AIM Program Software Status

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

Review of AIM I/II Change Requests (ACRs) 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
Sharpdesk Overview Desktop Composer Search Imaging      
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
Authoring Instructional Materials (AIM) Roadmap
NSW AIM FRB Utilization Discussion Karen Pohl Curriculum Systems Director Naval Special Warfare Center 4-6 November, 2009 Orlando, FL 1.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
I-Suite Update Version 13 I-Suite General Focus Development – Minimal changes to current I-Suite – Primary Focus is e-Isuite Supporting Multiple.
AIM FRB Briefing NAVSEA 07TR3 Sandra Wiegmann Submarine Training Systems Division NAVSEA 07TR3 4 Nov 2008.
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
A look at the NETC End-to-End (E2E) Process using the Content Planning Module (CPM) / Learning Object (LO) Module.
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Maintaining and Updating Windows Server 2008
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
Customer Forum OTech’s New Web Publishing Service Web Services Section – April 29, 2015.
1. Report status of traditional and modernized AIM
Creating a MagicInfo Pro Screen Template
NETC N6 Status Update to AIM FRB 18 Sep 12 Bruce Bare, NETC, N62 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
NAVSEA Philadelphia Code 94 NAVSEA Philadelphia Code 94 Integrated Logistics & Fleet Maintenance Department Implementation at NAVSEA Philadelphia.
The FlexTraining Total E-Learning Solution
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
PowerPoint 2003 – Level 1 Computer Concepts Cathy Horwitz April 25, 2011.
Class Instructor Name Date. Classroom Tips Class Roster – Please Sign In Class Roster – Please Sign In Internet Usage Internet Usage –Breaks and Lunch.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
1 What’s the difference between DocuShare 3.1 and 4.0?
10/18/2015 NORTEL NETWORKS CONFIDENTIAL – FOR TRAINING PURPOSES ONLY Global Documentation Evolution System Overview and End-to-End Process Training.
AIM/CPM Briefing & Demo 4 November 2009 Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD.
© 2008 Map of Medicine Ltd. Commercial and in confidence. Training Foundation Module 2 – Map Management Suite Ver. 19 Jan 2011.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
What’s new in Kentico CMS 5.0 Michal Neuwirth Product Manager Kentico Software.
My Workspace ELearning in Sakai Randy Graff, PhD HSC Training.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
Center for Personal and Professional Development Harrison-Youngs/ Bartholomew ISD CPPD 4 November 2008.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
May 6, 2015 Session 10:00am – 12 Noon. Agenda 2 TopicPresenter / FacilitatorTimeframe  Welcome Michael Chen5 min.  CA Web Publishing Richard Lehman55.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
AIM ACR Prioritization AIM ACR Prioritization 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Ron Zinnato, AIM Lead Engineer Jamie Stewart, AIM Lead ISD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Condor Technology Solutions, Inc. Grace Performance Chemicals HRIS Intranet Project.
ALA Annual Meeting Claire Cocco Global Product Manager CONTENTdm Users Group June 30th, 2008.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Maintaining and Updating Windows Server 2008 Lesson 8.
Using PCM Virtual Class
Increased Efficiency and Effectiveness
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

AIM Program Software Status In-process means planned and funded.

AIM Program Software Includes: AIM I AIM II AIM Learning Object Module Content Planning Module In-process means planned and funded.

AIM Training Traditional “Buttonology” Courses AIM I 2 FY 15 convenings, 1 on each coast AIM II 6 convenings CPM/LO Module 16 convenings In-process means planned and funded.

E2E Training Taught or expected to be taught at every learning center or fleet concentration area Approximately 50% of the convenings in the Hampton Roads area Distance Learning version of current E2E ILT course planned for facilitated asynchronous delivery via NETC N7 Sakai instance In-process means planned and funded.

E2E Training Training in support of the NETC E2E Process NAVEDTRAs NETC End-to-End Process SOP Three new topics in design: BCA – FEA in govt review R3 (Reuse, Repurpose, Reference) – integrated into the DL Videos, retrofitting into ILT course Reengineering – in JDTA currently In-process means planned and funded.

AIM Program Updates In-process means planned and funded.

AIM Update December 2014 Added support for multiple Volumes in LP Fixed summary display in the CMS Fixed issues with CMS Events for non-CCMM site Added support for multiple Volumes in LP Added support for adding distribution statements to the cover page of the TPP, TCCD, LP, TG In-process means planned and funded.

AIM Update December 2014 (contd) LP Preview automatically turns to PDF if over 2500 pages Changed the terminology from IMI (Interactive Media Instruction) to IMM (Instructional Media Material) Added "Save Source File As..." and a "Save As..." menu items to the Graphics module In-process means planned and funded.

AIM Update December 2014 (contd) Changed PC Simulation support in the Site RRL, moving it from a separate category to be a subset of IMM. Increased the field size for number and supplier fields. Fixed issue when printing the TG and the S/HAN contains section breaks In-process means planned and funded.

AIM Update December 2014 (contd) When editing sheet content, software should no longer hang if trying to edit a document that is blocked by Word 2010's security settings. Updated TPP functionality based on feedback from TPP Working Group Expanded performance assessment support In-process means planned and funded.

CPM Update 2nd QTR FY15 TPP updates from TPP Working Group OCCSTD import into JDTA Expanded Field Level Help in CPM Expanded PC Simulation in RRL In-process means planned and funded.

CPM Update 2nd QTR FY15 (contd) Multicenter Roles for CPM users Remedy printing, data import, and JDTA copy issues in CPM Correct Lesson length Change IMI to IMM In-process means planned and funded.

Future AIM / CPM Updates Improved Lesson Plan formatting Versioning – Create new versions of only those Modules/Lessons/Sections that actually need to be modified. Remaining content stays at its current approved version Course Master Schedule fixes Front End Analysis (FEA) Table of Specifications (TOS) In-process means planned and funded.

Future AIM / CPM Updates (contd) Track Access/Changes to data in AIM I/AIM II/LO Module Data Retention of CPM Data Versioning Resources / Data / KSATRs Portion Marking OCCSTD Versioning In-process means planned and funded.

LO Module Integration into CPM – ‘Webification’ Long-term NETC plan is to integrate LO Module functions into CPM as a fully web-based application In-process means planned and funded.

Phase 1 Core of LO Module creation in CPM delivered and accepted by govt Jan 14

Phase 2 Significant improvements in importing LO Module files, “filled in holes” from Phase 1 Approved FEB 15

Future Development Phase 3 (100% of desktop client functionality and operational replacement for LO Module desktop client): unfunded Schedule and required funding are TBD based on several factors, including: ECP to capture functional and technical design, scope cost, and determine schedule – especially editor and printing issues freeze of desktop client enhancements that will need to be incorporated into the Phase 3 version of webified LO Module

Issues Replace current Word editor for TG sheets with web-based editor and migrate existing Word-based TG Sheets into new editor Identify, test, and implement new print engine Work with NETC N6 to scope server requirements and network bandwidth to support far greater user and data load on CPM than current Plan, Analyze, and Design phases of ISD process In-process means planned and funded.

Next Steps Start work by ‘Webification’ Working Group chartered by NETC N74 in Dec 14 Define functional requirements for the ECP analysis, functional/technical design, costing, and schedule Begin analysis and design of NETC IT architecture to support implementation of integrated Web-based CPM/LO Module – especially new SSC NOLA configuration N7/FRB/CCB determine when to freeze enhancements to desktop client LO Module Task/fund ECP for Phase 3 ‘webification’ In-process means planned and funded.

AIM Support Currently handled by NAWCTSD, with contractor support Planning for eventual transition to REMEDY, with appropriate planning and implementation