The Introduction and Implementation of new Scanning Systems Susannah Tandy 20/11/14.

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

1 of 18 Information Dissemination New Digital Opportunities IMARK Investing in Information for Development Information Dissemination New Digital Opportunities.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Inpainting Assigment – Tips and Hints Outline how to design a good test plan selection of dimensions to test along selection of values for each dimension.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
ISO Culture SHOQ Quiz 1. This program must be run in MS PowerPoint and requires sound. 2. Click “View” and then “Slide Show”. 3. Click “Continue”
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Office Productivity How to get the most out of your Canon multi-functional units Ancillary Services Printing and Mail Operations.
Enhancing Education Through Technology Round 9 Competitive.
Twinning Project RO2006/IB/EN/09 1 Saxony-Anhalt State Environmental Protection Agency Wolfgang GarcheBukarest Wolfgang Garche Saxony-Anhalt.
Establish Verification Procedures (Task 11 / Principle 6)
The ISO 9002 Quality Assurance Management System
School of Computing, Dublin Institute of Technology.
Pertemuan 16 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Manager Orientation Budgeting & Forecasting. 2 UFundamentals Today’s Agenda New Budget Model Principles Overview of budgeting and forecasting Timelines.
Manifest Program Review and QA/QC Discussion. CIWMB
Dimensions of Data Quality M&E Capacity Strengthening Workshop, Addis Ababa 4 to 8 June 2012 Arif Rashid, TOPS.
THE SYSTEMS LIFE CYCLE ANALYSE DESIGN IMPLEMENT MAINTENANCE IDENTIFY/INVESTIGATE.
Speed & ease of the web coupled with the expertise of a professional recruiter and support team who understands the required candidate profile and client.
The name you can BANK upon! 1 CHEQUE TRUNCATION – Business Opportunities K.S. Bajwa, General Manager –IT Punjab National Bank.
Energy Efficiency Opportunities (EEO) Program 2nd International Conference on the Global impact of Energy Management Systems: ‘Creating the right environment.
Introduction to ISO New and modified requirements.
Evaluation Office 1 Evaluating Capacity Development David Todd Senior Evaluation Officer GEF Evaluation Office.
Server Virtualization: Navy Network Operations Centers
VALIDATION METHODOLOGY
UNSD-ESCWA Regional Workshop on Census Data Processing in the ESCWA region: Contemporary technologies for data capture, methodology and practice of data.
Sterling Chadee Director of Statistics. The processing of the data from the field enumeration began in July 2011 until September All data processors.
Welcome! Presenter: Tandy Trujillo. Major Topics To Be Covered Complete Physical Inventory Cycle Counts / Partial Physical Inventory Linear Pro Sled w/
Module CC3002 Post Implementation Issues Lecture for Week 6 AY 2013 Spring.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
What you’ll take away: 1.Define team and schedule 2.Software and hardware specifications 3.Analysing 4.Configuration and migration 5.Validation and Test.
Introduction to ISO 9001:2000.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
College of Technology and Innovation TEM 194: Introduction to Technology Development. Instructors : Steve Murphey and Dan O’Neill Sid Rugh Renewable Energy.
End HomeWelcome! The Software Development Process.
AUDITOR-GENERAL Presentation to the Public Service and Administration Portfolio Committee on the appointment and utilisation of consultants Report of the.
Open Budget Meeting Budget and Finance Budget Reduction for FY13 FY 2013 FY 2013 State Appropriations $ 22,799,099 FY 2013 Special Funding Initiative-Nursing.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
SCHOOLS FINANCE OFFICERS MEETINGS Records Management, “Paper-Lite” Environments and Procedures when a school closes Elizabeth Barber.
Census Data Capture with OCR Technology: Ghana’s Experience Presented at the UNSD Regional Workshop on Census Data Processing Dar es Salaam, Tanzania 9.
Unit III Bandwidth Utilization: Multiplexing and Spectrum Spreading In practical life the bandwidth available of links is limited. The proper utilization.
Input Devices By Mrs. Gonzales. All the input, output and storage devices connected to and dependent on a computer for operation are called peripherals.
1 Chapter 13 (Week 13) SYSTEMS MAINTENANCE AND EVALUATION Chapter 13: SYSTEMS MAINTENANCE AND EVALUATION Throughout its life, a system should operate effectively.
Chapter 11 Selecting the Best Alternative Design Strategy Modern Systems Analysis and Design Third Edition 11.1.
Quality Standards ISO:9000 ISO:9000 Quality Systems Under ISO:9000 Quality Systems Under ISO:9000 ISO:14000 ISO:14000 ISO Certification Process ISO Certification.
Verification & Validation
A brief look at the components that make up the system life cycle.
Workshop on Census Cartography and Management, Port-of-Spain, Trinidad and Tobago, October 2007 How to Structure, Design and Evaluate Capacity for.
FACTORS AFFECTING THE EFFICIENCY OF DATA PROCESSING SYSTEMS.
December 13, G raphical A symmetric P rocessing Prototype Presentation December 13, 2004.
Workshop on Census Cartography and Management, Bangkok, Thailand, 15–19 October 2007 How to Structure, Design and Evaluate Capacity for the use of GIS.
I.T. C ONTINGENCY Mark Gilmour Laboratory Quality Manager NHS Forth Valley.
General Introduction Markus Nordberg (CERN DG-DI-DI) 1
Scientific data storage: How are computers involved in the following?
Workshop on International Standards, Contemporary Technologies and Regional Cooperation, Noumea, New Caledonia, 04–08 February 2008 How to Structure, Design.
FISH Automation 소개 진단검사의학과 강지연.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
Business plan LDR 609 Purchase of a ge revolution ct scanner
SOFTWARE TESTING Date: 29-Dec-2016 By: Ram Karthick.
COMP532 IT INFRASTRUCTURE
Initiating systems development
National Laboratory Association
Ward Stock Management Guide
Summary Project goals related to the Census Selection of a Methodology
National Drug Control System
Data Capture Process Stages
The Assessment Process
QA Reviews Lecture # 6.
Presentation transcript:

The Introduction and Implementation of new Scanning Systems Susannah Tandy 20/11/14

Introduction Why do we scan our slides? – Microscope V Scanning Why did we need a new scanning system? Implementation – iso15189:2012, Validation and Verification – Scanner installation plan – Verification Results Positive results and the future

Microscope V Scanner Historically analysed using microscope However, this can be a lengthy analysis Needed to move into 21 st century

Microscope V Scanner Purchased the Metasystems metafer slide scanning platform – White paper funding Manipulation – Line up chromosomes – Enhancement Storage – Digital copy Time and motion studies showed a 30% increase in efficiency

Original Metafer Scanning System Comprised of 1 st Generation slide feeder and Zeiss Axioplan Z microscope Although increased efficiency, there were frustrations:

Original Metafer Scanning System Frame Check – Time consuming Temperamental Sensors – Frame loading problems – Delays Auto-Oiling System – Messy – Can contribute to breakdowns Limited capacity – Max of 70 slides

Original Metafer Scanning System Had reached end of life: – Zeiss no longer supporting the microscope – Used old IT technology Windows 7 capability not guaranteed Looked towards getting an upgrade

New Metafer Scanning System Purchased Metafer 2 nd Generation slide feeder accompanied by Zeiss Axio imager Z2 microscope – Includes a barcode reader No need for frame check More efficient use of staff time

New Metafer Scanning System Better frame loading system – Less likely to drop a frame – No aborted runs – Less delay on cases being scanned More advanced Auto-oiler – Controls the amount of oil – Better focusing – No drips – Less mess and potential breakdowns

New Metafer Scanning System Only 5 slides per frame BUT – Each stack can take 16 frames – 80 slides per stack Up to 5 stacks each scanner – Increase number of slides per run

Why Metasystems? Compatible with systems already in place (Ikaros and Isis) Avoided having to move to an alternate provider – transfer of images

Implementation Purchased using Capital replacement budget with support from the trust Reduced number of constitutional scanners – Reduction of conventional cytogenetic analysis due to move to Arrays service Maintained Haemato-Oncology capabilities – Increasing service

iso15189:2012 Validation and Verification of equipment is an important requirement of iso15189:2012 WMRGL is accredited to iso15189:2012 Validation – carried out by company Verification – carried out by laboratory Scanners implemented before assessment – Needed to make sure we met the criteria – Opportunity to ensure correct procedure in place – First large piece of new equipment

Installation Sequential – Maintain capability with minimal downtime – Ensure appropriate testing Constitutional scanner installation – December rd scanner not upgraded – Verified for Haemato-oncology preparations Haemato-Oncology scanner installation – January 2014

Verification Both scanners found to be acceptable for the scanning of slides appropriate for that scanner ConstitutionalHaemato-Oncology Postnatal casesPrenatal cases Total number of Metaphases Captured The Test Scanner picked up more metaphases than the Control scanner Amount of rescanning needed The Test scanner did not need to rescan any high power images while the Control scanner did The Test scanner needed to rescan less high power images than the Control scanner Quality of imagesImages from the Test scanner were of a comparable quality to the images captured on the Control scanner Images from the Test scanner were of a better quality than the images captured on the Control scanner Images from the Test scanner were of a comparable quality to the images captured on the Control scanner

Moving Forwards SOPs written and agreed – SOP for the use of new scanning systems – SOP for Guidelines for Validation and Verification– abide by iso15189;2012 standard Since been used to implement new hardware – Luminex – Helped ensure protocols are correct WMRGL moving onto windows 7 in future – 2 nd generation scanners already us this – Remaining original scanner not compatible Verify Constitutional scanner for Haemato- Oncology slides

Acknowledgements I would like to say thank you to the following people: Claire Gleave Donna Woodman Graham Fews Michelle Fenlon Michelle Owen The Karyohub Team Any Questions?