California Energy Commission www.energy.ca.gov Draft Rate Scenario Model Methodology DAWG Forecasting Subgroup Sept. 11, 2014 Lynn Marshall Supply Analysis.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

1 Illustrative Results Based on E3’s Avoided Cost Model Thursday, April 19, 2012 Marginal Generation Costs.
California Energy Commission Customer-side Distributed Generation Impacts CED 2013 Preliminary Demand Analysis Working Group DG PUP June.
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
California Energy Commission North American Market Gas-trade (NAMGas) Model: Key Drivers and Structure 2015 Integrated Energy Policy Report California.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
California Energy Commission Role of Codes and Standards and Energy Procurement Planning in Determining Baseline Chris Kavalec, Demand Analysis Office.
Capacity Valuation.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Renewable Net Short.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Resource Adequacy Forecast Adjustment(s) Allocation Methodology
California Energy Commission Integrated Energy Policy Report Lead Commissioner Workshop: Preliminary Results Natural Gas Common Cases California Energy.
California Energy Commission End-User Natural Gas Forecast for California May 21, 2015 Chris Kavalec Energy Assessments Division
California Energy Commission Retail Electric Rate Projections: Preliminary Cases 2015 Integrated Energy Policy Report California Energy Commission July.
California Energy Commission 2015 California Energy Demand Electricity and Natural Gas Demand Forecast: Inputs and Assumptions February 26, 2015 Chris.
FORECASTING PERFORMANCE Presented by: Teerachai Supojchalermkwan Krisna Soonsawad Chapter 11.
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
Avoided Costs of Generation
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
1 CPUC Avoided Cost Workshop Introduction and Overview.
California Energy Commission California Energy Demand Preliminary Electricity Forecast July 7, 2015 Chris Kavalec Energy Assessments Division.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 4, 2005.
1 Energy Division Workshops: LTPP Planning Standards (Part 1) & Procurement Rulebook June 11, 2010 Workshop R , Tracks 1, 2, & 3.
Energy Division Organization Division Director, Edward Randolph Demand Side Management Group Demand Side Programs Simon Baker Residential Hazlyn Fortune.
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
California Energy Commission Integrated Energy Policy Report Commissioner Workshop: Revised Results Natural Gas Common Cases September 21, 2015 Leon D.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
California Energy Commission California Energy Demand Revised Electricity Forecast December 17, 2015 Chris Kavalec Energy Assessments Division.
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 12/17/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 2/26/15 Asish Gautam Demand Analysis Office Energy Assessments Division.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Overview of RPU 2014 Power Supply Integrated Resource Plan RPU Power Resources.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
LNBA Subgroup: Avoided Transmission Value
Bypass Distributed Generation (DG) Forecast Methodology
Self-Generation Forecast CED 2017 Preliminary
SEIA Perspective on Marginal/Avoided CAISO Transmission Costs
/ California Energy Demand (CED) 2011 Revised Electricity and Natural Gas Forecast SCE February 7, 2012 Chris.
/ California Energy Demand (CED) 2011 Revised Electricity and Natural Gas Forecast February 3, 2012 Chris.
Mike Jaske California Energy Commission
Preliminary Electricity Rate and Time of Use Rate Scenarios
California Energy Demand (CED) IEPR Forecast:
California Energy Demand Electricity Forecast (CED 2014) Update: Method and Summary of Results November 5, 2014 Chris Kavalec Demand Analysis.
/ California Energy Demand (CED) 2011 Revised Electricity and Natural Gas Forecast PG&E February 7, 2012.
Revised Electric Rate Scenarios:
SDG&E Procurement Perspective IEPA 35th Annual Meeting September 21st, 2016 Dan Skopec Vice President, Regulatory Affairs Sempra Energy Utilities.
City of Lebanon, Missouri Electric Department
Resource Adequacy Demand Forecast Coincidence Adjustments
Introduction to Growth Scenario Working Group
California Transportation Electrification Activities
Presentation transcript:

California Energy Commission Draft Rate Scenario Model Methodology DAWG Forecasting Subgroup Sept. 11, 2014 Lynn Marshall Supply Analysis Office Assessments Division /

Why we are here CEC staff is developing a model for developing retail electric rate scenarios First application will be to support 2015 IEPR demand/supply analysis cycle Have not had internal tool where we could understand what’s in the rate or driving the rate. DAWG comments requested on o Proposed model structure o Methodology incorporating price effects o Interactions with other proceedings? o Data sources we should use? California Energy Commission

Background on Ratemaking Revenue Requirement = Rate Base*Rate of Return + Operating & program costs + depreciation expense +utility incentives + taxes Rate Base = Capital Stock– Accumulated Depreciation+ working cash +inventory Operating costs include generation, transmission, distribution o ERRA Procurement and program costs are “passed through” o GRC costs are embedded and not trued up. Rate of Return set by CPUC – varies with economic conditions Class Average Rate = Class Cost Allocation Share* Revenue Requirement / Sales Cost allocation shares based on marginal cost of serving the class for various elements of cost of service (energy, capacity, distribution, customer service, transmission) Marginal cost varies by TOU period California Energy Commission

High Level Perspective on IOU Revenue Requirements Example using PG&E 2015 Annual Electric True-Up and GRC Decision Tables California Energy Commission Source: PG&E Advice 4484-E and 2014 CPUC General Rate Case D Decision Tables Revision 2, Appendix C.

Staff criteria: what do we want in a model? The ability to assess interactive effects of energy usage, operating costs, cost allocation, rate design, and revenue requirements. The ability to model California market characteristics, policies, plans and scenarios (LTTP, RPS, TPP, AB 32, RA) Transparency: o Model individual components of rates to allow easier evaluation. o POU v. IOU; bundled v. ESP rates. Flexibility to adapt to evolving rate or market design and allow stochastic analyses Leverage analysis from, and interface efficiently with, other state and CEC tools and processes including the LTPP, RPS calculator, TPP, Cost of Generation model, PLEXOS, and NamGas. Generation by technology type Some costs and rates by TOU/LOLP time periods California Energy Commission

CEC Demand Forecast Modeling Interactions o Support and be consistent with the state demand forecast development. Needed output:  annual average rates by sector and utility forecast area, so need to translate from classes to sectors.  IOU rates need to be compiled with public utility rates.  support distributed resource and transportation demand analysis. o Incorporate future analysis on load shape trends. o Account for effects of TOU rates. o Model common econ/demo and other scenario assumptions California Energy Commission

Modeling Approach California Energy Commission Dynamic, simultaneous equation simulation o Annual time step, with TOU detail for some elements. Structural equations define sales, capital additions, operating costs and other elements of revenue requirement solved using the SAS Proc Model procedure. o Allows estimation, simulation, and forecasting of nonlinear simultaneous equation models. o Variance structure from internal or externally estimated variables can be incorporated for stochastic analysis. Treat major long run investments (LTPP, TPP) as fixed per planning decisions, and load-related short run operational costs (such as energy purchases, portions of distribution operations) as endogenous Post process to translate to real, sector rates, NEM 2.0, and iterate with self gen model

High Level Equation Summary California Energy Commission

Incorporating CEC Econometric models California Energy Commission Demand Office estimates econometric models for residential, commercial, industrial, resource, and TCU as a function of average annual rates and economic and demographic drivers. Incorporate parameter estimates, including price elasticity, and calibrate to recorded utility distribution area usage. Econometric models are estimated statewide by sector; need to adapt to utility area and class; account for direct access How to capture residential TOU rate effects on sales and usage?

Residential Usage and TOU Rates Apply constant elasticity of substitution (CES) approach (as in statewide pricing pilot) Disaggregate the annual forecast to summer and winter Decompose seasonal usage into TOU periods and apply substitution elasticity The substitution equation models the ratio of peak to off-peak quantities as a function of the ratio of peak to off-peak prices and other factors. The seasonal energy usage modeled as a function of average price and other factors. But assumptions and effects depend heavily on program design and effectiveness. External analysis on TOU design could be incorporated Other considerations Fixed charges could lower marginal rates Marginal cost-based revenue allocations could change with o Load shapes o Hourly Market prices, technology mix California Energy Commission

Residential Usage and TOU Rates California Energy Commission

ERRA Procurement Costs Existing contracts: Use CEC Plexos output to estimate output trends of conventional resources by resource or resource type; reconcile with utilty-level historic data and IEPR supply forms Current Renewable: Combine RPS procurement report data on forecasted energy production and costs by generation technology with LTPP RPS scenarios to fill net short. Forecasting : Estimate new authorizations – LTPP scenarios; COG costs Forecast future renewables costs using CEC cost of generation model Residual market and capacity purchases: Use standard GRC/Avoided Costs methodologies for pricing market energy and capacity purchases; CEC COG, NamGas, Plexos inputs Track “New Gen/Local Gen” costs for cost allocation to direct access Fuel costs: CEC NamGas forecast GHG costs: CEC GHG forecast o indirect cost impact on market prices o Direct costs from natural gas generation, CHP, imports California Energy Commission

ERRA Procurement Costs California Energy Commission

Distribution Costs Major drivers of distribution capital and operation costs: Customer growth - housing starts, floorspace Design demand – noncoincident peak Interconnections Ongoing reliability upgrades & maintenance –forecast in line with historic trends But… Expanded Distributed Energy Resources? (DER) Forthcoming work to develop distribution cost scenarios: CEC pilot study on cost-effective strategies for integrating DER CEC tech support to develop base scenario assumptions and methods CPUC proceeding on IOU Distribution Resource Plan Proposals in 2015 Other resources or suggestions for modeling? California Energy Commission

FERC Transmission Major projects known well in advance from CAISO TPP Renewables integration Reliability additions are ongoing CAISO publishes TAC area charge forecast model with forecast of projects in current transmission plan and total revenue requirements The model makes some simplified escalation assumptions Low voltage planned and in progress IOU transmission projects are reported in each PTO’s five year forecast on FERC Form 730. CEC will undertake further analysis on capital additions, costs and scenario assumptions as part of tech support work. California Energy Commission

Generation GRC Generation O&M Utility Owned Resources (SCE peakers, PG&E Hydro, solar) Energy production based on common scenarios and CEC Plexos output (shape) Estimate costs based on forecasted profile and cost trends. Generation Capital Expenditures Assume no new IOU-owned generation unless specifically authorized Upgrades, maintenance on existing resources continue in line with historic trends California Energy Commission

Next Steps Further comments and suggestions requested to Lynn Demand Forecast “input” workshop in February with preliminary results IEPR scenarios will incorporate current econometric analysis, common scenario assumptions, CPUC decisions, data from utility supply and demand forms for 2015 IEPR Draft rate scenarios in April 2015 California Energy Commission