Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR 19.09.2014.

Slides:



Advertisements
Similar presentations
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Advertisements

Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
APAC SIP on ASBU B0-FICE AIDC Implementation Seminar Basic SYSCO Principles and Standard OLDI Communication EUR Environment ICAO EUR/NAT Office Celso Figueiredo.
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
ESARR 5 and language proficiency for ATCOs European Organisation for the Safety of Air Navigation ICAO – EUROCONTROL EUROPEAN SEMINAR ON LANGUAGE PROFICIENCY.
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR

2 Comprehensive Explanation  Target Date: 12/2018  SCOPE: ECAC – All States except SK  Electronic dialogue as automated assistance to controller during coordination and transfer addresses the facilities and processes between ATC components serving ATC units.  ATC17 complements ITY-COTR.  Purpose:  Co-ordination prior to the transfer of flights from one ATC unit to the next;  Transfer of communication from one ATC unit to the next ATC unit of such flights;  Support the exchange of OLDI messages related to the Basic procedure and, if applicable, SSR Code Assignment Message. ESSIP Plan 2014 / Objective ATC17

3 What is new or has changed for ESSIP Plan ed  Deletion of SLoA REG01 on safety oversight (action carried across the ESSIP Plan ed. 2014) ESSIP Plan 2014 / Objective ATC17

4 Link to European ATM Master Plan and/or Interim Deployment Programme (IDP) Eur. ATM Master Plan:  [CM-0201] – Automated Assistance to Controller for Seamless Coordination, Transfer and Dialogue IDP:  WP 5.2 ESSIP Plan 2014 / Objective ATC17

5 Most important SLoA(s)  All  Note: whereas this objective is defined with an ECAC scope, it will be the decision of the individual ATS Provider to:  define its local applicability in terms of relevant ATSUs, and  identify the processes to be implemented (refer to ATC17 SLoAs and in particular, their finalisation criteria, for the complete list of processes). ESSIP Plan 2014 / Objective ATC17

6 Finalisation Criteria and Closed Questions For ASP01:  Deliver safety arguments for all changes related to implementation of electronic dialogue for Coordination and Transfer. For ASP02/3/4 (important to clearly identify ATSUs involved and which processes are implemented):  Ground systems updated  Technical File with evidences of compliance to EC Declaration of Verification;  Functions (form the list in it he individual SLoAs) documented and in operational use. For ASP05:  Training plans updated and training package developed by the ANSP for the use of electronic dialogue procedure. ESSIP Plan 2014 / Objective ATC17

7 Supporting Material  EUROCONTROL-Specification for On-Line Data Interchange (OLDI) Edition 4.2 (OJEU Reference 2011/C 146/05)  EUROCONTROL-System Supported Coordination (SYSCO) Implementation Guidelines ESSIP Plan 2014 / Objective ATC17

8 ESSIP Report 2014  Objective introduced in the ESSIP Plan in  By end of 2013, 1 State has reported it as completed; 6 reported it partially completed (functionalities available and ATCOs trained but not implemented operationally). This requires agreement with neighbouring ACCs where the same functionalities must be available.  From the reported ANSP plans, the current estimate for achievement is 12/2018. ESSIP Plan 2014 / Objective ATC15

9 Links and contacts  Objective Coordinator: Dell’Orto Luca,  EUROCONTROL Objective Expert: Stephen Morton, ESSIP Plan 2014 / Objective ATC17