B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Southern Intertie Discussion.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Convergence Bidding Overview Margaret Miller Manager, Market Design & Regulatory Policy CPUC Convergence Bidding Workshop August 26, 2010.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
1 Managing Revenues in Regulated Industries Rate Design May 2008 Richard Soderman Director-Legislative Policy and Strategy.
The Use of Oligopoly Equilibrium for Economic and Policy Applications Jim Bushnell, UC Energy Institute and Haas School of Business.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
Chapter 41 Chapter 10 Strategic Cost Management. 2 Definition Strategic Cost Management: Supply chain partners working together to identify design changes,
Foreign Exchange Chapter 11 Copyright © 2009 South-Western, a division of Cengage Learning. All rights reserved.
Kinney ● Raiborn Cost Accounting: Foundations and Evolutions, 9e © 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated,
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Small Farm Profitability: Is Wind Energy the Answer? 1
Boundaries of a Good Price
Working together. Achieving results. CPUC Recycled Water OIR (R ) Workshop 3: Recycled Water Costs/Rates Water IOU Panel General Principles January.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
11 Why BPA Transmission Customers Aggregate Reservations Feb. 20, 2013.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
On Target Group Coaching
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
IE 475 Advanced Manufacturing Costing Techniques
Political Winds, Financing Constraints and Pharmaceutical Innovation Joshua Linn (UIC) and Robert Kaestner (UIC and NBER) November 9, 2007 Presentation.
Capital Budgeting Decisions
Technology preparation and conclusion of foreign trade turnover. Selection of the foreign partner..
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Operating and Financial Leverage 5.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
PACIFIC NORTHWEST & ALASKA RISK MANAGEMENT EDUCATION REGIONAL CONFERENCE March Spokane, Washington.
MY HOUSE – HOUSE # 1 HOUSE # 2 YOUR HOUSE –HOUSE # 3.
Operating and Financial Leverage 5 Chapter Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
© 2008 Morningstar, Inc. All rights reserved. 3/1/2008 LCN Portfolio Performance.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Classification of Costs Lecture No.
Bulk Power Transmission System
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
CHAPTER Foreign Currency Transactions Fundamentals of Advanced Accounting 1 st Edition Fischer, Taylor, and Cheng 6 6.
DEVELOPING A BUSINESS PLAN:
Wyoming Pipeline Authority October 28, 2003 Mark Quinlan Director Marketing. Mark Quinlan Director Marketing.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
Sales forecast Assets required to support sales Required assets -Existing assets = Required investment Investment Module Total assets > Total liabilities.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
Eugene Water & Electric Board. Dave Churchman Manager, Power Operations Eugene Water & Electric Board.
Liquidity & Reserve Management Strategies & Policies
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
Capacity Planning Pertemuan 04
New Large Single Loads and Economic Development Considerations Draft Assessment.
Pre-decisional page 1 (for discussion only) Roy Fox, BPA Enterprise Risk Manager January 28, 2005 Fish Cost Components Workshop PBL Rate Case Risks and.
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Energy Export Scheme? Contractual and Commercial Elements of Hydrocarbon Exports-What Can Be Taken Over to a Renewable Renewable Energy Workshop, Casablanca,
Chapter 8 Quantity and Inventory ©McGraw-Hill Education. All rights reserved.
Chapter 4 Measurement PowerPoint Presentation by Matthew Tilling ©2012 John Wiley & Sons Australia Ltd.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Chapter 3 Basic Cost Concepts McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. 3-3 Learning Objectives Explain the cost.
Visual 3-1 Sales and Operations Planning Purpose of Sales and Operations Planning General Design of Sales and Operations Planning Approaches to Sales and.
Operating and Financial Leverage
ColumbiaGrid Summary of: COI Utilization Report dated May 4, 2011
Flexible Forward Contracts for Renewable Energy Generators
Electricity Procurement Options
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Operating and Financial Leverage
Stevenson 5 Capacity Planning.
GENESYS Current Functionality
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Maine's Standard Offer Service
Presentation transcript:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Southern Intertie Discussion

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Agenda  BPA’s approach to Intertie issues raised by Powerex  Effects on PF Rate  Revenue Potential from Increased COB Market Value  Potential non-rates options 2

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 BPA’s approach to Intertie issues raised by Powerex  Presented as CAISO capturing a larger share of the intertie value through DA market policies Analysis is complicated by water conditions and market changes  Developed into transmission design questions Does Hourly Non-Firm rate design provide correct incentives to commit to long term investment? rate formula contains inaccurate assumptions of HNF use – “Existing rate formula contains inaccurate assumptions of HNF use on Southern Intertie” – Powerex proposal to TX Rates Workshop Do Transmission policies artificially limit Long Term Firm resale market? 3

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Effect is driven by competition between Firm and Non-Firm TX Mid C = $20 NP15 = $40 Non-Firm User Bid = $20 + $3.25 NF TX Firm Holder Bid = $?? CA Internal Gen Bid = $40 Firm Holder Bid = $?? + Cong NW CA 4 Our focus is on competition between BPA Firm and Non-Firm Products; Changes would drive customers towards LTF resale market.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Effects on PF Rates in the BP-16 Rate Case  Changing the Southern Intertie Non-Firm Transmission Rate has no impact on the PF Rate in BP-16.  The electricity prices used to estimate surplus energy revenues and power purchase expenses are not changed for the following reasons: The production cost model (AURORA) used to calculate the prices received when BPA-P makes surplus energy sales and power purchases models the WECC wholesale energy market as though it is operated by a single ISO. It does not deal with the issue of who gets what portion of the price spreads at various locations due to seams, market design, and market power issues. It also does not deal with the issue of the price differentials that accrue to firm versus non-firm transmission purchasers. The prices that BPA-P use for calculating its surplus energy revenues and power purchase expenses are all based on these sales and purchases being made at Mid-C prices. Changes to the Southern Intertie Non-Firm Transmission Rate will not have an impact on the Mid-C prices. 5

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Effects on PF Rates in the BP-16 Rate Case (cont.)  The BPA-P transmission and ancillary services expenses are not changed because all surplus energy sales and power purchases are assumed to be made at Mid-C.  If changing the Southern Intertie Nonfirm Transmission Rate requires that the Network Nonfirm Transmission Rate also be changed, then the BPA-P transmission and ancillary services expenses used in the PF rate calculations will increase to the extent that sales volumes exceed the BPA- P firm network transmission under contract.  The bottom line financial outcome of changing the Southern Intertie Nonfirm Transmission Rate involves the net revenue impact of the increases in BPA-P surplus energy revenues versus the increases in transmission and ancillary services expenses in actual operations, which impact the level of BPA-P cash reserves. 6

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, BPAP Revenue Potential from Increased COB Market Value  Under a “equal value” COB market, potential BPAP revenue increase estimated at $7 – $13 million/yr, depending on utilization levels  We used historical BPAP utilization levels and a high utilization level.  Historical levels fluctuate year to year due to changes in water conditions, marketing strategies’ objectives and value proposition between the regions, including market design implications Additional BPAP Revenue in theoretical “Equal Value” market under Average and High Transmission Utilization Scenarios

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10,  NP15 and MidC indices are ICE flat forward indices representing current forward market value  ‘Low Value COB’ forward index constructed based on monthly historical relationships between NP15, MidC and COB ‘Equal Value COB’ represents midway point between MidC and NP15  Ave transmission utilization scenario based on historical BPAP transmission utilization rates over past 3 yrs High transmission utilization scenario assumes 90% TU in all months Notes about this analysis:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 BPAP Transmission Utilization  In order to estimate the revenue impact to BPAP if an ‘equal value’ COB market were captured, a transmission utilization assumption had to be made  BPA-P Transmission utilization can vary widely due to a number of factors (some in our control, other are not): Water year and seasonal variation Marketing strategies which allocate surplus to different markets (sales into CAISO, bilateral deals and RFPs, quantity of forward, DA and RT sales, etc) Long-term contracts with varying deliveries Changes in CAISO rules and regulations  The chart below illustrates how much one component of our intertie utilization (sales into CAISO) can vary with water year and advent of new initiatives in CA (i.e., CARB) 9

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Potential non-rates options to strengthen Southern Intertie LTF resale market

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Potential non-rates options to strengthen resale market  Proposed for consideration: Allow normal tags to encumber transmission using the transmission profile instead of the energy profile when calculating ATC (similar to capacity and dynamic tags) Only release nonfirm at T-60 Only sell nonfirm if there is insufficient LTF available for resell on OASIS  Benefits: Directly effects firm and non firm competition Solutions would be developed outside of rates process  Risks: Need to protect against transmission hoarding Requires strong LTF resale market Options could require significant systems changes 11