Best Practices: Pre-Use Inspection of Rubber Protective Equipment.

Slides:



Advertisements
Similar presentations
Hazards Of Electricity
Advertisements

Electrical Safety.
Murray State University
Best Practices: Rubber Insulating Gloves and Sleeves while Performing Distribution Power Line Tasks via the Live Line Tool Method.
1 HYDROSTATIC TESTING Approved for Public Release.
: Electrical Protective Equipment
Last revised March 19, 2015 Electrical Department – EQUAL CODE: EL304 Care, Use, and Maintenance of Rubber Insulating Gloves.
You will learn about… Isolating Circuits Testing Circuits
Practice Statement The effective use of Isolate and Insulate equipment and procedures to provide the necessary level of safety when performing Live Line.
Electrical Safety.
 PPE has proven time and time again that it not only can, but DOES work!  If it is USED, taken care of, treated properly, and inspected regularly, it.
Personal Protective Equipment An Employee Awareness & Training Course
Best Practices.
General Industry Standards Personal Protective Equipment.
Module 3: PPE 3.3 Training Susan Harwood Grant Number SH F-23.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – September 2012 eere.energy.gov In-Progress Monitoring and Inspecting QUALITY CONTROL INSPECTOR.
Best Practices: Safety at Heights – Wood Poles. Practice Statement Fall Protection Equipment (FPE) shall be used when ascending, descending, changing.
UTITLITY LINE TECHNICIAN Pole Climbing UTIL 1010.
California Association of Realtors OPERATORS OF CALIFORNIA.
Best Practices: Cradle-to-Cradle Use of Insulating Rubber Gloves and Sleeves.
ACADs (08-006) Covered Keywords Rigging, hoist, crane. Description Supporting Material b.
Best Practices: Job Briefings. Practice Statement Provides a uniform methodology and outlines key components of job briefings.
US-EU CONFERENCE 2015 September 18, Executive Committee Representatives Bill Koertner President & CEO 2 Jeff Thiede President & CEO
Best Practices: Safety at Heights – Aerial Work on Lattice Structures.
Best Practices: Qualified Observer. Practice Statement Identify and utilize qualified observer for critical tasks.
Safety on Call ELECTRICAL SAFETY. Safety on Call YOU WILL LEARN ABOUT Hazards of Electricity Isolating Circuits Testing Circuits Work on Energized Equipment.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
PPE: Personal Protective Equipment It protects against accidents.
Best Practices: Insulate & Isolate Safety Performance Check.
Working On or Near Energized Conductors and FR Clothing.
Important Elements of Conducting an Effective Tailboard Meeting OSHA 29 CFR PART (c)
Manufacturing 120 Industrial Safety and CPR Bruce Poole Sean Howard (IBEST Instructor)
1 Insulate & Isolate Continuing Education Second Quarter 2016.
11 Rubber gloves and sleeves are a lineman’s first and foremost defense against electrocution For this reason rubber gloves and sleeves must be physically.
General Laboratory & Practical Work Safety Guidelines
NOVAX INSULATING GLOVES
Goodyear Napanee Contractor Safety
Important Elements of Conducting an Effective Tailboard Meeting
Personal Protective Equipment (PPE)
Murray State University
Best Practices: Administrative Controls
A 3 Insulator Changeout with Jib
C 4 Insulator Changeout With Hoists
Protective Grounding Single Phase Tangent
Personal Protective Equipment (PPE)
Making sure our lineman get home Safe
C5.21L Three Phase Dead End Insulator Changeout
C3 Insulator Changeout With Jib
A1 Pole Changeout Energized
URD Radial Feed Transformer Changeout
Adding an A5 tap to an A1 © 2018 Iowa Association of Electric Cooperatives DISCLAIMER: This job hazard analysis (JHA) has been made available for informational.
A 3 Insulator Changeout with Jib
C3 Insulator Changeout With Hoists
A5 Insulator Change Transformer Pole
A2 Pole Changeout Energized
A1 Pole Changeout Energized
A 3 Insulator Changeout with Jib
A1 Insulator Changeout Energized
Protective Grounding Single Phase Tangent
A5 Insulator Change Transformer Pole
Personal Protective Equipment (PPE)
Adding an A5 tap to an A1 © 2018 Iowa Association of Electric Cooperatives.
Wye/Delta 120/240 4 wire Transformer Bank
A2 Insulator Changeout Energized
C1 Insulator Changeout © 2018 Iowa Association of Electric Cooperatives.
Single Phase Pole Mounted
Click to start.. Click to start. Avoid the Hazards of Hot Work For The Oil & Gas Industry Avoid the Hazards of Hot Work SAFETY TALKS! © MMVI Bongarde.
A1 Insulator Changeout Energized
Personal Protective Equipment (PPE)
Presentation transcript:

Best Practices: Pre-Use Inspection of Rubber Protective Equipment

Practice Statement Protocols related to the effective inspection of insulating protective equipment.

Practice Description Inspected for: Damage Wear Contamination Applicable service dates must be observed.

Practice Description (cont’d) Upon inspection, if equipment is found to be defective, the equipment will be Identified Removed from service

Provides for uniform inspection guidelines that can be applied industry wide. Benefits

References ASTM F Standard Specification for In- Service Care of Insulating Line Hose and Covers ASTM F Standard Specification for In- Service Care of Insulating Blankets ASTM F Standard Specification for In- Service Care of Insulating Gloves and Sleeves

References (cont’d) ASTM F Standard Guide for Visual Inspection of Electrical Protective Rubber Products National Electric Safety Code (NESC, ANSI C2- Part 4)

FAQ’s Who does this inspection? A qualified crew member shall perform a pre-use prior to each time insulating rubber goods are used. Why are there two dates on insulating rubber gloves? One is the test date, and where applicable, there will be an issue date.

FAQ’s (cont’d) Which date should I use? This will depend on the contractor and state that you are working in. If you are not sure, you should ask your supervisor.

The ETD Partnership