CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.

Slides:



Advertisements
Similar presentations
March 13, 2013 ERCOT Public CRR Transaction Limits NPRR463 Implementation Update Matt Mereness ERCOT Manager Day-Ahead Market and CRR Auction.
Advertisements

Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Concerns with RUC Capacity Short Charge and Energy Trades.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
CRR Update Dave Maggio CMWG July 18, CMWG 7/18/ Transaction Limit Utilization Metrics Discussion on Special “One-Time” Auctions of CRRs Upcoming.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG September 19, 2014.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Retail Market Subcommittee Update to COPS Kathy Scott July 16,
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
CSWG/RCWG 05/11/2012 Price Validation and Correction Resmi Surendran Manager, Market Analysis.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date May 15, 2014.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
CMWG Update Mark Soutter - Invenergy LLC WMS November 2015 Meeting.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
CMWG Update to WMS Report of CMWG Meetings of &
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Price Correction Process Resmi Surendran QMWG 04/10/2015.
CRR Update to CMWG ERCOT CRR Team Congestion Management Working Group Aug 7, 2013.
Congestion Revenue Rights Activity Calendar Update Donald House CMWG October 23, 2015.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
1 Market Trials Update NATF May 4, 2010.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Cutover Update NATF 2 November Today’s Agenda Reminders Program Status 24 Hour LFC Test Update Cutover Update Soft Launch 2 November 2010NATF.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
TAC 2012 Meetings Update (March & April) to Commercial Operations Subcommittee Harika Basaran 5/8/2012.
CMWG Update to WMS Report of CMWG Meeting of
Transition Plan Network Operations Model Change Requests 5/26/2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
1 Market Trials Update NATF January 5, 2010.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
Market Trials Update NATF March 2,
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Settlements Analysis due to SFT Deration Issue
Presentation transcript:

CMWG Update June WMS Meeting CMWG Update 1

CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2

Auction Activity – Long Term Auction Sequences (LTAS) Sequence 1 (Fall 2014) relative to Sequence 1 (Spring 2015) included: – An increase in total transactions submitted (130K compared to 117K) – A decrease in credit locked by Counter-parties – A 25% increase in # of transactions awarded – A 7% decrease in MW awarded – Equivalent revenue (2% reduction) – A 10% increase in binding constraints The decrease in credit locked may be due to NPRR 484 3

4

Auction Activity: Monthlies July 15 Auction opens this week. June 15 results recently posted, noting similar trends to the LTAS (June YOY): – 8% reduction in Credit Locked by Counterparties – 9% increase in transactions submitted – 62% increase in transactions awarded – 12.5% increase in MW awarded – 43% reduction in net auction revenue – 3% increase in binding constraints 5

6

Other Updates - Auctions PCRR Allocation Results were posted on May 22 nd 2015 – Years 2016, 2017 – Slight reduction YOY as eligibility slightly changed SCR779 was migrated into production last week, in effect for July and Seq. 3 auctions – Increases system wide transaction limit from 200,000 to 300,000 – Per-CRR Account Holder limit will be 10,000 for monthlies, July forward / 4,000 per LTAS, Sequence 3 forward 7

Other Updates - Auctions The CRR Rolling Balancing Account through April accrued approximately $8M 8

Other Updates Panhandle Export Limit – ERCOT continues to study and monitor for voltage oscillations in the Panhandle region as wind interconnection activity increases. – Absent an industry standard for Short Circuit Fault Current Ratios, ERCOT is collecting study inputs to establish a metric. – The CREZ Upgrade Study will be available on or around August/September

Other Updates Equal Access to Stability Limit Data – A market participant observed that an interconnecting customer may have been aware of constraints relative to their interconnection prior to a market notice. – NPRR 703 may not adequately address the issue. – CMWG recommends a joint meeting or webex with CMWG and PLWG to address equitable dissemination of voltage stability constraints. 10

May 18 th West Zone Congestion June WMS Meeting CMWG Update 11

Sequence of Events: Oncor upgraded the Glenhaven to Midland Airport line (The G-M Line.) Oncor submitted a Network Operations Model Change Request (NOMCR) to change the line rating of the G-M Line on March 13 th. The NOMCR, submitted by Oncor, included an April 1 model load date. 12

Sequence of Events: ERCOT reflected the NOMCR as submitted by Oncor in the Operations Model with a static rating of 326MVA. Oncor continued to telemeter a dynamic rating for this line at or around 178MVA. As congestion accrued and the G-M approached the dynamic rating telemetered by Oncor, ERCOT requested that Oncor develop a Temporary Operations Action Plan (TOAP.) 13

Sequence of Events Oncor recognized the incorrect telemetered rating after discussion with ERCOT: – ERCOT and Oncor coordinated the development of a TOAP for real-time G-M congestion. – Oncor corrected the error as part of the TOAP discussion. The dynamic rating telemetry was then updated with the correct rating. The G-CRMD constraint was active and binding from 10:00:15 until 16:15:11, generating approximately $4.8M in congestion rent (market-wide.) 14

ERCOT suggests that price corrections are not appropriate as SCED successfully delivered valid prices and base points based upon the data provided to ERCOT (including submissions by Oncor.) ERCOT suggests price corrections are not needed 15

Discussion at CMWG Numerous market participants assert that the SCED solution was invalid, since it was based upon an erroneous value telemetered by Oncor. – If it is determined that correcting the Real-Time Settlement Point Prices will affect the Base Points that were received by QSEs, then ERCOT shall correct the prices before the prices are considered final and settle the SCED executions as failed in accordance with Section , Failure of the SCED Process. (Nodal Protocols Section 6.3 Paragraph 5b) 16

Discussion at CMWG Other Market Participants suggested that ERCOT is not responsible to correct prices based upon successful SCED processes that depend upon data submitted by Market participants, citing numerous precedents. – The ERCOT Network Model is dependent upon accurate reporting of millions of elements that impact ratings, and ERCOT depends upon data submitted by TDSPs. 17

Appendix 18

6.3Adjustment Period and Real-Time Operations Timeline Paragraph 4: ERCOT shall correct prices when: (i) a market solution is determined to be invalid, (ii) invalid prices are identified in an otherwise valid market solution, or (iii) the Base Points received by Market Participants are inconsistent with the Base Points of a valid market solution, unless accurate prices cannot be determined. 19

6.3Adjustment Period and Real-Time Operations Timeline Paragraph 4 The following are some reasons that may cause these conditions (a)Data Input error: Missing, incomplete, stale, or incorrect versions of one or more data elements input to the market applications may result in an invalid market solution and/or prices. (b)Data Output error: These include: (i) incorrect or incomplete data transfer, (ii) price recalculation error in post-processing, and (iii) Base Points inconsistent with prices due to the Emergency Base Point flag remaining activated even when the Security-Constrained Economic Dispatch (SCED) solution is valid. (c)Hardware/Software error: These include unpredicted hardware or software failures, planned market system or database outages, planned application or database upgrades, software implementation errors, and failure of the market run to complete. (d)Inconsistency with the Protocols or Public Utility Commission of Texas (PUCT) Substantive Rules: Pricing errors may occur when specific circumstances result in prices that are in conflict with such Protocol language or the PUCT Substantive Rules. 20