Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping.

Slides:



Advertisements
Similar presentations
WORK INSTRUCTIONS – Supervisor You deliver production orders to the Kitter. You motivate. If something is wrong. Find the culprit. Then motivate some more.
Advertisements

Lean Manufacturing.
Lean Systems 1. Some history After WWII the US population grew faster than before. The growing population lead to a high demand for goods and services.
Here we continue in the chapter on Lean Systems
Building Lean Systems Mixed Model Scheduling. 2 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed-Model Scheduling and Small.
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Vandal Boat Factory Simulation
OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin
Lean Operations (JIT) Module
1 Leveling: Tortoise not Hare. 2 Ohno, 1988 The slower but consistent tortoise causes less waste and is much more desirable than the speedy hare that.
Lean Operations (JIT) Module
Just-In-Time “Eliminate Waste”.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan.
Lean and Sustainable Supply Chains. 1. Describe how Green and Lean can complement each other. 2. Explain how a production pull system works. 3. Understand.
CONTINUOUS IMPROVEMENT PROGRAM
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
Welcome to the Lego Widget Flow Factory!
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
SchedulingProducingControllingSchedulingProducingControlling.
ISQA 459 Mellie Pullman 1.  JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Just-In-Time & Lean Systems
LEAN system.
JIT and Lean Operations
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
Round 1 Debrief - AM What worked? What didn’t work? – Inspection standards missing – Rework missing proper tooling – Bottleneck at inspection – Shipping.
CAD CAM CADMAT A2 Graphics. CADMAT We will look at … We will look at … CADMAT CADMAT –Computer aided design, manufacture and Testing PDM PDM –Project.
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
© 2007 Pearson Education 7- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 7 Internal & External Process Simplification 09/25.
“Without the Cost of Waste …”
Manufacturing Systems Manufacturing System Design & Control.
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
SchedulingProducingControllingSchedulingProducingControlling.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Manufacturing Line Demonstration This short PowerPoint presentation is designed to give the reader an example of how a Lean/Pull system operates.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
8/24/04 Paul A. Jensen Operations Research Models and Methods Copyright All rights reserved Review Models and Analysis of Manufacturing Systems.
Purpose: To help demonstrate the lean principles Time: 1 hour Airplane Exercise.
Lab #4: Pull and Perfection MG/IE 3400 – Production System Design.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
The Goal A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Round 1 Debrief - AM What worked? Thorough inspection process Kitter and production scheduler always on time What didn’t work? Bubba wasn’t available to.
Definition: The physical positioning of processes, departments, equipment and work areas to optimize an organization’s effectiveness in achieving its operating.
Mel Wendell – Mountain Pointe High School
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
Inputs and Outputs to Aggregate Production Planning
Lab #1: TimeWise Simulation Round 1
Round 1 Debrief - PM What worked? What didn’t work?
Manufacturing Planning
Round 1 Debrief - PM What worked? What didn’t work?
Value Stream Mapping ASQ March 2018.
Round 1 Debrief - PM What worked? What didn’t work?
Manufacturing Production Planning
Uses of Performance Analysis in High Speed Assembly
Inputs and Outputs to APP
Presentation transcript:

Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping location, wild stamping, uneven folding, scraping – Couldn’t meet sales for silver boats, glut of gold boats – Sales and production scheduling not matching – Inefficient material handling

Changes for Round 2 Consider the following: – Factory Layout Move folding tables together? And stamping? – Point of Use Storage (POUS) Get rid of kitting, move workers to folding, use POUS at fold1 – Poke-Yoke, Quality at the Source Have folders inspect work? Send rework only individual boats, not full batch Inspection/rework before the oven – Line Balancing Inventory build-up detrimental to quality Get rid of kitting, move workers to folding Move workers around

Round 2 Debrief - PM What worked? – Better factory layout – Boat quality down – Bad stamping – Need Poke-Yoke – Sail template worked well in inspection and folding What didn’t work or should be improved? – Inspection – move to source, self inspection – Not enough silver boats: orders not same as schedule

Changes for Round 3 Consider the following: – Factory Layout Flex work – Pull System, Kanban Pull between station – Continuous Flow and Supermarkets Supermarkets around the oven (monument) – 2 gold, 2 silver Kanban Continuous flow – Poke-Yoke, Quality at the Source Inspection at source

Round 3 Debrief - PM What worked? What didn’t work? – Quick communication of demand – Let us respond to demand mix – Less stressful at each process – Might need Kanban adjustment – increase? – Flex workers – more balance – Less WIP Areas for improvement? – Larger Kanban – Time study in folding, line-balancing, flex working, work cell – Layout improvement – Another stamp tool? Another oven?