National Grid: Gas Transmission System Operator

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Hybrid Option(s) Ritchard Hewitt – August Fundamentals  Parameters – Cost Reflective, Incentive, Value  Cost – What does it cost the service provider.
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning.
Linepack ‘Park and Loan’ Quantity - Influencing Factors Review Group 291 – July 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Gas Emergency Cash Out – A Shipper Perspective Transmission Workstream 3/7/08 Steve Rose.
NTS Update Gas Customer Forum 25 th September 2006.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
NEC Network Emergency Exercise - Exercise Prelude.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Operation Iain Ward DNCC Manager. Responsibilities  Licence Holder  Obligation For 1 In 20 Capacity  DNCC Operates Networks Under Direction of The.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review Group -140 Thoughts on additional information requirements.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Fuel Cost Components in the Fuel Adder
Transmission Workstream 4th July 2007
SO Incentives from April 2010
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Ritchard Hewitt – September 2010
195AV “Future work” – system flexibility
Presentation transcript:

National Grid: Gas Transmission System Operator Paul Gallagher NTS Optimisation Manager National Grid

Gas Transmission in Great Britain ~8,200km pipeline Operating pressure 70 - 94bar 7 Beach Reception Terminals 3 LNG Importation Terminals 3 Interconnectors 10 storage sites 23 compressor stations 200+ Exit Points Highest Demand Day : 465 mcm Lowest Demand Day : 117 mcm Annual Throughput : 85 bcm St. Fergus Teesside Barrow Easington Burton Point Theddlethorpe Bacton Milford Haven Isle of Grain

Gas Technical Supply Maximum vs. 1 in 20 Peak Demand

Changing Network Flows 2013 on…

Role of NG as Transmission System Operator

Key roles of the System Operator Residual Energy Balancing of the Gas Market Safe, reliable and efficient operation of the National Transmission System (NTS) Facilitation of efficient market operation Response to events and emergencies

Statutary / Commercial Framework RULES Legislation, e.g. Gas Act, GS(M)R, Pipeline Regs, HASAW etc Safety Case (PGT and NEC) Uniform Network Code / Offtake Arrangement Document Transmission Licence EU Regulations and codes (new and increasing) CONTRACTS NEXAs, NEAs, SCAs etc INCENTIVES Balancing, Shrinkage, Capacity, Demand forecast etc Customer Satisfaction

Commercial Frameworks HSE Ofgem UNC Safety Cases GT Licence Incentives Network Entry Agreement (NEA) Network Exit Agreement (NEXA) Entry Facilities National Grid NTS Directly Connected Consumers Uniform Network Code (UNC) Offtake Arrangements Document (OAD) Storage Connection Agreement (SCA) Distribution Networks Shippers Storage

System Operator Incentives Incentives play a key role in defining how we operate our business Obligations define what we should do, whereas incentives define how we should carry them out to align with customer requirements Incentives change over time and are reviewed regularly based on customer feedback. The RIIO regulatory framework created three categories of incentive: Cost Incentives – These are schemes where if we reduce costs to below the target level then we can share a proportion of savings or conversely share a proportion of the overspend with users Performance incentives – Stakeholders have specific performance requirements. We recover additional income if we meet/beat them and vice versa Reputational incentives - These set out areas where we have obligations to carry out activities including reporting on them to our customers and stakeholders 9 9

Balancing

Balancing Responsibilities Shippers Role Obliged to provide commercial input and output nominations to National Grid before the day (forecasts) Can chose to re-nominate throughout the gas day Incentivised to ensure nominations / re-nominations are accurate Incentivised rather than obliged to physically balance portfolio NTS Connected Sites Obliged to provide physical entry profiles (DFN’s) NTS Connected Sites Obliged to provide physical exit profiles (OPN’s) Gas Supply Gas demand

Shipper Balances by Gas Supply Gas demand Supply Nominations Shippers send nominations to National Grid via Gemini what gas they propose to input into the NTS for the gas day Beach / Imports / LNG Storage Withdrawals Trades - NBP Buys Demand Nominations Shippers send nominations to National Grid via Gemini what gas they propose to take out of the NTS for the gas day DM Load Nominations NDM Load Nominations Storage Injections Exports Trades - NBP Sells Gas Supply Gas demand

Imbalance Cashout Shipper paid the SMP(S) for ‘excess’ gas Shippers incentivised to nominate accurately through Scheduling charges. Shippers Incentivised to balance through Imbalance Cashout – it is based on physical allocations not nominations and is faced by ‘out of balance’ shippers. Lesser of: Lowest Priced National Grid Gas Action OR SAP - 0.88p/therm Shipper Over-delivery Shipper paid the SMP(S) for ‘excess’ gas Shipper penalised for overdelivery as the SMP(S) is a “poor” price. Shipper penalised for underdelivery as the SMP(B) is a “high” price. Shipper Balanced Shipper pays the SMP(B) for its ‘deficit’ gas Greater of: Highest Priced National Grid Gas Action OR SAP + 0.88p/therm Shipper Underdelivery

Balancing Responsibilities National Grid’s Role – Residual Balancer Ensure NTS balance is within safe operating limits NG balancing trade actions at times of forecast imbalance Cannot ‘instruct’ users NG neutral to direct costs of system balancing, but NG incentivised to ensure Daily change in line pack < 2.5mcm Impact of actions taken on price is minimised Shippers Role Obliged to provide commercial input and output nominations (forecasts) No obligation to physically balance portfolio Incentivised to balance portfolio NTS Connected Sites Obliged to provide physical entry profiles (DFN’s) NTS Connected Sites Obliged to provide physical exit profiles (OPN’s) Gas Supply Gas demand

Neutrality Costs National Grid is neutral to any charges or credits

Allocations In GB nominations are effectively a forecast of expected flow Allocations are based on physical ‘metered’ flow at the site Where > 1 shipper at a site, then a post event allocation process has to take place to allocate the gas between the shippers At exit points this runs until D+5 At entry points this takes until M+15 Further complications at bi-directional sites such as storage and interconnectors

System Operator Actions Balancing Operational tools (internal) Operational tools (external) Commercial tools Network Integrity Utilise Linepack National Energy Actions Physical Energy Actions Margins Notice Gas Deficit Warning Operating Margins Gas Deficit Emergency Information Provision (MIPI / Website / Gemini) 17

Supply Loss and Response 18

Linepack 19

Operation of the NTS

Drivers of system operation Statutary Pressure integrity Gas Quality Environmental Commercial Delivering obligated and purchased capacity rights to shippers Meeting assured pressures at offtakes Equalising CV across distribution zones Minimising cost of compression Miinimising impact of maintenance on customers

Capacity Release Every Entry and Exit point on the NTS has an obligated capacity Level defined within NGs transportation licence NG must release capacity to this level every day, irrespective of physical capability to allow flow Range of auctions used to release capacity (> 50 run every day) Shippers can buy long term for up to 17 years ahead at entry points, or wait and ‘buy’ capacity on the day Firm and ‘interruptible’ products available Shippers are incentivised to purchase Capacity rights to flow gas onto and off of the NTS If a shipper flows more gas than they have purchased capacity for then they incur overrun charges Total obligated capacity at both entry and exit from the NTS is approximately 2 X peak demand

Data flows into NG To allow NG to operate the network effectively users are obliged to provide information in 2 ways : Nominations / renominations Provided by shippers Define ‘commercial’ daily flow at entry and exit points Provided from 30 days ahead, and updated on ad-hoc basis Feed through to allocations, billing, scheduling charges Very limited operational use Notifications Provided by site operators (subterminals / storage / interconnectors at entry, Distribution networks / power stations / storage / interconnectors at exit) Define a ‘physical’ hourly profiled flow expectation at entry and exit points Provided from day ahead, and updated hourly within day NG use these for forecasting flows on the network, modelling pressure profiles and identifying capacity constraint risks Feed into supply, demand and linepack forecast calculations etc Wide range of operational uses. Basis of network configuration decisions.

Before the Day Day Ahead Gas Day After the Day Network Analysis & Risk Envelope Day-Ahead Off-peak Capacity Incentive Performance Long Term Capacity Sales Day-Ahead Firm Capacity Within-day Firm Capacity Capacity Revenue Rolling Capability Assessment Post Event Analysis & Lessons Learnt Initiates Constraint Management / Balancing Strategy Demand Forecasts D-1 Initial OPN OPN Revisions Supply & Demand After-the-day Analysis Supply Forecasts D-1 Initial DFN DFN Revisions Planned Maintenance Post Event Analysis Plant trips/failures Unplanned Maintenance Reliability Data OCS Assured Pressures Agreed Pressures Pressure KPI Contractual Obligations Linepack & Pressure Monitoring

System Operator Actions Network Management Operational tools (internal) Operational tools (external) Commercial tools Network Integrity Reconfigure Network Redistribute Linepack Utilise Compressors Move / cancel Maintenance Agree revised Pressures Flow Swaps Enforce Contractual Offtake Rules Scaleback ‘Interruptible’ Capacity Locational Energy Actions Capacity Surrender Offtake Flow Reductions Constraint Management Agreements Operating Margins Terminal Flow Advice (Entry) Shutdown sites Critical Transportation Constraint Information Provision (MIPI / Website / Gemini) 25

Incentives in NTS operation Capacity (+£20m to -£60m / year) Release > capacity than obligated if users want it Deliver capacity that has been released Shrinkage (+£7m to -£7M / year) Minimise compressor usage Minimise price paid for energy to power compressors Environmental (+£0m to -£unlimited M / year) Reduce compressor gas venting Maintenance (+£1.5m to -£1.5M / year) Reduce days that offtakes are shutdown to allow maintenance Reduce number of plan changes

Facilitating efficient operation

Market facilitation Provide range of services to facilitate efficient market operation, including Information provision (incentivised) Provision of trading and capacity platforms Forecasting (incentivised) Reconciliation Meter assurance (incentivised)

Market Information Provision Initiative (MIPI) – Prevailing View http://www.nationalgrid.com/uk/Gas/Data/prevailingview/

Market Information Provision Initiative (MIPI) - Entry Flow Data http://www.nationalgrid.com/uk/Gas/Data/EFD/index.htm Shows latest telemetered Flows into the NTS for all entry points that are capable of flows greater that 10mcm/d or NG owned & operated Data provided at 2 minute resolutions – delivered to the internet at 12 minute intervals Publishes flows for Individual Entry points ASEPs Total Instantaneous Supply Graphs available for viewing trends Manual Download of data available API’s allow automated download of latest published data

Response to Emergencies

Network Gas Supply Emergencies (NGSE) Emergency affecting the National Transmission System is classified as one of Three types: Gas Deficit Emergency (GDE) Could be caused by a shortage of beach or storage gas, failure of market arrangements, Supply shortage National Supply < National Demand Storage monitor Breach (SMB) Not enough gas in store to safely isolate protected loads Not enough gas in store to deliver the peak 1in50 Critical Transportation Constraint (CTC) Could by caused by damage to a NTS pipeline or compressor station etc A network issue that impedes gas transmission capability Could affect the safe supply of gas to Distribution Networks, NTS power stations, storage facilities, interconnectors Gas Deficit Emergency: Occurs whenever there is insufficient gas available on the NTS to maintain a national supply/demand balance (generally a short duration) Safety Monitor Breach: Safety monitors are levels of storage calculated to protect the public in the event of a statically severe “1:50” winter (See Forecasting Methodology on nationalgrid.com for further information). A Safety Monitor breach could be caused by a far longer, colder winter than forecast. (likely to be a long duration) Critical Transportation Constraint: Where there is sufficient gas on the NTS (supply=>demand) however the gas can’t get to where it is required due to a transportation constraint. (typically short duration) Feedback on the last emergency exercise DFO / SFO obligations in an emergency Possible standalone National Grid emergency exercise in 2014 Request feedback on the new DECC portal

Network Emergency Co-ordinator (NEC) national grid Role performed by National Grid but NEC independent of System Operator Co-ordination of actions of gas industry to prevent or minimise safety consequences of a supply emergency Independent from any commercial interests of industry Industry parties have a duty to co-operate with the NEC

Emergency Actions available to the Network Emergency Co-ordinator NTS Linepack Usage Distribution Co-operation & Storage Usage Gas Specification GS(M)R Rules Stage 1 (Potential) Maximise NTS Supplies Firm Load Shedding National Grid suspends participation in OCM Stage 2 Stage 3 Distribution Network allocation & isolation Public Appeals Stage 4 Restoration of Supplies Purge & Relight