Modifications to baseline proposal PH-DT Engineering Office, CERN 27/04/2015 Page 1 CERN, April 2015.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Structural Steel Construction
BEAMS (FLEXURE) BEAM- COLUMNS SHEAR / CONC. LOADS
Today’s Objectives: Students will be able to:
1 Chapter 7 Length of flange Introduction As the bending moment decreases towards the support, the flange plate may be varied and a smaller flange.
Finding Errors in Structural Designs How is it Typically Done? James Hanson, Ph.D., P.E. Rose-Hulman Institute of Technology Voted #1 Eight Consecutive.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Compression Members. Compression Members: Structural elements subjected only to axial compressive forces Stress:Uniform over entire cross section.
Chapter 5 Fatigue.
PH-DT Engineering Office, CERN
CM 197 Mechanics of Materials Chap 20: Connections
Professor Joe Greene CSU, CHICO
The WA105 17m3 LArCryostat pre-experience M.Ne. Status Tender done for the membrane part, 1 German firm selected A lot of time wasted to renegotiate the.
CON 4003, CVE 4073, CVE 5073 Construction Estimating Prof R. V. Locurcio, PE.
STEEL FRAMED STRUCTURES Steel is a material which has excellent structural properties. It has high strength in tension and compression. It is the strongest.
Footings.
Chapter 10 Web splice.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Problem-1 A section of commercial steel shafting 2.0 m long between bearings carries a 1000 N pulley at its midpoint, as shown in Figure. The pulley is.
1 GLD Surface Assembly Y. Sugimoto KEK
Multiple Coil Lift Calculation. Purposes of the Study  To investigate the stress distribution in the MCWF and the lifting device.  To make sure mounting.
Fermilab requirements and recent FEA Analyses PH-DT Engineering Office, CERN 06/05/2015 Page 1 CERN, May 6th 2015.
OK, now my favorite subject: RPCs in a shipping container
BEAMS AND COLUMNS PRESENTED BY K.ROSHIN RUKSHANA.
TOPICS COVERED Building Configuration Response of Concrete Buildings
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
Tulkarem Multipurpose Sport Hall Prepared by: Moatasem Ghanim Abdul-Rahman Alsaabneh Malek Salatneh Supervisor: Dr. Shaker Albitar.
Mechanics of Materials – MAE 243 (Section 002) Spring 2008 Dr. Konstantinos A. Sierros.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
C. C. Fu, Ph.D., P.E. The BEST Center
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
Mechanical Designs of The Central Detector Jinyu Fu
IN MODULAR CONSTRUCTIONS
HiRadMat box relative to beam position and vertical lift table.
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Beam Design Beams are designed to safely support the design loads.
PCS900 AccuGrade 3D Paving Training 3D Design Models & SVO/AGO & TBC
CESL Hotel Unique – Toronto Chris O’Brien Eric Fraser Scotia Mabury
Fork and Pallet Design Hans Jostlein March 13, 2007.
Status of report on chapter 6: Warm cryostat mechanical calculation PH-DT Engineering Office, CERN Page 1 CERN, May 20th 2015.
Warm cryostat mechanical calculations A.Catinaccio PH-DT Engineering Office, CERN Page 1 CERN, May 27th 2015.
EC3 VERIFICATION SCIAENG® EC3 VERIFICATION SCIAENG® SPECIAL THANKS TO ALL INVOLVED D. ALVAREZ FEITO J.C. BATISTA LOPES C. BAULT O. BELTRAMELLO A.CATINACCIO.
Structural Systems Design for a Laramie Office Building
Preliminary FEA Results PH-DT Engineering Office, CERN 24/04/2015 Page 1 CERN, April 2015.
Steel construction highlights
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
Epument Girder simulation and Module Showroom upgrade For CLIC meeting 2015 Petri Tikka, Helsinki Institute of Physics focusing on exploring the possibilities.
1 Building Design Progress Dan Wilcox March 2012.
2016 Construction & Materials Specifications
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
LBNF CAD models, Drawings and Component list
Roadmap for triplet cryostats
INSTALLATION SEQUENCE
Structures-Trusses.
SiD Muon Yoke Structure - Deformation Studies -
Marco Andreini, Raul Fernandez Ortega, Richard Francis Morton
TPC Support and Constraint TPC Support
- BEAM Sinusoidal Web Beam
Bridge Project: Team Truss-Arch
COLUMNS SLIDE SHOW.
The Eurocode approach to partial safety factors
RDR Baseline Layouts for Interaction Region
Fire Resistance of Steel Structures
Mitre III Building McLean VA Debra Schroeder Structural Option.
Mechanics of Materials Engr 350 – Lecture 38 Columns
Presentation transcript:

Modifications to baseline proposal PH-DT Engineering Office, CERN 27/04/2015 Page 1 CERN, April 2015

Modified pitch and main beams Current baseline design doesn’t match with requirements as: –Crane capacity exceeded (beams of 977 kg/m = 17 tons for 17.4 m length; crane capacity 10 tons) –Profiles are non-standard: composed girders are subject to strength capacity penalties –Splicing seems rather critical; size of possible preassembled corner joints limited by shaft size Alternative: more frequent and lighter standard beams (at shorter pitch of 1.6 m) Page 2 24/04/2015

Similar beam (bridge) constructions Page 3 24/04/2015

Advantages … if it works Main beams are available off the shelf profiles and hot rolled –This can be a very important requirement for the review ! –No capacity penalty as from composed/welded girders –Beam class is rather good – beams are available in different steel grades – HL 1100 x 607: confidence it could work (work is restarting on those) – HL 1100 x 548: first verifications shows it may work as well (TBC) Beam weigh within crane capacity (10 tons): – HL 1100 x 607: the longest vertical beams will (almost) cope the crane capacity: 607 kg x 17.4 m = tons – HL 1100 x 548: 548 kg x 17.4 m = 9.5 tons  OK for crane Both new beams (at new pitch) give some total weigh gain: – HL 1100 x 607: 37 units (instead of 25): (37*10.56)/(25*17)=8% – HL 1100 x 548: 17% – Plus saving on 1 grid vertical beam / unit cell More uniform pressure distribution on shorter grid (less bulging out) Moment connection at base better distributed Room left between main belts for access and inspection New beam profiles are slightly smaller in high (OK for cavern) Page 4 24/04/2015

Shortcomings A new iteration on verifications is still required Manholes may force to adopt the heaviest of the two new beams proposed Some increase in the number of (bolted) joints at base and grid/belts connections Final unit beam weight will increase due to the above. Page 5 24/04/2015

Work Ahead –There is still a lot of work required for the review, and the current baseline does not cope with some main requirements (as mentioned earlier): –We need to propose a solution without major flaws in which we have reasonable confidence. –No time available x alternative design: this modification does not affect much the previous baseline design proposed and leaves time later for optimisation. –Urgent no to cover the work still ahead for the review: Still some verifications by FEA Eurocode verifications (joints, beam capacity, stability, Scia complete model) All design work: 3D model, members, joints, all details : LOT OF WORK THAT MUST START All assembly / installation scenarios to be studies and documented Page 6 24/04/2015

Page 7 24/04/2015

Steel Grades Steel S355 (EC properties for t>40mm) –σ y =335 MPa → σ y /1.5=223 MPa –UTS=470 MPa → UTS/3.5=134 MPa Small Improvements by moving to S450 (EC properties for t>40mm): –σ y =410 MPa → σ y /1.5=273.3 MPa –UTS=550 MPa → UTS/3.5=157 MPa Page 8 24/04/2015

Page 9 24/04/2015

Page 10 24/04/2015

Page 11 24/04/2015

Page 12 24/04/2015

Page 13 24/04/2015

Page 14 24/04/2015

Page 15 24/04/2015

Page 16 24/04/2015