report to TSS January 2013
MVWG Report to TSS August 2011
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Photos placed in horizontal position with even amount of white space between photos and header Sandia National Laboratories is a multi-program laboratory.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
Adding GE WTG Models to WECC Approved Dynamic Model Library
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Jun Wen, MVWG Chair Southern California Edison
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
Reliability Standards Update
MVWG Report to TSS May 2014 Stephanie Lu, MVWG Chair Seattle City Light.
WECC Renewable Energy Modeling Workshop Conducted by the WECC Renewable Energy Modeling Task Force (REMTF) and Modeling and Validation Work Group (MVWG)
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
MVWG Report to TSS February 2015 Stephanie Lu, MVWG Chair Seattle City Light.
June 1, 2009 Prepared by Consensus Systems Technologies (ConSysTec) SDP Maintenance RSTWG 1 st Semiannual Meeting.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Information Dissemination Strategy An Update Presenter: Bruce Locke.
RTWG Report to TAC August 5, 2010 Howard Daniels.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
Observations using cmpldw WECC MVWG Meeting June 2015 Eric Bakie.
MVWG Report to TSS August 2014 Stephanie Lu, MVWG Chair Seattle City Light.
SRWG Meeting 15-2 Power Plant Validation Tools Eric Bakie July 2015.
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Jun Wen, MVWG Chair Southern California Edison
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
MVWG Report to TSS May 2016 Jun Wen, MVWG Chair Southern California Edison.
Standard Design Process Overview
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
OFFICE OF FINANCIAL MANAGEMENT 0 Office of Financial Management Office of Financial Management TALS Draft Conceptual Solution February 24, 2004.
WECC REMTF Workshop Spencer Tacke WECC Renewable Energy System Models Workshop March 9, 2016.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Song Wang, MVWG Chair PacifiCorp
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Philip Augustin TSS Chair
TechStambha PMP Certification Training
NERC Update: Current Activities Ryan Quint, Ph.D., P.E.
Transition Plan for Removing Wind Phase 1 Generic Models
WECC REMTF Workshop Spencer Tacke
CMPLDWG Composite Model with Distributed Generation Approval
NERC-WECC Coordination
Andrew Christensen, SDWG Chair
NERC-WECC Coordination
Jonathan Young SDWG Chair
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
Andrew Christensen, SRWG Chair
CMPLDWG Composite Model with Distributed Generation Approval
MVWG Report to TSS January 2014
SRWG Chair Report March 2015 WECC HQ
Donald Davies Chief Senior Engineer
Transition Plan for Removing Wind Phase 1 Generic Models
Model Validation for Large Scale PV Plants
WECC REMTF Workshop Spencer Tacke
SRWG Meeting 15-2 Power Plant Validation Tools
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
WECC REMTF Workshop Spencer Tacke
PSS0 Configuration Management,
XRN Nov 19 Release - Status Update
Jonathan Young ColumbiaGrid
Presentation transcript:

Transition Plan for Removing Wind Phase 1 Generic Models WECC SRWG Meeting July 2014 Eric Bakie

Proposed WECC REMTF Renewable Energy Model Implementation Plan  Key stakeholder input (REMTF, IEEE, IEC) Model specifications approved by MVWG and TSS Prototype model implementation tested Model validation against plant-level field data (difficult and ongoing) Models implemented in release version of commercial software programs Model user guidelines Webinar on WECC/REMTF model development, deployment process Update Approved Dynamic Models List WECC workshop on RE modeling Model validation guidelines and tools (in process) WECC request for data submittal using new models, with grace period

Agenda Review Wind and Solar Records in Current WECC MDF Review MDF Parsing Spreadsheet Tool MDF Review Results Review Proposed Implementation Timeline for Phase 2 REMTF Wind and Solar Models Group Discussion

Wind and Solar Dynamic Model Records in WECC MDF genrou 132 Approved Models Model WECC MDF wt1g 15 wt1t wt1p Model WECC MDF wt2g 26 wt2e 22 wt2t wt2p Model WECC MDF wt3g 87 wt3e 82 wt3t 80 wt3p 74 Model WECC MDF wt4g 79 wt4e 76 wt4t 53 Wind 39 Solar 40 Un-Approved Models Model WECC MDF gewtg 133 exwtge 70 ewtgfc 30 wndtge 54 Wind 50 Solar 44 Model WECC MDF genwri 12 exwtg1 wndtrb 1 Model WECC MDF pv1g 2 pv1e Model WECC MDF motor1 54 Wind 40

Est. Total MDF Records for Transition to REMTF Phase 2 Wind / Solar Models Modeling Package WECC MDF WT1 15 WT2 26 WT3 87 WT4 79 GE WTG 133 GENWRI 12 PV1 2 MOTOR1 40 GENROU (????) 132 Est. TOTAL 526

motor1 Model Conversion Progress (12 mo.) Model Conversion of Type 1 Wind using motor1 from SRWG RepLog Case Rep Log Number of unapproved models (motor1, in WECC Basecase data 14hps1a July 2013 36 14hs4a Nov 2013 31 14ls1a March 2014 15hsp1a July 2014 Conversion to Phase 2 estimate is 526 records

MDF Review Observations Large blocks of units represented using synchronous generator models (i.e. genrou(tpj), exst1, ggov1, etc.) Dynamics Data records do not match Powerflow Turbine Type Turbine Type 21 – Type 1 Wind Turbine MDF Comment = Type 4 Plant Model Records = Type 3 Models Large blocks represented without dynamic control models gewtg or genrou – model only Large blocks represented without full collector system equivalent

Implementation Plan Goal Update existing WECC wind/solar dynamic records with REMTF Phase 2 Wind and Solar Models Typos in Table 1 / 1A: wt1p(2p) => wt1p_b VRGTPA => VTGTPAT FRQTPA => FRQTPAT

Notes on wt1p and wt2p REMTF recommended removing wt1p and wt2p models from the WECC Approved Model List No pitch controller for passive stall turbines wt1p_b should be used for active stall turbines REMTF will take action to inspect MDF Make recommendation of either deleting wt1p and wt2p records or replacing records with wt1p_b models

2014 SRWG Base Case Compilation Schedule Data Request to Start Transition

2015 SRWG Base Case Compilation Schedule Phase 2 Target Completion Date Remove Phase 1 Models Add un-converted models to PPMDTF list PPMDTF review target completion date

Proposed Implementation Timeline MVWG Renewables Workshop 6/17/2014 Initial WECC Data Request 7/18/2014 Target Completion Date 6/05/2015 Remove Ph. 1 Models from Approved List 6/05/2015 Begin PPMDTF Review 7/10/2015 Target Completion of PPMDTF Review 12/18/2015

Relevant Timeline for NERC Modeling Data Verification Standards R1, R3, R4, R5, R6 07/1/2014 R2 (30%) 07/1/2018 R2 (50%) 07/1/2020 R2 (100%) 07/1/2024 MOD-027-1 R1, R3, R4, R5 07/1/2014

Relevant Timeline for NERC Modeling Data Reporting Standards

SRWG Discussion Is the proposed implementation plan reasonable? SRWG Member Recommendations

Next Steps Add SRWG Member Comments Publish Phase 2 Implementation Plan Post to SRWG Site Develop Tool for Tracking Progress Stand Alone or Replog Encourage data submitters to improve steady-state and dynamic data representation of wind and solar plants in WECC Basecases Encourage use of WECC Wind and Solar Modeling Guidelines Develop Tool for checking Powerflow Turbine Type Data against dynamics data modeling records

Resources/References WECC Wind Plant Dynamic Modeling Guidelines http://www.wecc.biz/committees/StandingCommittees/PCC/TSS/MVWG/Shared%20Documents/MVWG%20Approved%20Documents/WECC%20Wind%20Plant%20Dynamic%20Modeling%20Guidelines.pdf WECC Solar Plant Dynamic Modeling Guidelines http://www.wecc.biz/committees/StandingCommittees/PCC/TSS/MVWG/Shared%20Documents/MVWG%20Approved%20Documents/WECC%20Solar%20Plant%20Dynamic%20Modeling%20Guidelines.pdf Status Update of WECC Models 2014-6-19 http://www.wecc.biz/committees/StandingCommittees/PCC/TSS/MVWG/20140617/Lists/Presentations/1/Status%20Update%20of%20WECC%20Models%202014-6-19.docx

Questions Eric Bakie, P.E. SYSTEM PLANNING ENGINEER Idaho Power | System Planning  (208) 388-5677  ebakie@idahopower.com