1 ExoMars Programmatic situation December 2014 Rolf de Groot Head of Robotic Exploration Coordination Office ESWT#7 meeting, 9-10 December 2014, Altec,

Slides:



Advertisements
Similar presentations
Status briefing to NuPECC Jean-Claude WORMS Firenze, 8 June
Advertisements

REVIEW OF RECOMMENDATIONS OF 2 nd MEETING OF THE NATIONAL COORDINATORS COSCAP – SOUTH ASIA COSCAP – SOUTH ASIA 18 th MEETING OF THE STEERING COMMITTEE.
Working Group on Audit Chaired by Dagfinn Knutsen, Director, Internal Audit Division, OIOS, UN Secretariat Achievements for 2007.
ESA UNCLASSIFIED – For Official Use ExoMars ESWT#7 9 Dec ESWT # Rover science preparations (RSM, LS) Status, problems, and how we will solve.
Status of implementation of the Ronald Vargas and Ines Beernaerts Food and Agriculture Organization of the United Nations Samarkand, Uzbekistan - 10 September.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
NELS status 31th Annual Convention & Technical Symposium ILA October 27-30, 2002 Washington D.C NELS Co-ordinating Agency Office (CAO) Gunn Marit Hernes.
National Fighter Procurement Secretariat Secrétariat national d’approvisionnement en chasseurs Overview of the work of the National Fighter Procurement.
ICH Road map for the establishment of a category 2 centre under the auspices of UNESCO Frank Proschan Intangible Cultural Heritage Section UNESCO Regional.
Michel Denis, ExoMars Ground Segment Manager, HSO-OPM
Turin. ALTEC. ExoMars Progress Report ExoMars Science Working Team
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
Managing an established facility: Scenarios for group work Kimmo Koski 26 October 2011.
UPDATE ON THE NATIONAL ELECTRONIC CONVEYANCING SYSTEM LIXI Industry Forum 10 September 2008 Simon Libbis Executive Director.
SEDIBENG COLLEGE International Skills Partnerships for FURTHER EDUCATION & TRAINING “GROW WITH THE FLOW.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
ESA UNCLASSIFIED – For Official Use POLAND AND THE EUROPEAN SPACE AGENCY Dr. Christina Giannopapa Coordination with Member States Office, Director General’s.
1 International/OECD Nanotechnology Activities EPA/DoD Meeting on Nanotechnology March 9, 2007 Jim Willis, EPA/OPPT.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
15 th Meeting of the Regional Coordinating Mechanism of PANCAP; Montego Bay, Jamaica 9 th - 10 th of September, 2010 To provide creative and dynamic services.
April 25, 2001 GSFC Data Systems Standards Management and CCSDS P1J Status Report NTAG Meeting April 25, 2001 Felipe Flores-Amaya GSFC/Code 572.
EMSO – PP European Multidisciplinary Seafloor Observation Preparatory Phase PROJECT OVERVIEW.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
IMARS History and Phase II Overview Presented to MEPAG 13 May 2014 L. May, NASA HQ NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
ESWT # Rover operations concept
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Part-financed by the European Union Partnership Joint Technical Secretariat Lead Applicant Seminar for 1st application round Hamburg, April 2008.
Brainstorm: Ideas for sustainability after ICT-AGRI-2 Antoinette Jordan, Dr Raymond Kelly TEAGASC ICT-AGRI-2 Governing Board meeting, Athens 5-6 October.
Technical & Vocational Education and Training (TVET) Learn4Work Schokland Programme on TVET Hester Pronk Accra, 15 December 2008.
Current situation on conducting international comparison of the GDP and purchasing power parities of the CIS countries for 2004.
MEPAG September 2010 Doug McCuistion Director, Mars Exploration Program.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Efficiency ׀ Transparency ׀ Accountability Multi-Donor Trust Fund Office Fund Management for Development Assistance UN-REDD Programme Policy Board Panama,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
Governor’s Guidelines to State and Local Program Partners Negotiating Costs and Services under WIOA December
5b. ESA & WP9: effort and recovery plan ESA DataGrid Review Frascati, 10 June Welcome and introduction (15m) 2.WP9 – Earth Observation Applications.
1 UNEP Global Mercury Partnership April UN General Assembly Resolution 60/215 defines partnerships as… “voluntary and collaborative relationships.
Science investigations in the framework of expedition to Europa
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
European Life Sciences Infrastructure for Biological Information Transition Phase from the ELIXIR MoU to ELIXIR ECA Financial, Legal.
ESA UNCLASSIFIED – For Official Use FISO COLLOQUIUM, 18 June 2014 B. HUFENBACH ESA’S SPACE EXPLORATION STRATEGY.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Korea Responsible Care Council RESPONSIBLE CARE ® in KOREA March 2001 By KOREA RESPONSIBLE CARE COUNCIL.
CIÊNCIA July 2010 Lisboa © ESA. CIÊNCIA July 2010 Lisboa © ESA Slide # 2 1. The European Space Agency 2. Impact in Portugal 3. Future 0.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
PULLING OTHERS TO SCALE UP INDUSTRIAL DEVELOPMENT LADDER GEORGE NDIRA, PRINCIPAL INDUSTRIAL ECONOMIST EAC SECRETARIAT, ARUSHA, TANZANIA 1 ST Meeting of.
ASI Science Programme Barbara Negri - Italian Space Agency (ASI) Head of Exploration and Observation of the Universe Department 10 Years of PAMELA.
Large Synoptic Survey Telescope
UNITED KINGDOM AND MOSAiC: OPPORTUNITIES, FUNDING AND NEXT STEPS
Practitioners’ Research “by the profession, for the profession”
European Insurance and Occupational Pensions Authority Introduction
Return to The Moon: An International Perspective
Organizing a state association
Setting up an ERIC 11 May 2012 Richard Derksen
NAMASAGALI COLLEGE STRATEGIC PLAN
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
Memorandum of Understanding
Prepared at the Joint Meeting For SDCG for GFOI / GEOGLAM / LSI-VC
Governor’s Guidelines to State and Local Program Partners
Are we ready to move to the Creation Phase?
Recent Developments in Regional Accounts
Czech participation in ESA PRODEX
Presentation of 2006/7 Annual Report and Financial Statements
Public Engagement Lead LRO and SAM
Work of the task force on future censuses Agenda point 3.9
Presentation transcript:

1 ExoMars Programmatic situation December 2014 Rolf de Groot Head of Robotic Exploration Coordination Office ESWT#7 meeting, 9-10 December 2014, Altec, Torino

ESA UNCLASSIFIED – For Official Use 2 ExoMars programme stabilised in 2013 ESAC

3 ESA – Roscosmos ExoMars Agreement: In force since March 2013 ESA – Roscosmos Joint ExoMars Steering Board (JESB): Objective: oversight of Joint Programme Co-chaired by ESA (Passvogel) and Roscosmos (Shilov / Khailov) Established Spring 2013, met 3 times since Successful constructive meetings, several problems solved Next meeting May 2015 ExoMars – programmatic status with Roscosmos

4 ExoMars - programmatic status with NASA NASA and ESA have drafted an MoU to formalise the NASA contributions to the 2016 mission Electra UHF radio package, Mars proximity link telecom support to EDM, and technical engineering support to EDM. MoU was approved by the ESA Council on 19 March 2014 and signed by Dordain and Bolden and is in force since 29 April 2014 MOU established International Mars Relay Coordination Group with NASA and Roscosmos for coordination among all the orbiting and landed Mars missions in 2016 and beyond. Group is working since Q NASA has agreed to modify the ExoMars TAA between ESA and JPL to include the Russian partners. For 2018 mission, no ESA – NASA MoU necessary

5 Status of ExoMars funding The total estimated cost of the ExoMars programme is 1200 M€ (ec 2008) Before CM2014, M€ was available for ExoMars M€ from subscriptions to the Declaration 97 M€ from the ExoMars financial risk mitigation plan (GSP, StrIn, Science Programme, Entrance fees) At CM2014, an additional M€ (ec 2008) was subscribed IT 47.9, UK 39.7, FR 30, DE 13.5, ES 8.4 Total available funding is now M€ 1144 Allows for continuation of the programme until at least 2016 Some industrial re-organisation required The remaining funding will have to be requested at a future occasion, most likely at CM2016