The Legacy of the ACCSEAS project Pieter Paap NL Ministry of Infrastructure and the Environment 3 rd Annual ACCSEAS Conference February 2015
Organizational Legacy Substantial Legacy Material Legacy
Organizational Legacy Need for o Coordination and cooperation e-Navigation NSR Harmonized and standardized implementation e-navigation Policy decisions to be taken Service Providers attunement Coherency and harmonized services Ongoing stakeholders consultation Dissemination of progress o Organizational structure Links to other utilization fora
Organizational Legacy Building on the organizational structure of ACCSEAS
Organizational Legacy Building on the organizational structure of ACCSEAS Historic successful example NRC/GMDSS
NSR e-Navigation Coordination Platform NSR-SPCG NSR-PHG NSR-e-Navigation User Forum Biennial NSR Conference Organizing Committee OSPAR EU North Sea Commission Establishment of a NSR e-Navigation Platform Prepatory meeting to be initiated by 1 or more administrations Draft ToRs ready and available Approach endorsed by ACCSEAS Steering Committee
Substantial Legacy Results WP3 Results WP3 Research Identification Study Recent and future developments challenges and Candidate e-navigation solutions Categorized overview of the ACCSEAS GIS ACCSEAS GIS NSR Passage Line Statistics Passage Line Statistics Risk Analysis
Results WP4 (1) Results WP4 (1) Substantial Legacy Mapping ACCSEAS potential solutions to IMO eNav Architecture “Tasks” of Draft IMO SIP (Sub)Solutions IMO SIP 7-Pillar Model No-Go Area Service Tactical Route Exchange Service Maritime Cloud Multi Source Positioning Service MSPs for the NSR Dynamic Predictor MSI/NM Service Route Topology Model Automated FAL Reporting Augmented Reality HUDs VOCT Real time warning system based on historical AIS targets behaviour Harmon. Data Exch. (IVEF) EU “e-Maritime” EU “Motorways of the Seas” EU “INSPIRE” ACCSEAS potential solutions Design e-Navigation architecture ship/shore services
Results WP4 (2) Results WP4 (2) Substantial Legacy Operational/technical Architectures for ACCSEAS potential solutions Conclusions / Recommendations from an e-Navigation architectural perspective for the NSR Conclusions / Recommendations from an e-Navigation architectural perspective for the NSR Design Techniques System engineering techniques Simulation architectures Use of Simulators in e-Navigation Training and Demonstration e-Navigation Training Needs Analysis e-Navigation Training Needs Analysis
Results WP5 Results WP5 Substantial Legacy Ship Positioning Multi Source Positioning Service Prototype Multi-Source PNT Receiver PNT Data Processing Software Tests hard & software for Resilient PNT Absolute Radar Positioning Trial R-Mode using MF DGPS Transmissions R-Mode using AIS Transmissions Report Feasibility Study Test bed R-Mode MF DGPS Prototype MF-DGPS R-Mode transmitting site Prototype MF-DGPS R-Mode transmitting site
Substantial Legacy Results WP6 Results WP6 14 candidate e-navigation solutions System descriptions Test scenario’s Prototypes Hard- & Software Identified future work Test results Test Reports
Substantial Legacy Future Work Future Work Candidate e-navigation solutions Continu development and completion of these solutions Continu development and completion of these solutions Finalize prioritization for implemention Set the organizational and technical conditions for harmonized implementation Determine and arrange governance and liability issues Implement candidate e-navigation solutions
Substantial Legacy Results WP7 Results WP7 Demonstrators Simulators Proved usability Hard- & Software Movies Training scenario's Test scenario’s Manuals
Future Work Future Work Material Preservation of GIS for future use In NSR Organize maintenance Organize maintenance Solve legal constraints Ensure AIS delivery Organize governance Organize governance Organization Organize preparatory meeting Establish North Sea e-Navigation Coordination Platform Substantial Execution identified actions Related follow-up projects Contributions to new/other projects Continuing ACCSEAS work A sustainable future Workplan The source for Determine ownership Arrange future use
Will be finalized after project ends, to be published on the ACCSEAS website will be available until 1 year after project ends
Dissemination of Reports Dissemination of Reports Substantial Legacy ….. and other relevant NGOs/IGOs Any interested organization, stakeholders, industry e-Navigation.net Portal ( Letter of Attraction Availability on ACCSEAS website Availability on ACCSEAS website WP2 DG MOVE DG MARE Advice to relevant EU projects