AIXM Status Report Delivering Digital Services

Slides:



Advertisements
Similar presentations
ADQ Implementation Workshop Austro Control – Status and Issues
Advertisements

The European Organisation for the Safety of Air Navigation Open session AIXM XML Developers' Seminar.
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Progress of Digital NOTAM Development and Implementation
The European Organisation for the Safety of Air Navigation AIXM 5.1 – Business rules AIXM XML Developers' Seminar.
Delivering Digital Services Aeronautical Information Services in Europe Presented By: Eduard Porosnicu, EUROCONTROL Date:August 26, 2014.
EUROCONTROL’s Efforts with AIXM
Introduction to AIXM. Topics Criticality of AIS information AIM – a “data centric” approach Worldwide interoperability AIXM mission Related developments.
Presented to: Federal Architects By: Kim W. Barnette, Ph.D. Aeronautical Information Management Federal Aviation Administration Date: April 11, 2007 Federal.
Digital AIM Training - Digital NOTAM
EUROCONTROL Digital NOTAM Project
UML to XSD Implementation
Integrating information towards Digital ATM Information Structures - AIXM - Presented By: Eduard Porosnicu, Eurocontrol Date:August 27, 2013.
The European Organisation for the Safety of Air Navigation AIXM Business rules.
What’s New with AIXM 5. Explaining AIXM 5 Mission and Objectives Coverage of the AIXM 5 data model –Scope of aeronautical information –Emerging “partner”
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
Presented to: AIXM Developer’s Seminar By: Navin Vembar Date: January 14, 2010 Federal Aviation Administration Changes in AIXM 5.1 from AIXM 5.0.
The European Organisation for the Safety of Air Navigation ARINC 424A specification and SESAR WP9.31 AIXM Procedure Modelling/Encoding seminar Brussels.
The European Organisation for the Safety of Air Navigation EUROCONTROL’s Efforts with AIXM AIXM 5.1 XML Developers' Seminar #4 – Mar 2010.
By: Date: Federal Aviation Administration Review of 2007 South and Central America AIXM workshop Federal Aviation Administration May 2009 AIXM Seminar.
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
The European Organisation for the Safety of Air Navigation EAD AIXM 5.1 Implementation Razvan Guleac DNM/COO/NOM/ADM AIXM 5.1 Seminar.
The European Organisation for the Safety of Air Navigation Aeronautical Information Exchange Model (AIXM) – Business Rules.
UNCLASSIFIED 1 Digital Geospatial Information Working Group (DGIWG) Jeffrey Bell – NGA Aeronautical Harmonization Working Group Chair Briefing to AIXM.
The European Organisation for the Safety of Air Navigation OGC Aviation DWG - Bonn Hubert LEPORI EUROCONTROL – DSR/CMN/IM 01-March-2011.
The European Organisation for the Safety of Air Navigation ADQ, INSPIRE and Metadata AIXM 5.1 Seminar.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
AIXM - purpose, scope, implementation and future evolution.
The European Organisation for the Safety of Air Navigation AIXM 5.1 Seminar Introduction.
AIXM XML Schema aspects. Copyright EUROCONTROL 2011 AIXM 5 – Design Objectives Capabilities Extensibility Flexible Exchange Flexible Messages Static and.
The European Organisation for the Safety of Air Navigation AIXM Procedure Modelling/Encoding seminar Brussels – 01/02 Sept 2010.
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
Introduction and Welcome. Objectives Present AIXM 5 goals Explain AIXM 5 design concepts –Temporality –GML – Geography Markup Language –Metadata –Identification.
AIXM 5.1 XML Developers' Seminar #2 – Dec 2009
02/05/2018 AIS-AIM SG - #4 Agenda item 1.4 Development implementation of AIS-AIM transition Implementation programmes and updates Paul Bosman Enter here.
AIXM Procedure Modelling/Encoding seminar
AIXM XML Developers' Seminar
AIXM 5.1 – Metadata AIXM CCB – Webex 18 JULY 2017.
AIXM 5.1 – Interoperability issues
AIXM – Work in Progress AIXM CCB – Webex, 24 JAN 2014.
AIXM – Work in Progress AIXM CCB – Webex, 07 FEB 2014.
AIXM 5.1 – Interoperability issues
AIXM 5.1 – Interoperability issues
AIXM 5.2 – WIP AIXM CCB – Webex 09 MaY 2017.
EAD AIXM 5.1 Implementation
AIXM 5.1 – Interoperability issues
AIXM 5 Overview xNOTAM Workshop #2 Brussels, November 2007
AIXM 5 Development Status
Presented by Eduard Porosnicu, EUROCONTROL
Aerodrome & Heliport The use case presentation has revealed just a few of the new applications and services that could be developed on the foundation offered.
AIXM 5.2 – WIP AIXM CCB – Webex 26 July 2018.
AIXM 5.2 – WIP AIXM CCB – Webex 26 June 2018.
Digital AIM Training - AIXM
AIXM 5.1 – Interoperability issues
Digital AIM Training - AIXM
Eddy Porosnicu EUROCONTROL
Welcome and Introductions
30 NOV – 01 DEC 2017, Eurocontrol, Brussels
AIXM CCB – Webex 24 January 2017
AIXM 5.1 – Interoperability issues
Eddy Porosnicu EUROCONTROL
Aeronautical Information Exchange Model (AIXM) – Business Rules
AIXM 5.2 – CP in Lot 2 AIXM CCB – Brussels, 06 MAR 2019.
AIXM scripts and plannning
AIXM 5.2 – WIP AIXM CCB – Webex 29 March 2017.
AIXM – Work in Progress AIXM CCB – Webex, 14 MAR 2014.
AIXM 5.2 – WIP AIXM CCB – Webex 10 OCT 2017.
AIXM CCB – Webex 28 FEBRUARY 2017
Digital AIM Training - Introduction Introduction – day 2
AIXM 5.1 – Interoperability issues
Presentation transcript:

AIXM Status Report Delivering Digital Services Presented By: Eduard Porosnicu, EUROCONTROL Date: August 26, 2014

1

Content AIXM versions in use Resources and support to implementation AIXM 5.1 Extensions AIXM Change Control Board activity Other work in progress Coding/mapping guidelines Business rules 2

AIXM 4.5 3 Published: 2005 Usage: Entity/Relationship Custom XML schema Core AIP data Usage: European AIS Database (EAD) and European national systems Estimated 20+ national systems world-wide… 3

AIXM 5.0 4 Published: MAR 2008 UML Model GML Schema Full AIP/NOTAM data Including obstacle, airport mapping, etc. Metadata Extensibility Usage: Partially, by FAA and NGA 4

AIXM 5.1 (latest) 5 Published: FEB 2010 Update of AIXM 5.0 Usage Usage/availability model Notes vs. descriptions Other adjustments to facilitate Digital NOTAM encoding Usage see AIXM Wiki (www.aixm.aero/wiki) Data Sources 5

AIXM 5.1 A partial inventory only … 6

www.aixm.aero Downloads AIXM Wiki (www.aixm.aero/wiki) AIXM Forum (around 2000 members) See recent posting about OGC OWS-10 Engineering Reports See also Training resources Industry implementations/support 7

Free Tools See also AIXM Wiki: Excel macros for generating some data samples 8

AIXM 5.1 Extensions 9

AIXM 5.1 Extensions Direct (no additional schema necessary) All code lists allow “OTHER” “OTHER:MY_VALUE” Schema extension mechanism additional features/properties UML -> scripts -> additional XML Schema Separate namespace 10

AIXM 5.1 Extensions 11 What for data/processes of local/regional interest backwards mapping R&D Also used adapt model to local views… 11

AIXM 5.1 Extensions 12 http://www.aixm.aero/schema/5.1 To be done: scope/purpose/usage documentation items of global interest -> CCB 12

AIXM CCB See Charter and application form Currently 46 issues recorded http://www.aixm.aero/public/standard_page/aixm_ccb.html Currently 60 members: industry, service providers, ANSP, Eurocontrol, FAA… Open for participation to any true AIXM stakeholder Currently 46 issues recorded 21 Bugs 23 Possible enhancements 2 possible new features 13

Need to protect investments Future AIXM versions Need to protect investments Desire to progress 14

AIXM 5.1.1 Intended for Release by November 2014 Migration to EA (Sparx) Including support for extensions migration Minor corrections only: spelling errors, schema bugs, UML/XML discrepancies, lists of values GML Profile update + schema Definitions improvements Fully bidirectional conversion scripts between versions 5.1 and 5.1.1! Change Proposals: 9 ready for review in JIRA 5 to be drafted 1 external dependency – OGC, Aviation DWG, GML Profile

Other work in progress Coding guidelines OGC Aviation DWG -> GML Guidelines for Aviation Document update Provision of profile schema Europe, ADQ Simplified metadata schema AIP – AIXM 5.1 mapping Data domains coding guidelines obstacles (eTOD working group) to be re-started: procedures encoding interest group 16

Business Rules 17 - Does the data make sense? - Is it compliant with international standards ? Do I respect recommended practices? Is it safe to use? - … 17

Using SBVR SBVR = (OMG) Semantics of Business Vocabulary and Business Rules defines the vocabulary and rules for documenting the semantics of business vocabularies, business facts, and business rules. http://www.omg.org/spec/SBVR/1.1/PDF Example “The geometry of operational airspace of type CTA, UTA and OCA shall be encoded as an aggregation of the corresponding operational SECTORS” Each Airspace.type equal-to ('CTA','UTA', 'OCA') shall have exactly one AirspaceGeometryComponent.operation equal-to 'BASE' and shall not have AirspaceGeometryComponent.operation equal-to ('INTERS', 'SUBSTR', 'OTHER') and shall have each AirspaceVolume.contributorAirspace.type equal-to 'SECTOR' and each AirspaceVolumeDependency.dependency equal-to 'FULL_GEOMETRY' Free text SBVR 18

Business Rules See www.aixm.aero/wiki -> Business Rules Conceptual document “AIXM 5.1 - Business Rules - using SBVR and Schematron” First set of revisited AIXM 5.1 Business Rules is available in the form of an Excel file (600 rules) mandatory feature properties (based on the AIXM 4.5) GML profile restrictions mandatory use of the WGS-84 consistency between certain properties, such as navaid type versus associated equipment, etc. Step 2: mid Sep 2014 (~ 800 rules) Step 3: end 2014 (~ 1500 rules) Demo web-based validation service available from MClick 19

Digital NOTAM Event Specification – version 2.0 to be finalised 20 Other Event (any other situation that does not have a dedicated scenario) Taxiway lights unserviceable Surface contamination (SNOWTAM) Visual Approach slope indicator unserviceable Taxiway closure Obstacle lights unserviceable New obstacle Runway lights unserviceable Navaid unserviceable Approach lights downgraded Runway closure Approach lights unserviceable Aerodrome closure Taxiway usage limitation Route portion opening Runway usage limitation Route portion closure Airport Usage limitation Ad-hoc ATS airspace – creation Runway portion closure Ad-hoc special activity area – creation Declared distances changes Published ATS airspace - activation or deactivation Displaced threshold Published special activity area – activation Increment 2 scenarios Increment 1 scenarios Including Business Rules in SBVR 20

Break-out session Day 3, Proposed Agenda 12:30 - 12:40 welcome/introduction 12:40 - 1:10 AIXM CCB work in progress 1:10 - 1:40 Business Rules work in progress 1:40 - 2:25 Free tools Luciad AIXM Viewer SnowflakeSoftware ATM Viewer -------------------------------------------- 2:25 - 2:45 afternoon break 2:45 - 3:10 Feature identification and reference (UUID) 3:10 - 3:30 Data processing standards - RTCA DO-200A/B update 3:30 - 4:00 Open slot (any proposals?) 4:00 closing 21

Contact Information www.aixm.aero www.aixm.aero/wiki Eddy Porosnicu (EUROCONTROL) eduard.porosnicu@eurocontrol.int +32 (2) 729-3326 Diana Young (FAA) diana.young@faa.gov +1 (202) 385-7445