Comments to Manufacturing QA documentation

Slides:



Advertisements
Similar presentations
1 FAA/NASA/Industry Review of Key Characteristics for Composite Material Control Mark Chris, Principal Engineer Bell Helicopter Textron Composite M&P /
Advertisements

AS9102 First Article Inspection Report
PROJECT MANAGEMENT PROJECT MANAGEMENT. PLANNING - PROGRESS.
Codes & Standards.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
PPAP Requirements Training
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
Qualification for Brazing
First Article Inspection Report
SUBSAFE Approved for Public Release
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
For the benefit of business and people
November 18, 2008 SRF Pressure Safety at Fermilab Tom Nicol Technical Division – SRF Department.
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
First Article Inspection
Training Services Consultancy Auditing Inspection S.
Tim Haeberle API SC Winter Meeting
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
November 7, Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed.
1 Inspection and Testing Approved for Public Release.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
Materials Bratislava 11/12/13 April 2005 Presented by Peter Hanmore For the benefit of business and people TAIEX Workshop on the Pressure Equipment Directive.
Certificate in Pipeline Construction, Welding & Inspection LECA LEXTON ENERGY CORPORATE ACADEMY Copyright 2013 Lexton Energy Incorporated PCWI delivered.
Applied Materials Confidential Authorized Labels for Information: Applied Materials Confidential. Applied Materials Confidential Restricted/Modifier Applied.
1 TAIEX PED workshop - IM TAIEX Workshop on the implementation of the Pressure Equipment Directive (PED) Bucharest, 27 February - 1 March 2007 Non-Destructive.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section.
Specification of niobium sheets 031/05/2010 O. Capatina G. Arnau Izquierdo W. Weingarten S. Atieh.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
U.S. Domestic Reactor Conversion Program Fuel Inspections and Quality Control David F. Capp Research Reactor Fuels Inspector/Engineer 2007 RRFM Conference.
C. Parente (HL-LHC Technical Quality Officer) Date:
NE 110 – Introduction to NDT & QA/QC
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
P.Freijedo Date: Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Material samples provided by Niovawe: N22: Niobium.
Status of Activities at CERN
Air Products Solutions for EN th of November 2014 Air Products Internal Use Only Name of speaker.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Metal Fabrication Quality and conformity of our products 2015.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
Supplier Quality Improvement
Duties and Responsibilities
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Nadcap Supplier Seminar Heat Treatment
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
LCLS-II Prototype Vacuum Vessel (VV) and Helium Gas Return Pipe (HGRP) FDR Planned Quality Control Effort (QC) Ken Premo 12/04/14.
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
P.Freijedo Date: Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Beam tube for Crab Cavity Beam tube provided by.
Fabrication of Boilers and Pressure Vessels
Crab Cavity Technical Coordination meeting:
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Preparation of functional/engineering specifications for HL-LHC
مرکز پژوهش و مهندسی جوش ايران تابع سازمان گسترش و صنایع نوسازی ایران
CERN Engineering Specification
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
First Article Inspection
Inspection and Testing
Self Paced Training Module 3
For the benefit of business and people
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Dennis Harwig and Bill Mohr, EWI
Presentation transcript:

Comments to Manufacturing QA documentation C. Parente (HL-LHC Technical Quality Officer) Date: 14.11.2014

Requirements for Manufacturing Readiness Due 1 month before start of manufacturing for CERN approval # Requirements 1 Niobium material samples according to Section 3.2 2 Material certificates and quality control of raw materials (including RRR measurements) 3 Material certificates of welding consumables (whenever applicable) 4 Functional and manufacturing drawings (with tolerances) 5 Design reports demonstrating that welds are designed to withstand the specified load cases (refer to Section 3.6.1) 6 Welding plan including: Welding maps Welding and brazing procedure qualification record including CERN acceptance criteria in Section 4.2 (WPQR and BPQR) Welding and brazing procedure specification (WPS and BPS) Welders performance qualification (GTAW), Welding and Brazing Operators Performance Qualifications (electron-beam welding and vacuum brazing) – WPQ, WOPQ and BOPQ 7 Manufacturing procedures (whenever required in Annex 6.3) 8 Test procedures (whenever required in Annex 6.3) 9 EB welded and vacuum brazed samples according to the requirements specified in Section 3.8.4 10 NDT personnel qualifications 11 Manufacturing and inspection plan (MIP) – list of all manufacturing and quality control operations.

Manufacturing and inspection plan (MIP) Niowave can use its own QA plan template or, if not existing, it must be created containing the list of the manufacturing steps with the their corresponding QA information provided in the process diagram (see example in the next slide)

MIP - Example Inputs Outputs Step ID Step name Procedure Ref. Acceptance criteria Ref. Training/Qualifications Ref. Reports Ref. Niowave control CERN control Responsible Date Signature Observations Comments Shaping and machining Section 3.8.2 & 3.8.3 N/A Supplier Dimensional control Section 4.1 - to be defined by supplier Functional drawings approved by CERN NP Cleaning and chemical polishing Section 3.8.5 (Annex 6.5 and 6.6) - to be defined by supplier Vacuum brazing Section 3.8.6 & BPS (ASME BPVC Section IX, part QB) ASME BPVC Section IX, part QB Visual examination ASME BPVC Section V ASME BPVC Section VIII Div. 1 EN ISO 9712 or SNT-TC-1A (ASNT) - minimum level 2 HP Helium leak tightness test EN 13185 or ASME BPVC Section V - to be defined by supplier Section 4.4 Ultrasonic examination ASTM E 1001 Section 4.2.2 Table 7 Chemical polishing Section 3.8.5 (Annex 6.6) - to be defined by supplier Electron-beam (EB) welding Section 3.8.7 & WPS (ASME BPVC Section IX, part QW) ASME BPVC Section IX, part QW ISO 13919-2 & Table 6 of Section 4.2.1 Radiographic examination Resonator frequency check & tuning Section 4.3 - to be defined by supplier Section 4.3 EN 13185 or ASME BPVC Section V Packaging & shipping Section 3.9 - To be defined by supplier Bulk chemical polishing Section 3.8.5 (Annex 6.6) and Section 3.10 - to be defined by supplier Heat treatment Section 3.10.1 - to be defined by supplier Light chemical polishing High pressure water rinse Section 3.10.2 - to be defined by the supplier RF acceptance tests at cold temperature To be defined by supplier Section 4.5 Yes

Manufacturing process diagram Complementary document to the MIP, but not replacing it! Qualif. ref no?? Proc. ref no?? Inspection requires acceptance criteria Drwgs ref no?? NDT qualif?? Qualif Ref. no? Proced. Ref. no? Proced. Ref. no? Drwgs ref no?? Qualif Ref. no? Qualif Ref. no? NDT qualif?? Proced. Ref. no? Drwgs ref no?? Reference values? Or refer to procedure where acceptance values are defined General comment: The MIP and WIR indicated in the process diagram as records are specific documents that must be created to register who/when performed the task and what are the results (they will also include the reference to the corresponding required reports, when applicable).

Welding map & welding book - Examples Welding plan (example provided during meeting 01-02/10/2014) Welding book (containing also welding inspection records, WIR) Reference to the welding book should be made, when applicable, to the Manufacturing & Inspection Plan (MIP) Non-destructive tests (NDT) VT RT UT LT Other Weld ID Drawing ref. Process PQR WPS/BPS Welder ID Date Tester ID Report ref. W01 W02 W03 … Visual examination Radiographic test Ultrasonic test Leak tightness test