OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop.
ROLE OF RPS CALCULATOR IN >33% RPS STATEWIDE TRANSMISSION PLANNING? 1.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Capacity Valuation.
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
The Green Rush Implementing Renewables in California Dave Ashuckian, P.E. Deputy Director Division Of Ratepayer Advocates Power Association of Northern.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Renewable Net Short.
California Energy Commission Draft Rate Scenario Model Methodology DAWG Forecasting Subgroup Sept. 11, 2014 Lynn Marshall Supply Analysis.
IOU LEAST COST-BEST FIT (LCBF): ALIGN WITH RPS CALCULATOR? 1.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
TRANSMISSION COSTS. Summary  The availability and cost of transmission are primary components in the Net Market Value (NMV) calculation used to rank.
Update on the 2015 Special Study June 29, 2015 Arne Olson, Partner Nick Schlag, Managing Consultant Gabe Kwok, Senior Consultant.
1 CPUC Responsibilities for Renewable and Energy Efficiency Resource Commitments by Investor-Owned Utilities and Ratepayers Hearing on Public Goods Charge.
Cost-Effectiveness and Solar Water Heating. 2 Why is it important to discuss cost- effectiveness (C-E) of SWH? C-E is a metric by which the CPUC will.
Implementing one of the most ambitious renewable energy standards in the country California’s Renewable Energy Programs Implementing one of the most ambitious.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
California Energy Commission Renewable Energy in California Rasa Keanini and Heather Raitt Renewable Energy Program Efficiency, Renewables & Demand Analysis.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
RPS Model Methodology Arne Olson, Partner Doug Allen, Consultant.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
1 Introduction, scope, context Terminology, high-level approach Methodology, Inputs, Assumptions –Portfolio development –Discounted core –Environmental.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
California’s Renewable Energy Credits (REC) Market Update
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
California Energy Commission California Energy Demand Preliminary Electricity Forecast July 7, 2015 Chris Kavalec Energy Assessments Division.
1 Energy Division Workshops: LTPP Planning Standards (Part 1) & Procurement Rulebook June 11, 2010 Workshop R , Tracks 1, 2, & 3.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
1 Combined Heat and Power (CHP) Settlement Overview Power Association of Northern California Luncheon, November 9, 2010 Frank Lindh General Counsel California.
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
SOUTHERN CALIFORNIA EDISON SM REC cost estimation April 23, 2010 Eric Lavik.
1 Long-term Renewables Planning Methodology, Inputs and Assumptions for the 2010 Long-Term Procurement Plan Proceeding California Public Utilities Commission.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
Integrating Land Conservation and Renewable Energy Goals in California: A Study of Costs and Impacts Using the Optimal Renewable Energy Build-Out (ORB)
2010 Long-Term Procurement Plan 33% RPS Calculator Training California Public Utilities Commission January 7, 2011.
Utility Procurement: What’s Next? IEP 2015 Annual Conference
. PANC Annual Conference May 16, 2012 Progress on the California RPS.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
Experience you can trust. Californial Industrial Energy Efficiency Potential CALMAC/MAESTRO Meeting San Francisco, CA July 27, 2006 Fred Coito
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
RETI Workshop March 16, 2015 Arne Olson, Partner Lakshmi Alagappan, Sr. Managing Consultant Identifying High Value Renewable Resources.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
1 PG&E Proposals for Refinements to the Resource Adequacy (RA) Program Compliance Year 2017 RA Workshop February 18, 2016.
1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
Renewable & Alternative Power Implementation of the California Renewables Portfolio Standard February 6, 2007 Senate Energy, Utilities, and Communications.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection.
LNBA Subgroup: Avoided Transmission Value
Mike Jaske California Energy Commission
Preliminary Electricity Rate and Time of Use Rate Scenarios
California Energy Demand (CED) IEPR Forecast:
SDG&E Procurement Perspective IEPA 35th Annual Meeting September 21st, 2016 Dan Skopec Vice President, Regulatory Affairs Sempra Energy Utilities.
Scenario Scoping Process
Resource Adequacy Demand Forecast Coincidence Adjustments
Introduction to Growth Scenario Working Group
California Transportation Electrification Activities
Presentation transcript:

OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1

Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate planning efforts under future RPS goals Three types of projects are included in the portfolios: – Existing: resources currently in operations – Commercial: planned resources under contract to utilities that have not yet come online – Generic: possible future renewable projects identified through an assessment of statewide renewable potential The RPS Calculator selects generic projects to fill the renewable net short: the difference between the utilities’ compliance obligation and existing/commercial resources 2

Renewable Valuation Module LCOE Transmission Cost Energy Value Capacity Value Curtailment Cost Integration Cost Model Flow Chart 3 Renewable Resource Assessment Biogas Biomass Geothermal Solar PV Solar Thermal Wind RNS Calculation Load forecast Policy assumption Existing projects Commercial projects Renewable Supply Curve Generic projects, ranked by net cost Renewable Portfolio Existing projects Commercial projects Generic projects

Developing a Cost-Based Supply Curve Framework used to develop order of resources in the supply curve closely mirrors Net Market Value calculation used in Least Cost, Best Fit – Intended to capture all cost impacts on utility ratepayers Net resource cost is calculated for all possible generic resources in the model to enable the choice of the least cost resources for the portfolio RPS Calculator Valuation Framework Levelized Cost of Energy Transmission Cost Capacity Value Energy Value Net Resource Cost Integration Cost* − = − Curtailment Cost + 4

Dynamic Valuation Cost & value of renewable generation changes over time due to: – Technological innovation – Financing and tax policies – Portfolio saturation effects – Avoided costs of energy & capacity Unlike prior versions of the RPS Calculator, v.6.0 considers how each of these factors will impact the supply curve of renewables over time 5 Charts are generic and are shown for illustrative purposes

In each year, least-cost resources are selected from the supply curve to fill the renewable net short Resource Selection Supply Curve Renewable Portfolio Least Cost Most Cost Least-Cost Resources Added in First Year RPS Obligation RNS 6

The order of resources in the supply curve adjusts each year as a function of the changing resource mix in the portfolio Iterative Framework Supply Curve Renewable Portfolio Least Cost Most Cost Least-Cost Resources Added in First Year RPS Obligation RNS Added in Second Year 7

Model Control User may select a number of inputs to specify preferences for portfolio development: – RPS policy – In-state/OOS availability – Load forecast – Deliverability type (v.6.1) – Land use exclusions (v.6.1) – Analysis horizon Functionality to save and re- load model runs will be integrated in v Main Model Controls

Illustrative Model Results Model identifies locations and types of resources that can be used to meet RPS policy goals Portfolios developed to achieve compliance in each year of analysis horizon Generic Resources Selected by SuperCREZ Aggregate Renewable Portfolio 9

RENEWABLE NET SHORT 10

Updates to RNS Methodology RNS methodology has been updated for the following purposes: – Eliminate the practice of “discounting” individual projects; all projects with CPUC-approved PPAs now included in portfolio – Use a contractual, rather than physical, accounting in order to better align with IOU procurement – Align with geographic scope used in CAISO TPP – Incorporate system-wide failure rates consistent with current IOU practice – Incorporate year-by-year RNS calculations – Allow for consideration of banked credits in the assessment of need for compliance 11

The Renewable Net Short (RNS) calculation has been revised to better reflect the RNS calculated for RPS procurement Version 6.0  “Net Short” is the difference between the compliance requirement and risk-adjusted generation from all procurement, inclusive of both projects online and in development  Forecast generation from projects in development is adjusted for the risk of project failure Version 6.0  “Net Short” is the difference between the compliance requirement and risk-adjusted generation from all procurement, inclusive of both projects online and in development  Forecast generation from projects in development is adjusted for the risk of project failure Versions  “Net Short” is the difference between the IOU’s RPS compliance requirement and generation from online RPS resources  The “Discounted Core” is a subset of future projects that fill a fraction of the net short Versions  “Net Short” is the difference between the IOU’s RPS compliance requirement and generation from online RPS resources  The “Discounted Core” is a subset of future projects that fill a fraction of the net short Update to Calculation of the RNS Net Short 12

Prior versions of the RPS Calculator specified a subset of commercial projects as a “discounted core” Resource bundling & selection logic in the prior calculator had the potential to create “transmission orphans”: projects deemed by the CPUC to be in the public interest but excluded from portfolios modeled by CAISO in the TPP, creating an obstacle in their development Creation of Transmission Orphans in RPS Calculator v CREZ “Transmission Orphans” in Prior Versions O O O O X X X X Load X Alterative #1: “All” Alterative #2: “Nothing” Transmission Orphan Discounted Core Generic Project 13

Avoiding Transmission Orphans In RPS Calculator v.6.0, the threshold for inclusion in the portfolio has been changed: all projects with a CPUC- approved contract are included in the portfolio This choice prevents the RPS Calculator from acting as an obstacle to project development through exclusion from the TPP’s policy-preferred portfolio This choice reemphasizes the importance of the Least-Cost, Best-Fit and the CPUC approval processes to identify and select resources appropriate for development 14

CALIFORNIA Geographic Scope Geographic scope of RPS Calculator has been altered from the state as a whole to the CAISO to better align with planning processes in which it is used (LTPP, TPP) CAISO PG&E SCE SDG&E BANC Embedded Munis Munis LADWP Munis CALIFORNIA CAISO PG&E SCE SDG&E BANC Embedded Munis Munis LADWP Munis Version 2.0 – 5.0 Geographic Scope TIDC IID Version 6.0 Geographic Scope 15