Interfacing Building Automation Systems (BAS) to Process Control Presented by: Gordon MacLachlan (Mac)

Slides:



Advertisements
Similar presentations
1 The Leader in Industrial Data Communication Solutions Training: AB Application Interfacing.
Advertisements

DeviceNet 2400, 2500, 26/2700.
Nano-10 based Building Automation System (BAS) Jesús BaezMarch, 2011.
TOP Server V5.6 – Features and New Release Presenter: Kevin Rutherford Senior Applications Engineer.
POC Security System High security system combining PIN-on-Card, information security, physical access, control and alarm – all in one system.
TOP Server UCON: Integrating Your Non-Standard Devices Presenter: Kevin Rutherford, Senior Applications Engineer.
Advanced Access to Allen-Bradley Devices with VS.NET Win Worrall Applications/Development Engineer Renee Sikes Applications.
SlotServer Configuration
1 Hardy Process Solutions – New Product Introduction HI6600 Series – Modular Sensor System Hardy delivers productivity solutions to manufacturers and processors.
Multi Instruments Data Acquisition Software Evolution
A Next Generation OCS Welcome to Horner Operator Control Station Training.
QuickServer Protocol Gateways
Eycon Visual Supervisor
ADAM-4572 Ethernet To Modbus Solution Ethernet to Modbus Data Gateway
Applying Wireless in Legacy Systems
AS-i, The Simplest Automation Networking Solution Dated: 10/30/2008.
Title Subtitle WebVision Product Overview. 2© HONEYWELL WebVision Overview: Outline Introduction - Portfolio-fit - Architecture Product.
EtherNet/IP Profile Switch Step by Step
Wireless Technology & Applications Part Two
FieldServer Overview Opportunities for Cross-Selling.
Building Technologies Standard Protocols Update January 2011 Building Automation Integration & Standard Protocols.
Graphical Alarm Management System
Presented to: Name of Customer Enhanced MET ONE 3400 Series Portable Airborne Particle Counters.
L25 - SLC™ Migration Workshop
Make the most of your energy June 2008 Power Meter 800 PowerLogic ® Power Meter 8ECC.
Tuesday, March 28, 2000 Connecting the MLC9000 to the Allen Bradley SLC500 via Modbus.
ADAM-5000/TCP- Distributed Ethernet I/O
eAutomation Enabler – Advantech Industrial NETworking
1. 2 How do I verify that my plant network is OK? Manually: Watch link lights and traffic indicators… Electronically: Purchase a SNMP management software.
1 © Red Lion Controls Inc. Introducing the RAM 9000.
Copyright © 2013 Rockwell Automation, Inc. All Rights Reserved.Rev 5058-CO900D L30 - Sizing PlantPAx System Architectures for Optimal Performance Sizing.
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
1 Sales Academy Training Inner Range Product Advantages, Competitors & The Future.
Jim Boyd, C.E.M., LEED AP South Bay Cities Energy Management Systems.
EtherNet/IP Profile Switch Sales Presentation
AFCON SOFTWARE AND ELECTRONICS Advantages of P-CIM.
ETHLON LonWorks Ethernet Adapter Conventional Approach SIPAI Solution ETHLON DIRECTLY REPLACES SLTA-10 OR SLTA CONNECTIONS.
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
1 Product & Technology Quality Excellence Support American Global Products Product & Technology TeSysPort Ethernet Interface for TeSys June 5, 2007.
Make the most of your energy December 2008 PM8ECC Need improved Network capabilities out of your meter? PowerLogic ® PM8ECC.
Guide to Linux Installation and Administration, 2e1 Chapter 2 Planning Your System.
M340 Modbus Plus Proxy Link legacy systems to Ethernet
Automation Automation & Drives Business Unit Smart Platform.
Scott Muench - Technical Sales Manager
Systems Solution Marketing Group Industrial Automation Business Headquarters Yokogawa Electric Corporation ISD-MASP-S05011 Copyright © Yokogawa Electric.
Managing Network Devices with Cognex Connect Eric Hershberger Senior Applications Engineer.
A Next Generation OCS OCS connectivity to (aka the Evil Empire) Rockwell Automation.
New product introduction:
World Leaders in Combustion Management Solutions Remote Monitoring & Data Logging C.E.M.S I/O Modules DTI Autoflame Training,
LonWorks Introduction Hwayoung Chae.
TS8000 TS8000 Series HMI. Key Features Standard support for current SSD products. Support For Common third party Hardware. Programming software Included.
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. PUBLIC PUBLIC CO900H L18 - Studio 5000® and Logix Basics Lab.
Chapter 4: server services. The Complete Guide to Linux System Administration2 Objectives Configure network interfaces using command- line and graphical.
Control Technology Incorporated. Introduction to 2500-ACP1 Application Coprocessor 2500-WB-USB Workbench Integrated Development Environment for IEC
Indoor and outdoor location and tracking for. SafetyNet Locator provides an opportunity for dealers to add value to existing systems or up-sell an opportunity.
Top 10 Differentiators.
An Overview When Connecting to Yaskawa Drives Date: 8/14/06, Rev: PP.AFD.26.
Page 1 NeSSI II - A Platform for Micro-Analytical Devices Sensor Actuator Manager (SAM) Controller Considerations And Specification Identification CPAC.
Networks and Security Great Demo
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. PUBLIC PUBLIC CO900H L06 - Developing Safety Applications Using the Guardmaster®
Frequently Asked Questions (FAQ)
ControlLogix Portfolio
L14 - Speed Integration with Ethernet-enabled CENTERLINE® MCCs, Rockwell Software Studio 5000® and IntelliCENTER® Software.
L25 - PlantPAx Process Application Development Lab I
Collaboration with Existing Controllers
Welcome! Thank you for joining us. We’ll get started in a few minutes.
Graphite® Control Platform
IzoT™ Routers and Network Interfaces
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Field installable, upgradeable and scaleable
Presentation transcript:

Interfacing Building Automation Systems (BAS) to Process Control Presented by: Gordon MacLachlan (Mac)

Presentation Highlights  The Need for BAS In Process Control Systems  The Need for Process Control in BAS Systems  Common BAS Network Protocols  Common Process Control Network Protocols  FieldServer Protocol Support  FieldServer Hardware Solutions  Case Study: Interfacing with Rockwell  General Integration Considerations

The Need for BAS in Process Control  Energy Management Process Control and BAS equipment interact to minimize energy requirementsProcess Control and BAS equipment interact to minimize energy requirements Example: Different cooling schedules for a building when plant is in or out of operationExample: Different cooling schedules for a building when plant is in or out of operation  Safety Process Control Events could trigger safety actions on the BAS side and vice versa.Process Control Events could trigger safety actions on the BAS side and vice versa. Example: Gas leak detection could close room vents in affected zone.Example: Gas leak detection could close room vents in affected zone.  Centralized Control Centralized operations lead to the desire for homogenous host HMI’s that monitor both BAS and Process control.Centralized operations lead to the desire for homogenous host HMI’s that monitor both BAS and Process control.

The Need for Process Control in BAS  Optimized Environmental Control Control Process affect the building environment. Monitoring the process allows for predictive zone management.Control Process affect the building environment. Monitoring the process allows for predictive zone management.  Shared technology BAS makes use of many of the same types of equipment that Process Control does.BAS makes use of many of the same types of equipment that Process Control does. Examples: Boilers, UPS systems, VFD’s etc.Examples: Boilers, UPS systems, VFD’s etc.

Common BAS Networks  Open Protocol Networks BACnetBACnet LonWorksLonWorks ModbusModbus  Common OEM Networks JCI Metasys N2JCI Metasys N2 Data AireData Aire CarrierCarrier LutronLutron  Fire Alarm Control Panel (FACP) Networks NotifierNotifier ESTEST SimplexSimplex SiemensSiemens Fike, and othersFike, and others

Common Process Control Networks  Open Protocol Networks Modbus/TCPModbus/TCP Modbus RTUModbus RTU OPCOPC ODVA EtherNet/IPODVA EtherNet/IP DeviceNetDeviceNet ProfibusProfibus HartHart  Common OEM Networks AB CSPAB CSP AB DF1AB DF1 AB ControlNetAB ControlNet GE SNPGE SNP GE SRTPGE SRTP

Deciding on a Protocol – Factors that count  Legacy PLC/SLC, or “Logix”? If ControlLogix, then use SlotServerIf ControlLogix, then use SlotServer  Is the serial DF1 port in use? If so, then rule out DF1 as an optionIf so, then rule out DF1 as an option  Does the specification state protocol to be used? If so, then decision is madeIf so, then decision is made  Cost of PLC equipment needed for the interface Price differences may be significant.Price differences may be significant.  Client or Server Application? For HMI Interface, use OPC.For HMI Interface, use OPC. CASE STUDY: Rockwell Interface

 Direct connection from Allen Bradley ControlLogix PLC to another network  Standard 1756 format plugging directly into the Allen Bradley ControlLogix rack  RS-485 port for devices/networks using RS-485 protocols  Ethernet port for Configuration Utilities & Ethernet devices/network  Standard LonWorks TP/FT-10 interface for LonWorks devices/network  Installing the SlotServer module is a very simple procedure LonWorks TP/FT-10 interface RS-485 port Ethernet port CASE STUDY: Rockwell Interface The ControlLogix Solution: SlotServer

SlotServer Features  Plug the SlotServer directly into the ControlLogix Communications rack  Scrolling text display with 3 status LED’s provides card status at a glance  A bank of six LED’s provides communications status at a glance, as well as additional diagnostic indications  Ethernet port for advanced troubleshooting purposes  Service Pin for LonWorks commissioning Diagnostic displays Service Pin CASE STUDY: Rockwell Interface

Hardware Specifications:  Backplane Load: 0.6A  Slot width: 1  Operating Temperature: -40 to 185 Deg. F  Humidity: 5-95% (non-condensing) CASE STUDY: Rockwell Interface

Software Features  Transfer up to 6000 points between ControlLogix and many third party interfaces.  Configure the SlotServer to communicate with many different protocols, including LonWorks, BACnet, Metasys and Modbus.  Flexible configuration architecture allows for creative connectivity options.  Use the Standard SlotServer profiles for connection without configuration CASE STUDY: Rockwell Interface

Software Features  Control communications in the ControlLogix software using standard generic message blocks  Example message block code provided in an ACD file with the SlotServer CASE STUDY: Rockwell Interface

Distinct Advantages - SlotServer  Allows connection of a Third Party Network to a ControlLogix system without the use of external gateways  Sits in the ControlLogix rack, thereby preserving cabinet “Real Estate”  Provides generic profiles (such as LonWorks Open Interface) or custom profiles (with configuration), allowing for a choice between ease and flexibility. CASE STUDY: Rockwell Interface

Generic vs Custom Mapping  SlotServer can ship default with generic open profile or can be shipped as the configurable version.  The generic profile eliminates the need for messing with config.csv, thus reducing commissioning time.  Creating a custom profile with config.csv allows for more flexibility to suit the specific application  FieldServer offers custom profiling services if needed. CASE STUDY: Rockwell Interface

Preparing for Configuration 1. Training – Attend a FieldServer training class or order the first SlotServer pre-configured as a template to learn from. 2. Input – Acquire information about BAS protocol points to be mapped. Information must include point address details for the particular protocol. 3. Draw – A picture paints the proverbial 1000 words. Sketch a network diagram, and then sketch a schematic of how the data blocks are to be mapped. 4. Configure – With the first 3 steps done correctly, this step becomes easy. CASE STUDY: Rockwell Interface

Data Arrays. Map Third party points into and out of these data arrays and let the Logix driver do the rest. Multiple blocks exist so that the data can be mapped through the limited IO Buffer on the backplane using multiplexing. CASE STUDY: Rockwell Interface

Example: Connecting the SlotServer to LonWorks Sample Mapping: The points below show a sample of Lon Points that are mapped into the Data Arrays that get multiplexed in and out of the Backplane buffers. Map_Descriptors Map_Descriptor_Name, Data_Array_Name, Data_Array_Offset, Lon_Function, Function, Node_Name, SNVT_Type nvoVolt1_25,Out_25,74,NVUOIMX,WRBX,Lon_Srv_1,SNVT_volt nvoVolt2_25,Out_25,75,NVUOIMX,WRBX,Lon_Srv_1,SNVT_volt nviAmp1_01,In_1,00,NVUI,Server,Lon_Srv_1,SNVT_amp nviAmp2_01,In_1,01,NVUI,Server,Lon_Srv_1,SNVT_amp Data Arrays Assigned to I/O Buffers by Logix driver Standard LonWorks Driver Mapping CASE STUDY: Rockwell Interface

General Integration Considerations  Are you a BAS expert or a Process Control expert? Bridging between industries probably means that the user will be familiar with one side of the gateway application, but not the other. Some familiarization with the unknown side will be required.Bridging between industries probably means that the user will be familiar with one side of the gateway application, but not the other. Some familiarization with the unknown side will be required.

General Integration Considerations  Different Protocols behave differently LonWorks has binding, BACnet autodiscovers, EtherNet/IP talks tags, Profibus needs gsd’s, whereas ControlNet needs eds’s. Metasys has slaves, Modbus polls, GE EGD has subscribers, etc, etc..LonWorks has binding, BACnet autodiscovers, EtherNet/IP talks tags, Profibus needs gsd’s, whereas ControlNet needs eds’s. Metasys has slaves, Modbus polls, GE EGD has subscribers, etc, etc.. The bottom line is they all do the same thing in different ways. They all pass data.The bottom line is they all do the same thing in different ways. They all pass data. Configuring these protocols is typically easy due to tools provided. However, knowing what to configure is not.Configuring these protocols is typically easy due to tools provided. However, knowing what to configure is not.

General Integration Considerations  Scaleable support – Use what you need Using a FieldServer product requires purchase, configuration, commissioning and supportUsing a FieldServer product requires purchase, configuration, commissioning and support If familiar with the network protocols involved consider purchasing the product and doing configuration and commissioning yourselfIf familiar with the network protocols involved consider purchasing the product and doing configuration and commissioning yourself If unfamiliar with the network protocols, consider purchasing the configurationIf unfamiliar with the network protocols, consider purchasing the configuration If unfamiliar with network integration, consider purchasing the commissioning.If unfamiliar with network integration, consider purchasing the commissioning.

General Integration Considerations  Getting it right – Input is the key GIGO – Garbage in, garbage out - GUARANTEEDGIGO – Garbage in, garbage out - GUARANTEED To configure a FieldServer product, details of the data to be mapped is required. This is the configuration input.To configure a FieldServer product, details of the data to be mapped is required. This is the configuration input. The quality of the configuration input determines the quality of the configuration, which in turn determines the success of the commissioning process.The quality of the configuration input determines the quality of the configuration, which in turn determines the success of the commissioning process. The bottom line: Spend more time getting the input right.The bottom line: Spend more time getting the input right.

Resources  FieldServer Website (  LonMark website (  Modbus IDA website (  Echelon Website (  Rockwell Allen-Bradley Website (  BACnet Website (  Rockwell Automation Encompass Website (

Contacts Marketing and Sales: Steve Ferree: Richard Theron: Technical: Mac:

THANK YOU! …..for taking the time to attend this presentation. Questions?