PBN OVERSIGHT IN AUSTRALIA

Slides:



Advertisements
Similar presentations
Module N° 3 – ICAO SARPs related to safety management
Advertisements

Foreign Air Operator Validation & Surveillance Course
Regional RAIM Prediction System – Progress Report
Introduction to Navigation Specifications
PUBLIC PROTECTION AND ETHICAL GEOSPATIAL DATA DISSEMINATION AN INITIATIVE OF GEOIDE (PROJECT IV-23) Legal aspect related to aeronautical information Pascale.
Mission Trajectory Step 1 From planning to deployment.
PBN ICAO HQ Activities Overview
ICAO Provisions for Safety Management
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA 1973 to 2004.
APAC PBN Seminar F.LECAT (ICAO)
Applying Innovation Dubai Airport Show 2015 – Innovation podium Tuesday 12 March 2015, Session 1, 10:15 – 10:45 Laurent Delétraz.
Performance Based Navigation Approval and Training
PBN Airspace Concept Process
Regulatory Plan to support the future ATM system in Australia UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10.
ICAO SARPS and Guidance Material
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Regulatory Reform Program Proposed Design Approval Rules CASR Parts 21 and 146 Ian Kearsley Manager Engineering Support Section This presentation is.
SAFETY REGULATION COMMISSION SAFETY REGULATION COMMISSION Harmonisation of ATM Safety Regulation & ESARRs SAFETY REGULATION COMMISSION SAFETY REGULATION.
PERSONNEL LICENCING REGULATIONS  Afiland adapts ICAO Annex 1 SARPS  Except  Flight Navigator,  Flight Engineers  Flight Radio telephony Operators.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
Aeronautical Data 2-Day Workshop Module: 1 Introduction strategic airspace November 2011.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
ICAO Requirements on Certification of Aerodromes Module - 2
Information requested following SMS implementation presentation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
Basic Indoctrination Operation Specifications
Victor Kourenkov ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 LEGISLATION AND ORGANISATION CONSIDERATIONS.
AFILAND FEDERAL AVIATION (Group 4) Recommendations by (Group 4) Consultants Maxwell Odhiambo/ Keziah Ogutu James Danga/ Dibuleng Mohlakwana / Omsalama.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
International Civil Aviation Organization Global Runway Safety Symposium ICAO’s Harmonization Initiatives John Illson Air Navigation Bureau 25 May 2011.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Approval Guidance for RNP Procedures with AR February 10, 2015 Federal Aviation Administration Approval Guidance for RNP Procedures with AR C-384 Presentation.
ICAO COSCAP - SA May AERODROME CERTIFICATION COURSE How can aerodrome certification be achieved? Establish an appropriate regulatory system within.
Authority Requirements Margit Markus Tallinn, 7 May 2009.
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
APAC PBN Seminar F.LECAT (ICAO)
ICAO TECHNICAL COOPERATION PROJECTS IN INDONESIA
Overview of the PBN Airspace Implementation Processes
Aviation System Block Upgrades and NAV CANADA Planning
Safety Regulation of PBN Operations
Performance Based Communication and Surveillance (PBCS)
UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10
Foreign Air Operator Validation & Surveillance Course
PBN OVERSIGHT IN AUSTRALIA
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
Workshop on preparations for ANConf/12 − ASBU methodology
Oceanic and International Operations
Session – 4: Existing ICAO Standards relating to Air Traffic Control
AFILAND FEDERAL CIVIL AVIATION REGULATIONS
Department of Civil Aviation Ministry of Information & Communications
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Foreign Air Operator Validation & Surveillance Course
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
Oceanic and International Operations
ICAO Harmonized Safety Management Requirements – The Safety Concern
PBN ICAO HQ Activities Overview
Aerodrome Certification Workshop
Presentation transcript:

PBN OVERSIGHT IN AUSTRALIA Ian Mallett & John Hodder

PBN Oversight in Australia References: ICAO Doc 9883 – Global Air Navigation Plan Doc 9613 – PBN Manual Doc 9849 – GNSS Manual Doc 9992 – Manual on Use of PBN in Airspace Design PBN Airspace Concept 2

PBN Oversight in Australia References (2): CASA: CASR Parts 139, 145, 173, 175 CAO 20.18, 20.91, 82.3, 82.5 AC 91.U-01 Navigation authorisations Annex C PBN Booklet PBN Navigation Authorisations Technical Assessor Handbook ADS-B Booklet CNS/ATM Quick Reference Guide (acknowledge input from Tim Hurley CASA Airspace Project Specialist) 3

PBN Oversight in Australia Australian PBN Context: GNSS equipment mandates support airspace becoming GNSS based PBN exclusive from 4 February 2016. Common navigation specifications will be: RNP 2 en route. RNP 1 terminal procedures (SIDs/STARs). RNP–APCH GBAS operational at Sydney. No SBAS coverage. ANSP – Airservices developing the Future Airspace Strategy Deployment plan (Airservices Corporate Plan 2014-19).

PBN Oversight in Australia Australian PBN Context (2): Beyond 2016: Reduction in ground based nav aids by approximately 50% forms Backup Nav aid Network (BNN). BNN supports GNSS contingency operation, allowing for completion of flight. Surveillance: ADS-B required now for operations above FL290. From 2 Feb 2017 ADS-B required for all IFR operations. ATM: OneSKY Australia program: Civilian and Defence new harmonised air traffic management system, 2018 est. Some ground based navigation aids are already being decommissioned.

PBN Oversight in Australia CASA oversight of: Air Traffic Management (ATM) Air Traffic Control AIS/AIM Part 173 SMS AOC Holders OPS Approval Pilot Airworthiness Data Providers Part 175 6

PBN Oversight in Australia Flight procedure service provider oversight: CASR Part 173 - Instrument flight procedure design: Certified designers, authorised designers, performance of design work, administration, grant of design authorisations, authorised inspectors etc. PANS-OPS Inspectorate: CASR Part 173 subpart E.5: Risk based audits of domestic and international design organisations that hold 173 certificates. Aerodrome Operating Minima (AOM): MOS Part 173 - 8.1.8: Higher of corrected OCA or state DA/MDA.

PBN Oversight in Australia AIS/AIM oversight: CASR Part 175 - Aeronautical Information Management: AIS providers, certificates, changes, provision of AIS, data requirements, organisational requirements, AIM data service providers, AIM data originators etc. Relatively new, commenced 5 March 2015 Inspectors attended training earlier this year. Creates new standards ensuring integrity and quality of aeronautical data/information is maintained through the aeronautical data chain.

PBN Oversight in Australia CAO 20.91 – Instructions and Directions for Performance Based Navigation: Method by which IFR aircraft engaged in PBN to be navigated and directions related to conduct of IFR flight using PBN navigation specifications. Details requirements (eligibility, documents, system performance, system functionality, operating standards, contingency procedures etc.) for each navigation specification. Use of PBN: Generally the pilot must be satisfied that the operation meets the navigation spec requirements (8.2a), except CASA authorisation required for RNP-AR and RNP 0.3 (8.2b) and advanced RNP.

PBN Oversight in Australia CAO 20.18 – Aircraft equipment-basic operational requirements: Equipment required for ADS-B and equipment mandates. GNSS equipment requirements and equipment mandates. Standards for GNSS/AFD/VOR equipment.

PBN Oversight in Australia CASA Operations Division – Certificate Management Teams: Audit aircraft operators, maintenance organisations etc. Multidisciplinary team. Flight Operations Inspectors. Airworthiness Inspectors. Safety Systems Inspector.

PBN Oversight in Australia SMS: Safety management systems vary in size and complexity depending on the organisation. A SMS should be appropriate for the organisation’s size, complexity and activities. Instrument flight procedure design: CASR 173.145, MOS Part 173 Chapter 5. Certified designer must establish and maintain SMS in accordance with MOS Part 173 standards. A SMS must define the polices, processes and practices for managing the safety of all procedure design work.

PBN Oversight in Australia SMS (2): Aeronautical Information Management CASR 175.225 - AIS providers: Must have a SMS that is a systemic approach to managing safety and integrates human factors principles. SMS matters include: Safety accountabilities of managers, relevant third party relationships and interactions and risk management process CASR 175.405 - Data service providers: Must have a SMS. Similar requirements to AIS.

PBN Oversight in Australia SMS (3) – General: Aerodrome Safety Management System CASR Part 139. Safety management system requirements for high-capacity regular public transport (HCRPT) CAO 82.5. Safety management system requirements for low-capacity regular public transport (LCRPT) CAO 82.3. Approved Maintenance Organisations CASR Part 145.

Questions?