AeroMACS SARPS Validation Report from SESAR Project 9.16 Sixth Meeting of the Surface Datalink Working Group Sendai, November 13 th -14 th, 2014 Domenico.

Slides:



Advertisements
Similar presentations
Future Communications Infrastructure – An update
Advertisements

P AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013.
19/09/2007 Belfast, AIAA Conference SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
ICAO ACP WG S meeting 14th, 15th July 2014
© Hitachi, Ltd All rights reserved. ICAO ACP WG-S Hitachi Ltd., 2014/3/28 SARPS Validation Discussion material on Web-EX 1 IP01 ACP WG S_28 Mar.
GAMMA Overview. Key Data Grant Agreement n° Starting date: 1 st September 2013 Duration: 48 months (end date 31 st August 2017) Total Budget:
HORIZONT 1 ProcMan ® The Handover Process Manager Product Presentation HORIZONT Software for Datacenters Garmischer Str. 8 D München Tel ++49(0)89.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Procurement Processes SAP Implementation
Dm+d User Guide Information Standards Delivery 1.
Workshop - November Toulouse Ronan LUCAS - Magillem Design Services 07/04/2011.
The Preparatory Phase Proposal a first draft to be discussed.
Ron Kratzke, Vitech Corporation MBSE for System Testing Managing the development of system testing using the principles of Model.
November 27, 2007Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
ENTERING ELIGIBLE ENERGY RESOURCE APPLICATIONS IN DELAFILE Version 2.0 August 25, 2015.
09/12/2009 SWIM-SUIT User Forum, Rome SWIM-SUIT Project Overview Giuliano d’Auria SELEX Sistemi Integrati Project Coordinator.
© DeHiGate Consortium DeHiGate – Deployable High Capacity Gateway for Emergency Services DeHiGate (CELTIC No: CP02-008) WP1 Status Pekka Parviainen TKK.
SIXTH FRAMEWORK PROGRAMME FP INCO-MPC-1 MEditerranean Development of Innovative Technologies for integrAted waTer managEment.
Agenda Process Flow Design and Platform Configuration
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
1 Thomas HottTechnical Reviews Contents, 2 nd CDE-WS, 12 th & 13 th May 09 XFEL Technical Coordinator Technical Reviews – Contents – 1.
21-06-xxxx IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: The amendment for the MIH_Scan primitive Date Submitted: April,
Enterprise Architecture The EA 3 view Copyright © 2013 Curt Hill.
Software Testing. Software testing is the execution of software with test data from the problem domain. Software testing is the execution of software.
1 Airport mobiles surveillance and control by means of EGNOS METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18 November 2009 Pierre GRUYER.
Airbus Status on ADS-B In / Out Update
Access Tutorial 7 Web Integration. Overview Note: We’re only doing Session 7.1 (page AC ) and Session 8.1 and 8.2 Hand-in for lab 7: Tutorial.
AMP CAR RESERVATION SYSTEM INVERS Reservation System Upgrade Doug Erwin | 6/22/2015.
1 reTHINK Deliverables, How To Read reThink deliverables quick starter.
A ERODROME T RAINING C OURSE Course Description. C OURSE O BJECTIVE This course conducted over 1 day is for airport operational, technical and management.
November 17, 2008Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
Project monitoring Official visit of the Grant Agency on Strengths of the project: professional results, progress compliance with work plan.
Taking stock and next steps CCWG F2F, 23 March 2015.
Car Sharing A Brief Overview Sascha Schmeling ● PH Department.
Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Overview Instituto Pedro Nunes Co-Living 12/3/ Paulo Freitas - Instituto.
Lesson 15: Cache Transfers Processing Cache to Cache Transfers.
BA6 newsRF power Cable list being worked out. BA6 newsLLRF Cable list done, pending check and confirmation.
All rights, including translation, reserved. No part of this document may be disclosed to any third party, for purposes other than the original, without.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
ACC 220 Week 1 Checkpoint Career Opportunities CheckPoint: Career Opportunities Visit the U.S. Department of Labor, Bureau of Labor Statistics at
AeroMACS Status SESAR Project Airbus update
Validation items and major Conditions
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Strength Through Science
Architecture and institutional issues for AeroMACS
Sub-group on Process Efficiency 2nd meeting, 14 Jan 2009 Frankfurt am Main T2S Project Team European Central Bank.
Overview Encounter Template Encounter Chart Item Templates Chart Items
AIXM 5.1 – Interoperability issues
WG-I #16 Meeting SESAR Security Tasks
Overview of Asset Strategy and Maintenance Plan Development
Future Communications Infrastructure – An update
For Web Application Security Projects.
PROJECT TITLE YOUR LOGO YOUR COMPANY NAME EXECUTIVE SUMMARY
IWW12 recommendations What are AMVs?
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
AeroMACS SARPS Validation Report from SESAR Project 9.16
Ag.no.16 A65 country manuals and country assessments
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
Presenter’s Name and Title Department Date of Presentation
Signal Conditioning.
IMT-Advanced Technical Requirements
Test Process “V” Diagram
P AIRPORT SURFACE DATALINK
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
PROJECT TITLE YOUR LOGO YOUR COMPANY NAME EXECUTIVE SUMMARY
PROJECT TITLE YOUR LOGO YOUR COMPANY NAME EXECUTIVE SUMMARY
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
Presentation transcript:

AeroMACS SARPS Validation Report from SESAR Project 9.16 Sixth Meeting of the Surface Datalink Working Group Sendai, November 13 th -14 th, 2014 Domenico Cardamone Avionics LoB CTO/Capability Department

2 © 2014 Selex ES S.p.A. – All rights reserved SESAR WP 9.16 Test Strategy

3 © 2014 Selex ES S.p.A. – All rights reserved AeroMACS SARPS Validation Report from SESAR WP 9.16 Contents This document presents a subset of the Validation and Verification results from the project SESAR These results contribute to the validation of the AeroMACS SARPS. SESAR 9.16 Project Overview Airbus & Selex ES & Test Benchs Description Selex ES AeroMACS MS/BS prototype description Summary of the Lab Test performed by Selex ES Summary of the Test performed by Airbus Validation Items and Results Summary Lists of AeroMACS SARPs Requirements and validation results Selex ES Tests Details Report Lab Test Reports Airbus Tests Details Report Lab Tests Report Car Tests Report A/C Tests Report

4 © 2014 Selex ES S.p.A. – All rights reserved AeroMACS SARPS Validation Report from SESAR WP 9.16 Main Results Selex ES Lab Test Report are OK (STEP 1) Selex ES has to test data transfer with Security and Handover with data transfer Airbus Test Lab Test Report are generally OK, remarks about a high PLR not confirmed during the static test field Airbus Test Lab Test Report has no report for data transfer with security (STEP2) Airbus static field test about RTT/Jitter/UDP-TCP Throughput are OK Airbus Car Test were limited by the limited signal coverage over the Airport, so mobility tests (doppler, handover and throughput) were not possible all over the airport surface (STEP3) Airbus A/C tests about AeroMACS integration on board are OK (STEP 4) Airbus A/C mobility test yet to be done.