Stability of Mechanical Systems S. Sharma and V. Ravindranath.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Test readiness review ESA ’s prototype BLANC P-E LAMLyon October 2003 Mechanical test plan.
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Mechanical Engineering Issues Sushil Sharma, NSLS-II Project The NSLS-II storage ring requires multipoles and.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Ramila Amirikas, Alessandro Bertolini, Jürgen Eschke,
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
LISA STUDIES AT THE UNIVERSITY OF COLORADO Michael J. Nickerson, Ellery B. Ames, John L. Hall, and Peter L. Bender JILA, University of Colorado and NIST,
Alignment and Beam Stability
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
Effective lens aperture Deff
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
SR Vacuum Systems and Front Ends
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
Cavity support scheme options Thomas Jones 25/06/15.
1 BROOKHAVEN SCIENCE ASSOCIATES S.Sharma 10/11/2006 NSLS-II Mechanical Subsystems Accelerator Systems Advisory Committee Review October 10-11, 2006 Sushil.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
MERLIN BEAMLINE RIXS refocusing mirror system D. Yegian
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review – May 11, 2007 S. Sharma NSLS-II Frontends and Canted Wigglers Options Sushil Sharma.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES S. Sharma ASAC July 17-18, 2008 Support System and Alignment Sushil Sharma ME Group Leader ASAC Review of NSLS-II July.
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
Pre-isolator & QD0 support modeling 5th WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist September 7, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.
Cavity support scheme options Thomas Jones 1. Introduction Both cavities will be supported by the fundamental power coupler and a number of blade flexures.
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Cavity support scheme options Thomas Jones 25/06/15 1.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II ASAC Meeting April 23, 2007 S. Krinsky.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Super-B Vibration Tolerances
Stress and cool-down analysis of the cryomodule
Orbit Control For Diamond Light Source
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
CLIC Common RF-girder study
Lecture 22: Temperature and Thermal Expansion
Laboratories in Annecy working on Vibration Stabilization
Crab Cavity support system update
Experimental program for module array
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Summary of Session 5 Other Vibration Source
Thermal Environment & Mechanical Support
Progress and plans, Mechanics system of CEPC
Fixed Support Design & Testing
Physics Requirements for Conventional Facilities
Presentation transcript:

Stability of Mechanical Systems S. Sharma and V. Ravindranath

Stability of Mechanical Systems Stability: Thermal Vibration Systems: Girder-magnets assembly Vacuum chambers (BPMs) Stands for special BPMs An NSLS-II Girder, Magnets, Vacuum Chamber Assembly APS X-BPM Assembly with Support Stand

Tolerance LimitsΔX RMS QuadsΔY RMS Quads Random magnet motion< 0.15 μm< μm Random girder motion<0.6 μm< 0.07 μm Tolerances on Magnets’ Motion  ΔX Tolerance limits are easily achievable.  ΔY Tolerance limits:  Thermal: relative thermal displacement between magnets on the same girder: < μm. (RMS thermal displacement of girders over a pentant (6 cells) < 0.1 μm)  Vibration: no magnification of ambient floor motion up to 50 Hz. Below 4 Hz girder motions are highly correlated Above 50 Hz the rms floor motion is < μm

Tolerances on BPMs BPMs mounted on vacuum chambers: ± 0.2 μm (vertical) User BPMs (upstream and downstream of IDs) : ± 0.1 μm (vertical) X-BPMs: ± 0.1 μm (vertical) BPMs in a Typical Cell

Fluctuations in the tunnel air and chamber water temperatures Air Temperature Chamber cooling water temperature Stability of Tunnel Air and Cooling Water Temperatures Tunnel air: ± 0.1 ºC Cooling water: ± 0.05 ºC

FE Thermal Analysis  The girder is insulated by 2” thick mineral wool insulation except on the top surface.  Stainless steel plates supporting the chamber are insulated with 1” thick insulation. Max. ΔT in girder: ~0.01 ºC Avg. ΔT in SS plates : ~0.02 ºC

Thermal Deformations Magnets: Relative displacement on a girder: 0.01 μm Average displacement of girders over a pentant: 0.09 μm Vacuum Chamber: Near fixed and flexible supports (SS plates): 0.2 μm Maximum: 1.2 μm Chamber deformations near the supports are ~ 0.15 μm with Invar plates. BPMs need to be located near the fixed or flexible supports.

Thermal Deformations in the Support Stands for Special BPMs Thermally Insulated Steel Stand

FE Thermal Analysis Temperature rise in the thermally insulated, sand-filled steel stand is limited to ºC

Thermal Deformations – Steel Support Stand Maximum thermal deformation (expansion/contraction) is limited to μm as compared to the tolerance of 0.1 μm.

Displacement PSDs at locations near the NSLS-II site (Source: N. Simos) RMS Displacements at CFN ( 0.5-4) Hz : 200 nm (4-50) Hz : 20 nm (50-100) Hz : 0.4 nm Ambient Floor Motion

Design Approach Stiff girder-magnets assemblies  1 st natural frequency > 50 Hz  Low profile girders mounted directly on the floor  Simple alignment mechanisms for the girders and the magnets

Natural modes of vibration for the girder-magnets assembly: (a) rolling mode = 63 Hz, (b) twisting mode = 79 Hz RMS (2-50) Hz Displacements: Floor: 20 nm Magnets: 21 nm (b) (a) Mode Shapes of the Girder-Magnets Assembly

Summary and Conclusions  Specifications on temperature stability and ambient floor motion are reasonable and necessary.  Proposed designs of the girder, magnets and vacuum chamber assemblies will be able to meet the specifications on mechanical stability.  BPMs on the vacuum chambers need to be located near the fixed or flexible supports.  Thermally insulated, sand-filled steel stands will meet the mechanical stability requirements for the special BPMs.