Paul Cheeseman & Dr Rob Davis Technical Program Delivery international Engineering Safety Management Overview.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Supporting further and higher education JISC IE Programmes Meeting JISC Requirements Catherine Grout & Rachel Bruce JISC Executive.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
WMO WMO Integrated Global Observing System (WIGOS) CBS EXPERT TEAM ON AIRCRAFT-BASED OBSERVING SYSTEMS 1st Session (Geneva, September, 2013) Dr I.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
Dr Rob Davis Technical Program Delivery international Engineering Safety Management The iESM Working Group © TPD 2013.
Assessment and eligibility
Richard Hibbert RSRL Quality, Assessment and Management Systems Manager Process management Requirements in IAEA Standards and Guides.
International Federation of Accountants International Education Standards for Professional Accountants Mark Allison, Executive Director Institute of Chartered.
Challenges and Successes of Independent Safety Assessment on New CBTC Railways Paul Cheeseman Technical Programme Delivery Ltd
Relevance and effectiveness Regional Good Standardization Practice Course July, Bangkok, Thailand Good Standardization Practice 2012.
© 2011 Underwriters Laboratories Inc. Product Recall and the Supply Chain: ISO Best Practices Robert Pollock Chair, US Technical Advisory Group for ISO.
International Civil Aviation Organization Regional Cooperation in the Southern African Development Community (SADC) Cliff Elbl CTA/Project Coordinator.
Vancouver, October 08th 2013 DB Systemtechnik GmbH Marc Geisler The challenge of transforming a rule-based system into a risk-based culture on an example.
11 th International Symposium Loss Prevention and Process Safety Promotion in the Process Industries 1 OECD Workshop on Sharing Experience in the Training.
Scottish Modern Apprenticeships
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
Introduction to ICSA for the National Union of Company Secretaries Simon Osborne FCIS, Chief Executive, ICSA December 2014.
What SMS means for an Operator’s relationship with the CAA
SAFA- IFAC Regional SMP Forum
Health and Safety.
Railtrack PLC Safety & Standards Directorate Railway Safety: Analysing Risks and Causes Sally Brearley Railtrack Safety and Standards Directorate 8 December.
Risk Assessment – An Essential Standard
Miguel Nunes Information Systems Project Management IS Project Resources.
Reflection What were two key messages from Session 2? What have you implemented during the last two weeks? What are you disappointed not to have covered.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Assessed and Supported Year in Employment ( ASYE )
Basics of OHSAS Occupational Health & Safety Management System
18 September Licensing for Next Generation Signalling Buddhadev Dutta Chowdhury 27 th April 2012.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
Innovative Schools toolkit Strategic Workshop 3 - Exploring good practice case studies.
Risk Management for Technology Projects Geography 463 : GIS Workshop May
Best Practice in Nuclear Security and the role of the World Institute for Nuclear Security (WINS) Towards a CBN Security Culture: developing a holistic.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Ensuring Food Safety in Europe through Scientific Cooperation and Networking The Role of EFSA Carola Sondermann EFSA Polish Focal Point – Annual Experts.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory.
1 February 2005 Briefing Sessions Draft Regulations Using Water for Recreational Purposes.
Using Human Component Mapping TO ANALYSE & INTEGRATE HUMAN FACTORS ISSUES & RECORDS WITH RAILWAY HAZARD LOGS 1 Dr. Amanda C. Elliott, Simon Macmull & Harry.
Establishing a Safety Friendly Corporate Culture
European Railway Safety Strategy EIM Safety Group (PhGALLEY and J-Å HALLDEN) 29 september 2009.
Prince 2 and Project Management By Sayed Ahmed Just E.T.C.Technologies Inc. Just E.T.C Education Inc.
16-17 November 2005 COSCAP – NA Project Steering Group Guangzhou, China 1 Co-operating with the European Aviation safety Agency.
Transport Rail Safety & the Railway Safety Directive Frank Jost Single European Rail Area EU Commission 1.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Project management Topic 1 Introduction.
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
HERA Second European Stakeholder Workshop July Human & Environmental Risk Assessment An A.I.S.E and CEFIC initiative on targeted risk assessment.
IAEA International Atomic Energy Agency TM/WS TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT: MANAGING THE DEVELOPMENT OF NATIONAL INFRASTRUCTURE FOR NUCLEAR.
Department of Health The Australian Charter of Healthcare Rights in Victoria Your role in realising the Australian Charter of Healthcare Rights in Victoria.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
BIMILACI 2007 THE CHALLENGE OF CAPACITY DEVELOPMENT Washington, May 11, 2007 Bayo Adeola FIDIC Executive Committee.
HIGH SPEED RAIL ASSESSMENT NORGE
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Energy Meeting with the NGOs Taipei, 25 September 2013 Christian Kirchsteiger European Commission, Directorate-General for Energy (DG ENER) EU Policy Context.
ALEO East Midlands Wednesday 18th January
SNOMED CT Education SIG: Strategic Plan Review
NAB/RB Training Workshop In Valenciennes, April 2016
Accident investigations: developments and roles
Technical Program Delivery Group
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Co-operating with the European Aviation safety Agency
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
HSE Case: Risk Based Approach.
Standards.
CEng progression through the IOM3
Presentation transcript:

Paul Cheeseman & Dr Rob Davis Technical Program Delivery international Engineering Safety Management Overview and what’s new © TPD 2013

iESM - Aim To assist the international railway industry in delivering products/systems with acceptable levels of safety by developing & sharing good practice in railway Engineering Safety Management worldwide. Developed as part of the TPD internal research activities, for the good of the rail industry. © TPD 2013

ESM - History “YB0” – early 1990’s Network SouthEast Signalling and Telecomms YB Railtrack Electrical Engineering and Control Systems YB Railtrack YB Rail Industry iESM “YB0” – early 1990’s Network SouthEast Signalling and Telecomms YB UK Railtrack EE&CS YB UK Railtrack YB UK Rail Industry YB Generic iESM International Handbook on Engineering Safety Management International Emerging Good Practice © TPD 2013

iESM - Who is producing it? Dr Rob Davis – the originator of the risk- based safety engineering process in rail as part of the BR NSE quality system later published as “Yellow Book”. Established Yellow Book and the YB Steering Group (YBSG) and now chair of iESM WG. Paul Cheeseman – part of the BR team and the last chair of YBSG. Bruce Elliot – editor of the Yellow Book content throughout and iESM © TPD 2013

iESM Working Group Act as authority for iESM and develop/support the creation of associated supporting materials); Facilitate the efficient and effective application of iESM; Promote and facilitate the exchange of ideas for good practice that are found in the world railway community and other relevant industries; Sponsored by MTR Corporation, Hong Kong. © TPD 2013

iESM WG Members Recognised as having significant standing within the industry on matters relating to the management of engineering safety, Available and commit to the work of the Working Group and promotion of iESM; Provide a professional contribution to Working Group activities based on their skills and expertise could that be you? © TPD 2013

iESM supporters Worldwide © TPD 2013

iESM - Structure Volume 0 © TPD 2013

iESM - Business benefits Identifying risks early Integrated hazard management – three “legs” Encouraging consistency and re-use Scaling with the problem Empowering project managers and supporting users through a common approach and common “language” © TPD 2013

iESM - What’s in? Emerging good practice Support for Common Safety Methods for Risk Assessment have been mandated on parts of the railway by European Directives Consistent with: – Recent EN50128 with focus on roles and competence – New CENELEC EN50126 incorporating the former EN50128/9/155 and covering all technical systems – Guidance from RSSB UK “Taking Safe Decisions” – Guidance on using “Cross Acceptance” fast track © TPD 2013

iESM - What’s out? Bias towards any one legal system or regulatory framework (e.g. requirement to reduce risk ALARP) Known deficiencies and poor practice e.g. using risk matrices as a sole method for risk acceptance Templates, checklists, techniques etc to layer 3 Explicit consideration of maintenance activities – (temporary) English spellings! © TPD 2013

Lets look inside …… © TPD 2013

Snap shot from Vol 1 © TPD 2013

Presentation of Volume 2 © TPD 2013

iESM - Overview #1 © TPD 2013

1. Estimating risk by applying standards The standard shall at least satisfy following requirements: – be widely acknowledged in railway domain. If not the case, the standard will have to be justified; – be relevant for control of considered hazards in system under assessment; – be publicly available for all who want to use it. © TPD 2013

IEEE1474 – thank you © TPD 2013

2. Estimating risk by comparing with a reference system A Reference System shall at least satisfy following: – it has already been proven in-use to have an acceptable safety level and would still qualify for acceptance where change is to be introduced; – it has similar functions and interfaces as system under assessment; – it is used under similar operational conditions as system under assessment; – it is used under similar environmental conditions as system under assessment. © TPD 2013

CBTC Roll out using reference system Specific Application Safety Case Chengdu Line 1 Generic Application Safety Case for core system Chengdu Line 2 Reference to CDL 1 plus specific application hazard management Xian Line 2 Hangzhou Line 1 Hangzhou Line 2 Zhengzhou Line 1 © TPD 2013

3. Estimating risk by explicit risk estimation The need for the use of an explicit risk estimation could typically arise: – when the system under assessment is entirely new, OR – where there are deviations from a Standard or a Reference System, OR – when the chosen design strategy does not allow the usage of a Standard or similar Reference System because e.g. of a wish to produce a more cost effective design that has not been tried before © TPD 2013

Explicit Risk Estimation – putting it all together Derailment Rolling Stock Fault P-Way Fault Axle failure Undetected in Maintenance AND Gate OR Gate Basic Events Derailment Containment Fails Peak Loading Consequence Yes No Consequence 1 No Consequence 2 Yes Consequence 3 No Consequence 4 Yes Frequency Risk Summation Severity 1.0E-055 Fatalities 10 Serious Injuries1.0E E E-02 5 Minor Injuries No Effect © TPD 2013

iESM Overview #2 FROM RISK ANALYSIS © TPD 2013

iESM - Risk Control - Overview 1. Product / System / Project development, (design, build, test, etc.) 2. iESM activities (risk evaluation, risk control, safety argument, etc.) 3. Independent Assessment (checking and certification) © TPD 2013

iESM - Technical Support Processes Managing hazards Independent assessment Configuration management & records © TPD 2013

iESM - Team Support Processes Managing safety responsibilities Promoting a good safety culture Building & managing competence Working with suppliers Communicating and co-ordinating © TPD 2013

iESM - Summary Is advisory, not mandatory; Provides good practice guidance and will continue to reflect emerging good practice; Is applicable in an international market; Supports use of CENELEC standards and Common Safety Methods (CSM) for risk assessment, with practical, cost- effective advice; Assists in discharging legal & professional obligations; Is guided by a Working Group of practitioners and supporters. Is supported by training courses from TPD and Lloyd’s Register © TPD 2013

A final thought Absolute safety is not achievable in the real world and therefore success relies on two fundamentals: 1) good processes, and 2) good people; such that when there is a problem or failure in one, the railway can be sustained by the other. © TPD 2013