FCC-hh Injection and Extraction

Slides:



Advertisements
Similar presentations
Performance reach of LHC beam dump B.Goddard: input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, F.Velotti, M.Barnes, C.Bracco, V.Senaj, M.Meddahi,
Advertisements

Concept & architecture of the machine protection systems for FCC
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
Semiconductor Switch Designs M.J. Barnes Acknowledgements W. Bartmann, L. Ducimetière, B. Goddard, J. Holma, A. Lechner, T. Fowler, T. Kramer, M. Meddahi,
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
WP3: Beam Transfer Challenges M.Atanasov, M.Barnes, T.Kramer, B.Goddard, P.van Trappen Special technologies.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Comparing current waveforms and shielding options for SMH42 Zsolt Szoke LIU-PS Meeting, 16/12/2014.
FCC DUMP SYSTEM W. Bartmann, B. Goddard, R. Ostojic FCC Dump Meeting, 14 th Jan
Principals of fast injection and extraction R. Apsimon.
Review of FCC-hh optics & beam dynamics IPNO, Orsay, Paris November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
Beam absorbers for Machine Protection at LHC and SPS
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
T. Kramer, CERN TE/ABT FCC-week 2016, Rome, Italy Acknowledgements
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
HP-PS injection and extraction status W. Bartmann, B. Goddard HP-PS meeting, 20-November 2013.
Brennan Goddard CERN AB/BT LHC LUMI th October 2006 Beam transfer considerations The various mooted upgrades of the CERN accelerator complex up to.
PS2 WG Injection and extraction systems Basics and assumptions
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
FCC Special Technologies WP3 (Beam Transfer Challenges) Summary M. J
LINAC4 ADVISORY COMMITTEE
Emergency dumping of proton and ion beams in SIS100 F
Surviving an Asynchronous Beam Dump?
The LHC Beam Dumping System
Introduction: FCC beam dumping system
LHC beam dump 7.56 TeV operation
Injection system design for high-energy circular collider FCC-hh
Options and Recommendations for TL and Dumps
CLIC Damping ring beam transfer systems
Emittance growth AT PS injection
Septa requirements and suitable septa topologies for FCC
Case Study - Group 2 FCC-ee Top-Up Injection
FCC hh dump kicker - switch topologies and impact on beam
AD & I : BDS Lattice Design Changes
Bunch Separation with RF Deflectors
FCC-hh injection group 7
Strip-line Kicker R&D at KEK-ATF
2017 CAS Erice case study: Design of a beam dumping system for FCC
PS2 Injection/Extraction Layout
Multi-Turn Extraction for PS2 Preliminary considerations
Feed forward orbit corrections for the CLIC RTML
Status of CTC activities for the Damping rings
Negative Momentum Compaction lattice options for PS2
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
Proposal for a CESR Damping Ring Test Facility
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

FCC-hh Injection and Extraction Wolfgang Bartmann, CERN with many inputs from M. Atanasov, M.J. Barnes, J. Borburgh, T. Fowler, B. Goddard, W. Herr, T. Kramer, A. Lechner, M. Meddahi, R. Ostojic, R. Schmidt, D. Schulte FCC week, 23th-27th March 2015

FCC Injection and Extraction 24/03/2015 FCC Injection and Extraction Outline FCC injection Machine protection consideration Kicker rise time specification Septum strength Optics and overall insertion length FCC dump system Extraction locations and link with collimation Insertion overview and alternative concepts Dump block limitations Summary Challenges Study directions and R&D programs Timeline

FCC Injection and Extraction 24/03/2015 FCC Injection and Extraction FCC-hh parameters

FCC Injection and Extraction 24/03/2015 FCC Injection and Extraction Injection concept Fast bunch-to-bucket transfer A total of 650 MJ beam energy to transfer For HL-LHC with an injected beam energy of ~5 MJ reach limit of injection protection devices Transfer beam from HEB to FCC in stages 50 – 70 bunches per transfer Gives a total of ~200 injections to fill FCC ~60 injections to transfer a full LHC bunch train Time required for the injection process Have to wait for re-synchronisation between machines (~10 ms for LHC-FCC case) Total time required to inject one LHC bunch train ~0.5 s Would need 3 - 4 LHC trains to fill FCC FCC

Constraints for FCC filling scheme 24/03/2015 FCC Injection and Extraction Constraints for FCC filling scheme Beam transfer from HEB to FCC is machine protection limited Aim to fill 80% of FCC Assume about 3 us for abort gap 280 ns rise time for injection kicker rise time

FCC Injection Schematic 24/03/2015 FCC Injection and Extraction FCC Injection Schematic Lambertson septum QF Injection kicker QD Internal dump 150 m Massless septum as active injection protection?

Injection septum strength 24/03/2015 FCC Injection and Extraction Injection septum strength

Injection straight optics 24/03/2015 FCC Injection and Extraction Injection straight optics Increase regular half cell length from 100 m to 150 m in injection insertion Relax magnet strengts, make space for instrumentation and protection devices Maximum betas of 620 m – why not go higher? Total injection insertion requires about 500 m for septum, kicker and internal dump Further protection downstream is required

FCC Injection and Extraction 24/03/2015 FCC Injection and Extraction Injection HW

FCC Injection and Extraction 24/03/2015 FCC Injection and Extraction FCC Extraction

FCC Injection and Extraction 24/03/2015 FCC Injection and Extraction FCC Extraction Two separated extraction insertions Sequence of collimation and extraction systems If betatron cleaning is separated would be ideal to have collimation downstream extraction Protection of downstream machine and experiments in case of asynchronous dump

Dump insertion – LHC scaled 24/03/2015 FCC Injection and Extraction Dump insertion – LHC scaled 110 m 400 m Rms beam size ~ 1 mm Extraction kicker: 0.13 mrad, 22 T.m 110 m drift Enlarged quadrupole: 9 mm offset Bump (not in LHC): 9 mm 0.3 mrad, 50 T.m Extraction septum: 17 mm septum width 150 m drift to clear blade 50 m for protection devices +2 bumpers 200 m available length 1.7 mrad, 284 T.m, 1.42 T

Dump insertion alternatives 24/03/2015 FCC Injection and Extraction Dump insertion alternatives SSC like Septum is part of extraction bump Use field free channel of septum to extract Need strong, good field quality septum Asymmetric insertion optics Avoid asynchronous dumps by accepting single kicker erratic High segmentation of kicker system (200-300 modules) Asymmetric optics to reduce oscillation from single kicker failure (small hor beta) to reduce kicker strength and dilute beam at absorbers (high betas at septum)

Requirements for special quadrupoles 24/03/2015 FCC Injection and Extraction Requirements for special quadrupoles Enlarged quadrupole Triple chamber quadrupole? Beam offset: Injection up to 18 mm Extraction up to 9 mm

Dump block limitations 24/03/2015 FCC Injection and Extraction Dump block limitations Assume 1.5 km dump line without active dilution 400 µm rms beam size at dump Assuming graphite (1.2-1.77 g/cm3) Limit in energy density such that peak temperature of ~1500°C not exceeded Minimum of ~1.8 mm separation between bunches  requires min of 20 m linear sweep length! Actively dilute beam in dump line (beta function of 100 km) 2.0 mm rms beam size Still need ~1.5 mm separation between bunches - not much gain from active dilution See talk by A. Lechner: Energy deposition challenges Unit 25 ns 5 ns Bunch population 1e11 0.2e11 # bunches 10600 53000 Transv. emittance normalised um 2.2 0.44 Spotsize at dump (rms) for 1.5 km dump line mm 0.4 - 1.6 0.2 – 0.7 Total beam energy GJ 8.5 Average power (5 h fills) kW 500

FCC Injection and Extraction 24/03/2015 FCC Injection and Extraction Summary Challenges Study direction and R&D programs Timeline

FCC Injection and Extraction 24/03/2015 FCC Injection and Extraction Challenges Beam energy at HEB-FCC transfer and FCC injection Fast injection kicker field rise and recharging Injection protection: passive, maybe also active Asynchronous dump mitigation Kicker system segmentation Kicker generators: ultra-reliable triggering Asynchronous dump protection devices Dump absorber Beam dilution Special insertion magnets Limited access possibilities: hot spares, remote handling Controls and electronics: remote, compact, reliable, radiation hardness Power consumption/recycling Constraints on filling schemes from injection and dump

Study directions and R&D programs 24/03/2015 FCC Injection and Extraction Study directions and R&D programs Conceptual Separate extraction systems and link to other systems Failure mitigation (retriggering or segmented kicker system, #abort gaps) Beam dilution Minimize impact of injection and extraction on FCC filling scheme Kicker system Generator: fast field rise time, short pulses and fast generator recharging; semiconductor switches Magnet: Beam screen and ferrite cooling Segmentation and built-in redundancy Septa: High field Lambertson with high saturation material shims and NC or SC coils Massless septum to deflect mis-kicked beam into dedicated injection dump channel Superconducting septum Electronics Radiation to electronics mitigation Ultra-high reliability triggering and synchronisation concepts for highly segmented systems Dump absorber and passive protection devices: Study new materials and concept of sacrificial absorbers Beam dilution requirements

FCC Injection and Extraction 24/03/2015 FCC Injection and Extraction Timeline 2015: Detailed R&D program proposal for kicker generator, kicker and septum magnet, electronics Finalize conceptual studies for injection, extraction and failure mitigation Specify kicker systems, septa and special insertion magnets 2016: Finalize linear optics of injection and dump lines; dilution pattern Specify passive protection devices and massless septum for injection protection 2017: Finish error studies, specify power converter stability and field homogeneities Measurement report of individual components for kicker generators; design report prototype Finished design of kicker beam screen and ferrite cooling; radiation hard sensor board developed 2018: Finish prototype construction of kicker generator, kicker beam screen and septum CDR write-up 2019: Document prototype testing results of kicker generator, magnet, electronics and septa magnets