If you’d like to reach SCS Engineers, Tracer Environmental Division

Slides:



Advertisements
Similar presentations
Risk Management and the Contractor’s Property Management System
Advertisements

SPCC PLAN OVERVIEW - SLIDE 1 OF 45 © Copyright SafetyInstruction 2008 SAFETY TRAINING CORPORATE SAFETY TRAINING © Copyright SafeyInstruction 2008 EPA 40.
Museum Presentation Intermuseum Conservation Association.
Course Material Overview of Process Safety Compliance with Standards
BLR’s Safety Training Presentations
Safety Driven Performance 2013
Hazard Prevention Program
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
North Carolina Chief 101 Firefighter Safety, OSHA and NFPA.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Process Safety Management for Biofuels 1.Overview of Process Safety 2.Compliance with standards 3.Process Hazard Analysis 4.Standard Operating Procedures.
Overview of Enforcement for Occupational Exposure to Tuberculosis (TB)
Jack Harrah Governor’s Office of Emergency Services
How to Implement the CalARP Program
Risk Management Program Quality Assurance Program Plan David R. Taylor US EPA Region 9 Quality Assurance Office.
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
Process Hazard Analysis Revalidations If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Modeling with CAMEO Les Benedict St. Regis Mohawk Tribe.
Laws and Regulations Laws and regulations are major tools for protecting people and the environment. Congress is responsible for passing laws that govern.
Developing a Chemical Risk Management Program
FPSC Safety, LLC ISO AUDIT.
Process Safety Management of Highly Hazardous & Explosive Chemicals Contractor Pre-Qualification, Emergency Preparedness, Incident Investigation, Audits.
PSM Covered Chemical Facilities National Emphasis Program.
Process Safety Management - Tips for the Little Guy.
Incident Reporting Procedure
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
EPA’s Initiative for Web-based RMP Submissions RMP*eSubmit.
■ This Training Module is designed to educate Management on FMCSA Compliance Review (CR).
Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.
Elements of Process Safety Management
Process Safety Management
Tim Date, Manager Risk Management Planning Unit
Hot Topics in CAA – 112(r) Federal Program Update GA AWMA REGULATORY UPDATE CONFERENCE Adam G. Sowatzka April 16, 2013.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
U.S. Department of Homeland Security Chemicals of Interest Anti-terrorism Standard.
OSHA Office of Training and Education 1 Hazard Communication.
Ert 312 LECTURE 4 OSHA & DOSH.
Clean Air Act Section 112(r) Federal Program Update U.S. EPA Pacific Southwest Region Emergency Prevention and Preparedness February 15, 2007 CUPA Training.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
IMPLEMENTING AN EFFECTIVE SAFETY PROGRAM What Am I Supposed To Do To Meet OSHA Standards?
Process Safety Management (PSM)
Lecture 2 ENGR. MARVIN JAY T. SERRANO Lecturer
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
Ergonomics Regulatory Requirements Bawan Saravanabawan, Labour Program, HRSDC February 4, 2008.
Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act State Emergency Response Commission Preparing for Facility Risk Management.
Division of Risk Management State of Florida Loss Prevention Program.
June Initially developed in 1983 to give employees a “right to know” Required a comprehensive hazard evaluation and communication process Chemical.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
Standards for Technical Educators Occupational Safety & Health.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Safety and Health Program Don Ebert- Risk Manager (509)
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Process Safety Management (PSM) and California Accidental Release Prevention (Cal ARP) Amendments Pre-Regulatory Process Federal Regional Response Team.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Lowell Randel Global Cold Chain Alliance/ International Institute of Ammonia Refrigeration.
Storage, Labeling, Controlled Medications Guidance Training CFR § (b)(2)(3)(d)(e) F431.
Slide 1 Standard Operating Procedures. Slide 2 Goal To review the standard operating procedures Creating the informed consent document Obtaining informed.
Incident Reporting And Investigation Program
Environmental Health and Safety (EH&S) Supplier Awareness Training
Process Safety R. Bruce Eldridge.
Incident Reporting And Investigation Program
Injury and Illness Prevention Program (IIPP)
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Understanding RAGAGEP for refineries
Presentation transcript:

Process Safety Management / Risk Management Program (PSM/RMP) Five-Year Revalidation HanhPhuc Nguyen If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at: Service@scsengineers.com

Overview Regulatory Review Five-Year Revalidation Process OSHA Process Safety Management (PSM) EPA Risk Management Program (RMP) General Duty Clause Five-Year Revalidation Process Process Hazard Analysis Hazard Assessment Risk Management e Submit (RMPeSubmit)

Regulatory Review There are two agencies that have chemical related safety and accident prevention regulations: Occupational Safety and Health Administration (OSHA) regulates PSM Environmental Protection Agency (EPA) enforces the RMP WRT Risk & Safety OSHA EPA has authority to bring administrative and judicial actions against violators. Judicial actions can be civil and criminal in nature. Penalties can be up to $25,000 per day for each violation. Worker Safety vs. Neighbor Safety

Regulatory Review OSHA PSM: EPA RMP: OSHA published the proposed standard - “Process Safety Management of Highly Hazardous Chemicals” in the Federal Register on July 17, 1990. The Federal PSM standard became effective on May 24, 1992. EPA RMP: 40 CFR Part 68, Chemical Accident Prevention Provisions, was published on June 21, 1996, requires facilities to develop a Risk Management Program to manage the potential risks associated with processes that use regulated substances. Existing facilities were required to comply by June 21, 1999.

Regulatory Review Applicability: Any facility that handles, stores, uses, or produces in excess of the threshold quantity of a listed regulated substance in any single process. A process is any group of interconnected vessels and separate vessels located such that a highly hazardous chemical could be involved in a potential release. Regulated Substance OSHA PSM EPA RMP Anhydrous Ammonia 10,000 lbs Aqueous Ammonia 15,000 lbs (≥44%) 20,000lbs (≥20%) Chlorine 1,500 lbs 2,500 lbs Sulfur Dioxide 1,000 lbs (liquid) 5,000 lbs (anhydrous)

Regulatory Overlap OSHA PSM EPA’S RMP PSI PHA SOPs Training Mechanical Integrity Contractors Employee Participation Compliance Audit PSSR MOC Incident Investigation Hot Work Emergency Plan Management Programs RMP*eSubmit Hazard Assessment EPA’S RMP

General Duty Clause Clean Air Act Amendments of 1990, Section 112(r) - General Duty Clause: Purpose and General Duty - It shall be the objective of the regulations and programs authorized under this subsection to prevent the accidental release and to minimize the consequences of any such release of any substances listed or any other extremely hazardous substance. Obligations Under General Duty Clause: identify hazards which may result from such releases using appropriate hazard assessment techniques; design and maintain a safe facility taking such steps as are necessary to prevent releases; and minimize the consequences of accidental releases which do occur.

General Duty Clause Occupational Safety & Health Act - General Duty Clause Section 5 (a)(1): “Each Employer shall furnish to each of his employees, employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees.” Suggested Minimum Strategy Conduct Hazard Review & Determine Off-Site Consequences Reference: EPA Guidance for Implementation of the General Duty Clause (550-F-09-002, March 2009)

Process Hazard Analysis Revalidation Purpose & Requirements What’s the purpose? Comply with the OSHA PSM [29 CFR 1910.119(e)(6)] and EPA RMP [40 CFR 68.67(f)] regulations. Ensure that the PHA is consistent with the current process. What are the requirements? Revalidate and update at least every five years after its initial or previous completion. Revalidation to be performed by a qualified team.

Process Hazard Analysis Revalidation Philosophy – To Re-do or Read Through? How should I decide? Thoroughness of the initial or previous PHA Did we re-do or read through five years ago? Who was present in the previous PHA? Changes to the process in the last five years – significant or minor?

Process Hazard Analysis Revalidation PHA Requirements OSHA Letter of Interpretation (June 28, 1998): “Employers must establish the scope and extent of their PHA updates and revalidations to include at least the following: evaluations of existing PHAs for accuracy and completeness using the criteria set forth in 1910.119(e)(3); checks to ensure that modifications to processes since the last PHAs have gone through management of change procedures or PHAs when required and that those changes are reflected in the PHAs; an evaluation of process safety information (PSI) to ensure that it is complete, current and accurate; verifications to ensure PHA specified procedures are adequate, up-to-date and are being implemented; determinations that existing PHA recommendations have been documented in their required respective areas such as PSI, PHAs, and procedures (operating, mechanical integrity, emergency response, etc.) and have been implemented; a review of all incident investigation reports required by 1910.119(m) to assure all affected PSI, procedures, training, etc., have been updated to reflect recommendations set forth in the subject reports and that appropriate information from those reports have been incorporated into the PHAs. Finally, OSHA intends that the PHA update and revalidation be documented.”

Process Hazard Analysis Revalidation Preparing for the PHA - Summary List any changes to the process in the last five years (i.e., MOC review). Verify accuracy of PSI: Piping diagrams Normal operating conditions Safety systems Ensure SOPs are current. Review implementation status of previous PHA recommendations. Review five year accident history / incident investigation records.

Process Hazard Analysis Revalidation Preparing for the PHA – RAGAGEP Define recognized and generally accepted good engineering practices (RAGAGEPs) used to design, operate, and maintain your process. Mechanical, Fire, and Building Codes Standards – ANSI/ASHRAE 15, ANSI/IIAR 2 Guidelines – IIAR Bulletins, Chlorine Institute Pamphlet, API Manufacturer’s Recommendations

Process Hazard Analysis Revalidation Preparing for the PHA – Selecting the PHA Methodology The PHA methodology must be: “appropriate to determine and evaluate the hazards of the process being analyzed.” [40 CFR 68.67(b) & 29 CFR 1910.119(e)(2)] What methodology did you use? What-If (IIAR Questions) Checklist What-If / Checklist HAZOP (Hazard & Operability Study) Failure Mode & Effects Analysis (FMEA) Fault-Tree Analysis “appropriate to the complexity of the process”

Process Hazard Analysis Revalidation PHA – Basic Methodology Identify hazards associated with the process Determine causes and consequences of each potential hazard Discuss any incidents (facility and/or industry) Identify administrative and engineering safeguards Determine risk ranking Postulate mitigation measures to reduce consequences and/or likelihood Consequences Frequency A: Frequent B: Periodical C: Occasional D: Possible E: Improbable I: Catastrophic 1 2 4 II: Severe 3 III: Moderate IV: Slight

Process Hazard Analysis Revalidation Preparing for the PHA – Who’s on your team? “The PHA shall be performed by a team with expertise in engineering and process operations, with at least one employee who has experience and knowledge specific to the process being analyzed. Also, one member of the team must be knowledgeable in the specific PHA methodology being used.” [40 CFR 68.67(d) & 29 CFR 1910.119(e)(4)] Design Engineers Operations and Maintenance Personnel Engineering/Design Contractor Safety / Environmental Management PHA Leader & Recorder

Process Hazard Analysis Revalidation Performing the PHA Ensure previous PHA adequately satisfied PHA requirements: Previous incidents Safeguards and the consequences of the safeguard failing. Engineering and administrative control relationships. Facility Siting Human Factors Qualitative Assessment of Frequency and Consequences

Process Hazard Analysis Revalidation Recommendation Tracking Develop a written schedule for completing action items. Assign responsibilities. Review status of recommendations and ensure progress is being made periodically. Document recommendation review meetings and actions taken to implement recommendations. Maintain evidence that shows progress or completion of action items. Review status/outcomes with operating, maintenance, and any other persons who are affected by the recommendations.

Process Hazard Analysis Revalidations Documentation All Process Hazard Analysis Study reports must be maintained for the life of the process. Including recommendation resolution. Sign In Sheets. Piping Diagrams from the date of the study. Team Leader Qualifications. Methodology. Regulatory Invites as applicable.

Hazard Assessment Hazard Assessment regulatory notations: EPA: 40CFR § 68.20 – 68.42 Hazard Assessment Update Requirements: “The owner or operator shall review and update the off-site consequence analysis at least once every five years.” Also, if changes to the process which “might reasonably be expected to increase or decrease the distance to the endpoint by a factor of two or more”, the Hazard Assessment shall be revised with the results being submitted in a revised RMP.

Hazard Assessment Elements Off-Site Consequence Analysis (OCA) Identify the worst-case release for each regulated substance; Identify the alternative release scenario for each regulated substance; Define the areas of potential off-site impacts for worst-case release and alternative release scenarios; Identify affected population, public receptors, and environmental receptors within worst-case and alternative release scenario impact regions. Five-Year Accident History

Hazard Assessment Worst Case Release Scenario Determine released amount used in the modeling (Maximum capacity of Largest Vessel / Maximum intended inventory of regulated substance) Review passive mitigation measures (vessel located in an enclosure or outside?) Review assumptions and modeling technique (the use of EPA Guidance documents is suggested)

Hazard Assessment Alternative Release Scenario Review Accident History – Have there been any releases or near releases at your facility that fit the definition of Alternate Release? Must be more likely to occur than the worst case Must reach an endpoint offsite (unless no such scenario exists) Review passive and active mitigation measures considered (room ventilation, water diffusion tank, automatic shut offs [safety cutouts, high level shut downs], etc.) Review assumptions and modeling technique (the use of EPA Guidance documents is suggested)

Hazard Assessment Off-site Impacts Residential Population Most Recent Census Data References: Marlplot Public Libraries Local government offices or planning commissions Public schools, hospitals, daycare centers, prisons, parks/recreational areas, and major commercial office, and industrial buildings. On-site facilities to which the public has routine and unrestricted access. Environmental National or state parks, forests, or monuments; Officially designated wildlife sanctuaries, preserves, refuges, or areas; Federal wilderness areas. Data Sources US Geological Survey Maps (USGS) Data sources containing USGS data.

Qualifications for Five-Year Accident History The EPA’s Risk Management Program (40 CFR § 68.42(a))[2] Five-Year Accident History reporting requirement: “The owner or operator shall include in the five-year accident history all accidental released from covered processes that resulted in deaths, injuries, or significant property damage on site, or known offsite deaths, injuries, evacuations, sheltering in place, property damage, or environmental damage.”

Hazard Assessment Five-Year Accident History Data Required: Date, time, and approximate duration of the release; Chemicals released; Estimated quantity released in pounds; Type of release event and its source (gas release, liquid spill, fire, explosion); Release source (storage vessel, piping, process vessel, transfer hose, valve, pump); Weather Conditions (if known) (temperature, wind speed/direction, stability class, precipitation); On-site impacts (number of deaths, injuries, property damage);

Hazard Assessment Update Tips No change in chemical inventory / capacity of largest vessel and no incident history meets the Alternative Release definition and existing scenario is valid  VERIFY dispersion calculations previously completed Update Maps & Population Update Sensitive Receptors lists 2010 US Census was released!!!

Risk Management Plan Risk Management Plan regulatory notations: EPA: 40CFR § 68.150 – 68.190 RMP*eSubmit data elements submitted to EPA

EPA Risk Management Plans Historically were submitted via 3.5” floppy diskette; now via internet (RMP*eSubmit on EPA’s CDX website). Following your submittal, Keep the letter issued by EPA! It includes your next 5 year re-submission due date along with your unique facility ID #

Risk Management Plan Update Requirements “At least once every five years from the date of its initial submission or most recent update.” Within 6 months of a change that requires a revised PHA or Hazard Review. Within 6 months of a change that requires a revised off-site consequence analysis. Within 30 days of a change in the owner or operator of the facility.

Risk Management Plan Corrections Within 6 months of an applicable accidental release Within 30 days of a change to the Emergency Contact Information (see section 1.8 of the RMP*Submit) Changes to the chemical process: revise the PSM/RMP program documentation no later than 60 days after the modifications.

Risk Management Plan Submitting to EPA No hard copy submittal as of January 2010. EPA’s RMP*eSubmit Software Online submittal on EPA’s Central Data Exchange system (https://cdx.epa.gov ) Standard user ID and password protocols Electronic Signature Agreement Ability to access / update your submission on line at any time Due every 5 years Reference: EPA Risk Management Plan RMP*Submit Users’ Manual, EPA 555-B-09-001, September 2009.

Questions and Answers