Www.cells.es 1/20 New magnetic test bench for measuring closed magnet structures J. Campmany, L. Ribó, C. Colldelram, L. Nikitina, F. Becheri, G. Cuní,

Slides:



Advertisements
Similar presentations
An Axtrusion Based Lathe
Advertisements

Christian-Doppler-Laboratory for performance-based optimization of flexible pavements Institute for Road Construction and Maintenance – Vienna University.
Simona Bettoni and Remo Maccaferri, CERN Wiggler modeling Double-helix like option.
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
SCU Measurements at LBNL
Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Chapter 16 Waves (I) What determines the tones of strings on a guitar?
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Simulations and measurements of the pre-isolator test set-up WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist November 9, 2010.
Design of a compact AFM scanner
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
S. Russenschuck, CLIC-Workshop, WP2-Pacman, R&D projects on rotating coil probe and stretched wire techniques for CLIC / PACMAN Stephan Russenschuck.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
LASER AND ADVANCES IN METROLOGY
Cavity support scheme options Thomas Jones 25/06/15.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
Ch.10 Elasticity & Oscillations Problems: 3, 4, 27, 29. Elastic deformation Hooke’s Law Simple Harmonic Motion (SHM) period & frequency of SHM (sections.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
Engineering Division 1 M321/M331 Mirror Switchyard Design Review Tom Miller
Status of Activities at CERN
Cavity support scheme options Thomas Jones 1. Introduction Both cavities will be supported by the fundamental power coupler and a number of blade flexures.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
LATHE VIBRATIONS ANALYSIS ON SURFACE ROUHHNESS OF MACHINED DETAILS LATHE VIBRATIONS ANALYSIS ON SURFACE ROUHHNESS OF MACHINED DETAILS * Gennady Aryassov,
URL: 12-1, Hisakata 2-chome, Tempaku-ku, Nagoya JAPAN (C)2001 Manufacturing Engineering Laboratory,
The MesoMill™ An Off-The-Shelf Small Milling Machine By Roger Cortesi MIT Precision Engineering Research Group.
10/2007 M.Taborelli, TS-MME M.Taborelli Structure fabrication: dimensional tolerances Contributions of : G.Arnau-Izquierdo, A.Cherif, D.Glaude, R.Leuxe,
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Two Layers SAS: Damping of Torsion Mode Feb. 5th, 2011 F2F Meeting Takanori Sekiguchi, Riccardo DeSalvo, Ryutaro Takahashi 1/8.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
Cavity support scheme options Thomas Jones 25/06/15 1.
STATIC AND MODAL BEHAVIOUR OF THE CLIC MAIN BEAM BPM SUPPORT M. Esposito, EN-MME The research leading to these results has received funding from the European.
Any regular vibrations or oscillations that repeat the same movement on either side of the equilibrium position and are a result of a restoring force Simple.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Pasquale Arpaia, University of Naples Federico II
In Vacuum Magnetic Field Measurement System for CPMU of HEPS-TF
UNIT-I SLOTTING MACHINES
TEST MODULE WG Cradles for CLIC module supporting system
Present status of the flux return yoke design
Laboratories in Annecy working on Vibration Stabilization
Stages for the SSW translation system for PACMAN
CRAB cavities Cryomodule review Tuner
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
LCLS Undulator Fiducialization
Interferometric measurements on mirrors
By Arsalan Jamialahmadi
SCU Next Phase Meeting July 8, 2014.
1/10 prototype support tube
Presentation transcript:

1/20 New magnetic test bench for measuring closed magnet structures J. Campmany, L. Ribó, C. Colldelram, L. Nikitina, F. Becheri, G. Cuní, J. Marcos, V. Massana, J. V. Gigante, X. Serra, A. Camps, J. Nicolàs, F. Rey, M. Llonch, J. Ladrera, J. Ferrer, K. Maimouni, D. Calderón

2/20 The challenge of «closed» structures Small gap magnets for low emitance rings H magnets In-vacuum undulators Cryoundulators Any structure that cannot be accessed lateraly

3/20 closed magnetic structures In-vacuum undulators Superconducting magnets Superconducting undulators Low emmittance rings: MAX IV magnets (15 mm aperture) CLIC magnets (10 mm aperture)

4/20 Small and compact 3D Hall probe –13.9 mm Wide, 4 mm High, 100 mm long –Temperature measured with accuracy ±0.01º C –3 Bell sensors assembled ortogonally Fixed on a carbon fiber tape. The tape can be attached and deattached and be introduced inside any closed structure with entrance and exit openings Alignment is achieved using a reference magnet (horizontality) and a cone reference system (positioning) Whole sistem running into a squared tube acting as anti- chamber or anti-cryostat that can be introduced into a vacuum chamber through the final flanges, allowing Hall probe measurements of cold structures at warm temperature our proposal

5/20 concept

6/20 Dimensions: 13 x 25 x 2 mm Weigth: 0.75 g F.W. Bell Hall sensors, Model GH-700 The probe Flexible flat cable fixed on stretched tape

7/20 4 Hall sensor attached on a tape tensioned on a C shaped arc structure The tape is passing through the closed magnetic structure The arc is moved by a high accuracy motion stage Key points Can this arc be moved with an accuracy similar to that of a machining tool? -> stiffness of «C» structure How much space will we need it? -> measurement range x 3 Is the tape stable after being tensioned? -> vibration studies L Hallsensor L/2 2 Arc length 2l L/2 2 Length needed for the measurement is 3L TT Y X The bench

8/20 Field sentitivity ~10 -4 T Spatial repetitivity ~10 -6 m Measurement range: 3 m longitudinal (for prototype, 1.2 m), 0.25 m horizontal, and 0.1 m vertical Longitudinal scans allowing vertical and horizontal positioning (3D movement) Small guidance error on positioning the Hall probe (~ 50·10 -6 m) Very small angular deviations when moving (~50·10 -6 rad) Requirements

9/20 5 Analytical validation A string under tension has a mode of vibration on the 1st harmonic depending on the vibrating length, the tension and the linear mass This vibration, if excited, has a clear impact on the accuracy of the Hall probe position Calculation L ~ 4 m Tape cross-section: 24 x 1.4 mm 2 Material: pultruded carbon fiber, with density d=1600 kg/m 3 Elastic limit: 2800 MPa T = 7.5 kN -> f = 55 Hz -> stress = 224 MPa At ALBA, environmental low frequencies are considered < 30 Hz So, this value is taken as reference when designing

10/20 6 Evaluate fundamental frequency modes of a tensioned tape with the same cross-section as calculated Experimental set-up: tensioned belt with interferometer External excitation has been externally induced The set-up can measure the oscillation amplitude as well as the vibrating frequencies Empirical validation Iris Inerferometer Carbonfiber tape Result: Frequencies at 55 and 165 Hz Amplitude < 5·10 -7 m Test OK: high frequency and low amplitude

11/20  X,  Y,  Z < 0.05 mm Longitudinal POSITIONING ERROR Roll  Pitch  < 50·10 -6 rad Yaw  < 100·10 -6 rad Angular POSITIONING ERROR X, Y, Z = 30·10 -6 m Repeatability X : ± 0.25 m Z : ± 0.10 m Y : ± 1.20 m Chamber allowance (beam stay clear area) = 0.6 m Ranges Y’ = 15 mm/s Speed XYstage Z Arcstructure withcarbonfiber tape Detailed design PROTOTYPING

12/20 Dimensions Side View Top View (+125) 600

13/20 X,Y stage Structure: Al profile Stretching blocks, one with load cell gauge Mass: ~ 400 kg Tape cross-section 16 x 1,4 mm 2 Vibrating length: 2.6 m Density d = 1600 Kg / m 3 Pulling force: 0.5 N Belt dimensioning Results Arc structure Stress = 223 MPa Security factor = 13 f 0 = 71 Hz Elongation: m Double flexure system on a granite block Compact design: with a single step Z & pitch Allowing 100 mm Z range and tilt about 0.2º Flexures on high Young modulus material Preloaded guiding system and grinded spindles Movement for each flexure is encoded Mass of assembly ~1200 kg Z stage X stage has 2 actuators to avoid rotation on vertical axis Y stage measurement axis: placed on a granite block Preloaded roller and matched guides, which separation determine vertical accuracy Mass of the XY stage ~5000 kg

14/20 FEA calculation

15/20 Verification of parts with alignment and metrology group Big granite block is aligned flat with respect to the floor Interface plate fitted in top. Slots for guides have been checked Plate grinding has been corrected several times Very accurate alignment of linear guide sets Assembly XY stage Z stage Hollowed granite placed on top of XY stage Motors have been tested Arc structure Stretching system Carbon fiber is cutted by water All motors of the assembly have been tested «C» structure and stretching system have been assembled in parallel Carbon fiber is stretched up to 10 kN

16/20 Prototype characterization Straightness of Y displacement Straightness of Z displacement Straightness errors Peak to peak < 20·10 -6 m Guidance errors Yaw errors < 10·10 -6 rad

17/20 Roll rugosity error < 5·10 -6 rad Roll drift error < 50·10 -6 rad

18/20 Vibration static > 50 Hz

19/20 Conclusions Next steps Integration of Hall sensor in the bench Positioning error on Hall probe in X, Y, Z in all range Repetitivity positioning error on Hall probe in X, Y, Z Guidance error: straightness, flatness, pitch, yaw and roll errors measured on Hall probe Roll angle: measurements of repetitivity, hysteresis and evolution Vibration frequencies for the final assembly Main granite deformations with Z stage movements After measurements done, specifications fulfillment is almost guaranteed Bench can work for very narrow gap closed structures as well as conventional Main drawback is the long longitudinal space needed as operational range If the prototype suceeds, a 3 m range bench (9 m total lenght) can be foreseen

20/20 Thanks for your attention!