Unit 206: Domestic hot water systems

Slides:



Advertisements
Similar presentations
Domestic Hot and Cold Water Services
Advertisements

International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Central Heating (Pipework Only). Forced circulation through loop pipework only Central Heating – One pipe system Central Heating – Types of systems (Part.
Pre Sales Dept. HERCULES Solar 26 1 A Condensing floor-standing boilers with built-in solar circuit.
Welcome to Energy efficiency for gas-fired and oil-fired domestic heating and hot water systems Session A: Course introduction.
Customer Service – International dept. STAR 24 3 E.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Unit 206: Domestic hot water systems
Basic Refrigeration Cycle
Unit 206: Domestic hot water systems
Cold feed to hot water cylinder Sink Basin Bath Drain valve Stop valve WC cistern 100 litre (minimum storage cistern)
Proposed Modifications in Boiler Feed Tank By: D K Singhal
Unit 205: Cold water systems
Objective of the session.
Cooling As working temperatures rise, the strength of metals used reduces. This in turn will force manufacturers to use superior metals/alloys, which can.
Unit 206: Domestic hot water systems
Filling, purging and air removal
Boiler Mountings.
Unit 208: Central heating systems
Section 16.3 Using Heat.
Outcome 2 Materials used to install domestic central heating pipework Unit 208: Central heating systems.
Unit 206: Domestic hot water systems
Unit 205: Cold water systems
Unit 206: Domestic hot water systems
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
Skilled Trades 1201 Residential Plumbing.
Lesson One.
Presentation on Installation of a Domestic Cold Water Storage Cistern
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Hydronic Mechanical Controls
PLUMBING Presentation on Central Heating. Forced circulation through loop pipework only Central Heating – Types of systems (Part 1) - One pipe system.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Gas Furnace Planned Maintenance
Unit 208: Central heating systems
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
HVAC523 Basic Subsystems.
HYDRONIC HEATING AQUASTATS
Unit 208: Central heating systems
PLUMBING Presentation on Central Heating – Pump Position.
Presentation on Feed and Expansion Cistern. Central Heating At the end of this part you should be able to: Identify general system methods of feed and.
Outcome 1 (part 2) Types of domestic central heating systems installed in domestic dwellings Unit 208: Central heating systems.
Section 3 Using Heat.
1 HVAC122 - Gas Gas Valves. 2 Solenoid Gas Valves The solenoid gas valve is the simplest of all valves. This valve has an electrical magnetic coil which.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Greenhouse Management.  List the different types of heating systems used in a greenhouse.  Describe the advantages and disadvantages of each type of.
HOT WATER Understand and apply domestic hot water system installation and maintenance techniques.
Using Heat Part 2. Science Journal Entry 32 Explain the advantages and disadvantages of thermal expansion.
Unit 209: Drainage systems
“Beyond the loop layout”.  Jeremy Neven, C.B.C.O. ◦ Chief Building Official ◦ Plumber ◦ HVAC Designer ◦
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Outcome 1 (part 1) Types of domestic central heating systems installed in domestic dwellings Unit 208: Central heating systems.
Outcome 3 (part 1) Heat emitters and their components Unit 208: Central heating systems.
Outcome 4 Mechanical central heating controls Unit 208: Central heating systems.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Hot water Systems Heaters.
5508BESG Services and Utilities Lecture 2
Hot Water Systems Cylinders and Systems.
______________ Combustion Engine
Cisterns and Insulation
Common Requirements Taps and Valves.
NEW ARISTON STORAGE BOILERS March, 2009.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Presentation transcript:

Unit 206: Domestic hot water systems Outcome 1 (part 1) Types of domestic hot water systems

Types of systems Legislation The Water Regulations (1999) The Water Regulations Guide (WRAS) WRAS – Water Regulation Advisory Scheme Building Regulations Part G Directory of fittings (WRAS approved)

Types of systems BS6700 – Design, installation, testing and maintenance of domestic hot and cold water systems BS8000 pt15 – Workmanship on building sites (code of practice for hot and cold water services)

Types of systems Manufacturers’ instructions These will outline installation requirements, maintenance and servicing requirements and fault diagnosis, and list spare parts. They will also list commissioning details, such as flow rates and maximum temperatures for appliances. These must be followed at all times.

Types of systems

Types of systems Hot water: Water heated to a specific temperature for domestic use. Centralised: Water is heated and/or stored centrally in the building and is distributed from that point to all the hot water outlets. Localised: Water is heated and/or stored locally to one specific draw-off point area. Stored: A cylinder of water is heated to temperature before being distributed to the hot water outlets. Instantaneous: Water is heated on demand when hot water outlets are opened.

Types of systems Centralised – stored hot water This is commonly used in a domestic property and uses a hot water cylinder, centrally located in an airing cupboard, which is heated by a boiler (or immersion) and distributes the hot water through the pipework system. Centralised – instantaneous hot water This is commonly used in smaller domestic properties and uses a combination boiler, which heats water on demand and distributes the hot water through the pipework system.

Types of systems Centralised open vented indirect gravity system. This system is not installed today but is commonly found in older properties. The primary flow and return from the boiler relies on convection to transfer heat from the boiler to the cylinder.

Types of systems Centralised open vented indirect pumped primaries. This system is commonly installed today. The primary flow and return from the boiler transfers heat from the boiler to the cylinder by the use of a pump or circulator through the coil.

Types of systems The Feed & Expansion feeds the primary circuit – boiler, cylinder and F&E. The CWSC feeds the secondary circuit – hot water distribution.

Types of systems These systems require: Boiler Primary flow and return pipes Heat exchanger coil Hot water cylinder Cold water storage cylinder Feed and expansion cistern Open vent pipe Cold feed pipe Hot distribution pipe Make sure you can identify these components and describe their functions.

Types of systems Direct hot water cylinder using a boiler. In this system there is no heat exchanger coil in the cylinder. The boiler heats the water that directly comes out of the draw off points.

Types of systems Direct hot water cylinder using electric immersion heaters. In this system there is no heat exchanger coil, instead it uses two immersion heaters. They heat the water that directly comes out of the draw-off points.

Types of systems Open vented systems These systems are low pressure systems relying on the head height of the CWSC to give the system pressure. They also contain a vent pipe, from the hot water cylinder which terminates over the cold water storage cistern. This allows the system to run a atmospheric pressure. The vent also allows air out of the system when it is filled, and allows air in the system when it is drained down. The primary function of the vent is to act as a safety relief when the system is operational: Expansion and contraction on heating and cooling Overheating on control failure

Types of systems Open vented systems BS6700 recommends that the capacity of the CWSC feeding a hot water cylinder should be at least the capacity of the cylinder. If the CWSC feeds hot and cold, the minimum size is 230 litres. If the CWSC feeds just the hot system, the minimum size is 115 litres.

Types of systems Important points: Minimum size of vent pipe is 22mm No valve allowed on vent pipe Hot water distribution should rise slightly from the cylinder and should be at least 450mm long before the vent pipe connection (one pipe or parasitic circulation) Cold feed should be sized according to BS6700. It also allows for expansion when the cylinder is heated CWSC needs to be as high as possible for head pressure. Cold feed pipe only goes to the cylinder and has a DOV at the lowest point

As BS6700 states, no valves should be placed on the route of the vent pipe. If found, they need to be removed.

Types of systems Direct or indirect open vented system In a direct system the hot water cylinder does not have any form of heat exchanger or coil. In older systems the water was heated directly by the boiler; in more modern systems the water is heated by immersion heaters.

Types of systems Direct or indirect open vented system In an indirect system the hot water cylinder has an internal coil, which acts as the heat exchanger to heat the stored water. These cylinders normally have a back-up immersion.

Types of systems Cylinders Coil No coil (immersion) Chamber Indirect Direct Indirect double feed single feed

Types of systems The primary F&R pipework is normally 22mm unless it is from a solid fuel boiler, which would need 28mm pipework. Under part L the heat-up time Is now 25 minutes. High heat recovery cylinders will heat up in 10 minutes. Cylinder thermostat is positioned one-third of way up cylinder.

Types of systems Under BS6700: The minimum size of the open vent is 22mm The open vent should not have any valves on it There should be a minimum distance of 450mm from the exit of the cylinder to the open vent tee to stop one pipe circulation The primary function of the open vent is to act as a safety relief valve in case of overheating On the cold feed from the CWSC to the hot water cylinder, there should be a fullway gate valve installed The minimum size of the cold feed is 22mm

Types of systems Cylinder support When installed, cylinders should be placed on two pieces of wood or a purpose built vented stand, to prevent condensation forming on the base of the cylinder dome, thus affecting the floor.

Types of systems These systems are called double feed systems. There are two cisterns in the loft area: The larger CWSC feeds down to the hot water cylinder as hot water is drawn off The smaller F&E cistern feeds down to the primaries and tops them up with water as required