Management Reserve (MR) Total Allocated Budget (TAB)

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

E ARNED V ALUE M ANAGEMENT G OLD C ARD Projected Slip ? Management Reserve Cost Variance Schedule Variance ACWP Cum BCWP Cum BCWS Cum $ EAC Time Now Completion.
Presenter: Sohel Akhter, PMP, CCNA,ISMS
Module 8: Government Required Reports
EV Basics Tutorial Lesson 1 – Earned Value Management Basics
An Overview of Earned Value Management (EVM) Using EVM to Track Progress.
1 Estimating Costs At Completion Review this tutorial and the Project Pyramid Exercise until you are fully comfortable with how to calculate an estimate.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Monitoring and Control Earned Value Management (EVM)
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Degree and Graduation Seminar Cost Management
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Earned Value Management (EVM) Fundamentals
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
BASICS OF EARNED VALUE MANAGEMENT
Earned Value Management
Project Management 6e..
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
Roberta Tomasini Defense Acquisition University DSN Earned Value and the Acquisition Program.
1 NASA Earned Value Management Update August 2006.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Software Project Management (SPM)
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
1 Alternative EVM Applications Not a One-Size-Fits-All.
Project Cost Management
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Brookhaven Science Associates U.S. Department of Energy Facility Managers Meeting DOE-OECM Certification of Earned Value Management Systems April 27-28,
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management 6e..
O The Integrated Program Management Report (IPMR), Data Item Description DI-MGMT (latest version) at DIDs.shtml,
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
EVM UPDATE JANUARY 31/FEBRUARY 2, EVM REQUIREMENTS NASA PROCEDURAL REQUIREMENTS (NPR) D - NASA SPACE FLIGHT PROGRAM AND PROJECT MANAGEMENT.
Where Module 04 : Knowing Where the Project Is 1.
Presented by Niyi Ladipo September 14,  Results of the Survey  What is Earned Value Management (EVM)?  EVM vs. Traditional Cost Management 
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
Earned Value Management Reading the Roadmap to Project Success (or, Are We There Yet?) Steve Margolis, PMP Perpetual Technologies, Inc. March 19, 2008.
E ARNED V ALUE M ANAGEMENT ‘G OLD C ARD ’ Projected Slip ? Management Reserve Cost Variance Schedule Variance ACWP Cum BCWP Cum BCWS Cum $ EAC Time Now.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Earned Value Management Reading the Roadmap to Project Success (or, Are We There Yet?) Steve Margolis, PMP Perpetual Technologies, Inc. April 13, 2010.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Performance Measurement Baseline Contract Price (Project Price)
CHAPTER:7 Project Cost Management
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
Performance Measurement Baseline Contract Price (Project Price)
EVM 202—Lesson 7 Tools Analysis Case Study
EVM 202—Lesson 3 EVMS Guidelines and Compliance
EVM 202—Lesson 7 Tools Analysis Case Study
Earned Value Measures Planned Value (PV) Earned Value (EV)
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Missile Defense Agency EVM Update
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Management Reserve (MR) Total Allocated Budget (TAB) Performance Management Reference Card Work Packages Planning Packages Control Accounts Summary Level Overrun Negotiated Contract Cost Over Target Baseline Contract Budget Base Total Allocated Budget Contract Price or In-house Project Price Performance Measurement Baseline Management Reserve Profit / Fees (no In-house equivalent) Authorized Unpriced Work Undistributed Budget NASA Contractor & In-house Project Hierarchy ETC Schedule Slip Management Reserve (MR) Cost Variance Schedule Variance “Actuals” ACWPCum “Earned” BCWPCum “Plan” BCWSCum $ EAC Time Now Completion Date PMB Total Allocated Budget (TAB) BAC EVM Regulations/Requirements Refer to the NASA Earned Value Management website http://evm.nasa.gov/ OMB Circular A-11, Appendix J NASA NPD 7120.4D – NASA Engineering and Program/Project Management NPR 7120.5E – NASA Space Flight Program and Project Management Requirements - defines when EVM is required and requires projects with EVM requirements to use an EVM system that complies with the 32 Guidelines found in the EIA-748 Earned Value Management System (EVMS) Standard NPR 7120.7 – NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements NPR 7120.8 – NASA Research and Technology Program and Project Management Requirements NASA FAR Supplement Part 1834: Major System Acquisition Part 1852.234-1/2: Earned Value Management System NASA Procurement Information Circular (PIC), 10-17, Class Deviation to NFS 1816.405-274: Award Fee Evaluation Factors are not Directly Tied to EVM Metrics NASA/Defense Contract Management Agency Memorandum of Understanding NASA EVM Contract Requirements Checklist Overall Status* % Schedule = (BCWSCUM / BAC) * 100 % Complete = (BCWPCUM / BAC) * 100 % Spent = (ACWPCUM / BAC) * 100 Variances Positive is Favorable, Negative is Unfavorable Cost Variance CV = BCWP – ACWP (-)=over (+)=under budget CV % = (CV / BCWP) * 100 Schedule Variance SV = BCWP – BCWS (-)=behind (+)=over schedule SV % = (SV / BCWS) * 100 Variance at Completion VAC = BAC – EAC VAC % = (VAC / BAC) * 100 *Note: For total contract, budget at completion should include management reserve and undistributed budget Efficiencies Cost Efficiency CPI = BCWP / ACWP Favorable is > 1.0, Unfavorable is < 1.0 CPI: For every $1.00 of actual cost, we earned $X worth of work planned Schedule Efficiency SPI = BCWP / BCWS Favorable is > 1.0, Unfavorable is < 1.0 SPI: For every $1.00 of work planned (scheduled), $X worth of work was accomplished or earned. EVM Reports The Integrated Program Management Report (IPMR), Data Item Description DI-MGMT-81861, is a consolidation of the Contract Performance Report (CPR) and the Integrated Master Schedule (IMS). See NASA IPMR Data Requirements Description (DRD) Guide at http://evm.nasa.gov/ for preparation of the IPMR DRD. Effective March 2015 on new contracts. Reporting for Non-EVM Contracts - see Appendix E of the NASA/SP-2012-599 Earned Value Management (EVM) Implementation Handbook for sample DRDs Sample Standard Analysis Package (http://evm.nasa.gov/) wInsight 6.x Database Document Type Definition File Baseline Execution Index (BEI) & Hit/Miss Task % (Favorable is > 1.0, Unfavorable is < 1.0) BEI = Total Baseline Tasks Completed / (Total Tasks with Baseline Finish On or Prior to Current Report Period) Hit /Miss Task % = 100 * (Tasks Completed ON or PRIOR to Baseline Finish / Tasks Baselined to Finish within Current Report Period). Calculated Estimate at Completion = Actuals to Date + [(Remaining Work) / (Performance Factor)] Examples: EACCPI = ACWPCUM + [ (BAC – BCWPCUM) / CPICUM ] – typically a best case EACComposite = ACWPCUM + [ (BAC – BCWPCUM) / (CPICUM * SPICUM) ] – typically a worst case To Complete Performance Index (TCPI) § # TCPITarget = Work Remaining / Cost Remaining = (BAC – BCWPCUM) / (Target – ACWPCUM) TCPI: For every $1.00 of cost, estimate to earn $X worth of work planned to finish on EAC §To Determine the TCPI for BAC or EAC ; Replace TARGET with BAC or EAC # To Determine the Contract Level TCPI for EAC, You May Replace BAC with TAB EVM Implementation Handbooks NASA/SP-2010-3403 NASA Schedule Management Handbook. To request the NASA Schedule Test and Assessment Tool (STAT) application software, complete the Software Release Request Form and send to Danny Garcia at danny.Garcia-1@nasa.gov NASA/SP-2012-599 Earned Value Management (EVM) Implementation Handbook NASA/SP-2010-3406 Integrated Baseline Review (IBR) Handbook NASA/SP-2010-3404 NASA Work Breakdown (WBS) Structure Handbook Revised March 2015 1

Jerald Kerby, Agency EVM Program Executive & MSFC EVM Focal Point Acronyms ACWP Actual Cost of Work Performed - Cost actually incurred in accomplishing work performed aka Actual Cost (AC) AUW Authorized Unpriced Work - Work formally authorized, but not yet negotiated/definitized BAC Budget At Completion - Total budget for total project/contract thru any given level BCWP Budgeted Cost for Work Performed - Value of completed work in terms of the work’s assigned budget aka Earned Value (EV) BCWS Budgeted Cost for Work Scheduled - Time-phased Budget Plan for work currently scheduled aka Planned Value (PV) BEI Baseline Execution Index – Similar to the SPI, the metric used to indicate the efficiency with which actual work has been accomplished when measured against the baseline. It compares the cumulative number of baselined tasks actually completed each month to the cumulative number of baselined tasks scheduled to be completed each month. To assess whether the tasks actually completed as planned during a current month, calculate the Hit/Miss Task %. CA Control Account - Lowest WBS element assigned to a single focal point to plan & control scope / schedule / budget CBB Contract Budget Base - Sum of the negotiated project/contract cost plus the estimated cost of authorized unpriced work. It includes the PMB and MR. Customer approval is generally required to change it. CPI Cost Performance Index - A measure of cost efficiency. Worth of work for every dollar spent. It compares BCWP to the actual cost to perform that work (CPI = BCWP / ACWP). CPM Critical Path Method - A sequential path of tasks in a network schedule that represents the longest overall duration from “time now” through project completion. Any slippage of the tasks in the critical path will increase the project duration. DRD Data Requirements Description - The document that describes the specific data required for supplier/contract management and reporting. EAC Estimate At Completion - Estimate of total cost for total project/contract thru any given level generated by Supplier (Ktr), PMO, DCMA, etc. = EACKtr / PMO / DCMA. The Supplier’s EAC is also known as Latest Revised Estimate (LRE). ETC Estimate To Complete - Expected/anticipated costs needed to complete the remainder of work on project/contract. IBR Integrated Baseline Review - A risk-based review conducted by Program/Project Management to ensure mutual understanding between the customer and supplier of the risks inherent in the supplier’s performance measurement baseline (PMB) and to ensure the PMB can be accomplished within the authorized schedule and budget. IPMR Integrated Program Management Report - Consists of seven formats containing data for measuring cost and schedule performance on Government acquisition contracts (Formats 1-5 formerly the Contract Performance Report (CPR)): Format 1 defines cost and schedule performance data by product-oriented WBS elements. Format 2 defines cost and schedule performance data by supplier's organization structure. Format 3 defines changes to the Performance Measurement Baseline (PMB). Format 4 Defines staffing forecasts. Format 5 is a narrative report used to provide the required analysis of data contained in Formats 1-4 and 6. Format 6 defines and contains the Integrated Master Schedule (IMS). Format 7 defines the time-phased historical and forecast cost submission. LOE Level of Effort - Effort of a general or supportive nature that does not produce definite end products. Examples include supervision, program administration and contract administration. NCC Negotiated Contract Cost - Contract Price Minus profit or fee(s). For In-house projects, the agreed to value. OTB Over Target Baseline - Sum of CBB + additional budget approved for remaining work. PAC Price At Completion - EAC Plus Adjusted Profit or Fee(s). PMB Performance Measurement Baseline - The time-phased budget plan for authorized work. PP Planning Package - Far-term effort not yet defined into WPs. SLPP Summary Level Planning Package - Far-term contract activities not yet defined into CAs. SPI Schedule Performance Index - A measure of schedule efficiency. It compares the BCWP to the work scheduled (SPI = BCWP/BCWS). An index of 1.0 means the work is being performed right to the schedule. SPI > 1.0 means that the work is ahead of schedule. SPI < 1.0 means that the work is behind schedule. TAB Total Allocated Budget - Sum of all budgets for work on in-house project or contract = NCC, CBB, or OTB. UB Undistributed Budget - Budget associated with specific work scope or authorized changes that have not been assigned to a CA or lower level WBS element. UFE Unallocated Future Expenses – Estimated cost that cannot be allocated to WBS elements due to risk and future needs. VAC Variance at Completion – Comparison of the BAC to the EAC through any given level (expected overrun or underrun of total costs) WP Work Package - Near-term, detail-planned activities within control account; unit of work at level work is performed. WBS Work Breakdown Structure – A hierarchical product-oriented division of program tasks depicting the breakdown of work scope for work authorization, tracking, and reporting purposes. JCL Policy NPD 1000.5 under Section H3 with “Joint cost and schedule confidence levels are to be developed and maintained for the life cycle cost and schedule associated with the initial lifecycle baselines (e.g., for space flight programs and projects baselines established at KDP-I or KDP-C).” EVM Application and Thresholds EVM system compliance and use is required on all acquisitions for development designated as major in accordance with OMB Circular A-11 and the Capital Programming Guide, and for development or production projects/contracts and subcontracts, including those for flight and ground systems, institutional requirements (facility, information technology, investment, etc.) valued at or greater than $20 million. The primary consideration for EVM applicability is the nature of the work, associated risks, and the value of the effort. EVM is not recommended on Firm Fixed Price contracts or contracts that are exclusively LOE. Refer to the NASA Earned Value Management public website http://evm.nasa.gov/ Development/Production Contract (Total Estimated Value) EIA-748 EVMS NASA EVMS Solicitation & Contract Clause IPMR DRD (Effective March 2015 on new contracts) WBS DRD Project Cost Report DRD (Non-EVM) Supplier Flow Down (EVM) Cost or Incentive Type ≥ $50M Validation Required Required: NFS 1852.234-1 & NFS 1852.234-2 Formats 1, 3, 5 and 6 required; Formats 2, 4 and 7 recommended Required Required if EVMS and IPMR not required Same as for Prime contract; Prime must flow down EVM requirements Cost or Incentive Type $20M but < $50M Compliance with guidelines; validation not required with Alternate Formats 1, 3, 5, and 6 required; Formats 2, 4, and 7 optional. Cost or Incentive Type < $20M Not required (optional at discretion of PM) Not required unless PM elects to require EVM; then apply NFS 1852.234-1 & NFS 1852.234-2 with Alternate Format 6 (IMS) required; Format 5 recommended. Formats 1-4 not required unless PM elects to require EVM Required If EVMS and IPMR not required N/A Firm Fixed Price Not required Jerald Kerby, Agency EVM Program Executive & MSFC EVM Focal Point jerald.g.kerby@nasa.gov (256) 544-3243 2