Prevention and Remediation of Concrete Moisture-Caused Flooring Issues Prevention and Remediation of Concrete Moisture-Caused Flooring Issues Name Tandus.

Slides:



Advertisements
Similar presentations
2 NTCA is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will.
Advertisements

NGfL CYMRU GCaD FLOOR COVERINGS.
EnStron Engineered Wood Underlayments just got a little GREENER!
DESIGN INVESTIGATE REHABILITATE Design and Quality Assurance of CFRP Repair of Concrete Pressure Pipes Rasko Ojdrovic Murat Engindeniz Mehdi.
The Company Who Is Advanced Prevention Products Founded in 2003 in North Wilkesboro, NC. APP set out with a goal in providing a comprehensive mold and.
Subfloor Evaluation Prior to Installation Understanding the science of concrete slabs prior to installation of moisture sensitive floor covering materials.
Polymer Floor & Wall Coatings: Selection, Preparation, Installation and Troubleshooting.
Presented By: Mike Mudrick 2012 ICRI Carolinas Chapter Fall Convention Coating Failures, Causes, Preventative Measures & Repairs Executive Development.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guideline for Using In-Situ.
EnStron Engineered Wood Underlayments just got a little GREENER!
The Choice of Professionals ™ Seth Pevarnik Manager of Technical Service.
Curing and Protection of Concrete
Cutting Edge Solutions Using Advanced Self Leveling Materials ICRI National Convention April 14, 2010.
Subfloor Preparation and Moisture Mitigation “an ounce of prevention is worth a pound of cure” Benjamin Franklin.
Public Works Department Debarment Hearing Concrete Restoration Services Ltd. Bid Opportunity
GA Tech Safety and Health Consultation Program FALL PROTECTION.
Hope VI Residents Deserve Green Housing Affordable, Healthy Home Design Choices.
Relevance of Ambient Conditions Temperature/humidity restrictions often ignored Air and surface temperature can be too hot or too cold for proper film.
Flooring Options for High Traffic Areas Presented by: Jayson L. Helsel, P.E. KTA-Tator, Inc. 1.
Quality Control Testing
New Water-Based Amine Technology for Epoxy Application Over Green Concrete
Cement-Based Flooring Systems The Good, Bad and the Ugly H. Peter Golter, PE.
Consumer Education Marketing Research and Tire Survey Key Findings from the Telephone Survey of California Tire Consumers Conducted for The California.
1 August 12, 2014 Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD Presented by: American Concrete Pipe Association Scott Hofer.
1 COMPOSITE MATERIALS What are composite materials? Two or more materials bound together Example from civil engineering: Concrete reinforced with steel.
Presented by: Peter Emmons,
Harmony Introduction. Flooringroup.com introduces Harmony  Harmony is new to the US Market for 2013  Harmony is a commercial sheet flooring  Harmony.
1. The Challenge Hospital-associated infections (HAIs) like MRSA continue to be a problem in health care facilities It is estimated that each year in.
Structural Drying Open enclosed areas (walls, floors) Drying may take several days or weeks.
Bethesda Triangle Brian Groark Construction Management Faculty Consultant: Dr. Messner.
June 2013 © CRMCA.com 1 Hidden Landmines in Concrete Specifications Eric T. Misenheimer, PE Chair, CRMCA Technical Committee June 22, 2013.
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
Green Recycling Network Toward a Greener Tomorrow... Today!
The Basics of Formaldehyde: What You Need to Know.
Moisture Mitigation How they work and what to use.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
LECTURE NOTES-CHAPTER 8 CURING OF CONCRETE
Rafco Products Acid Staining. Rafco Products Acid Staining JadeTurquoiseCoffeeCarmel MahoganyEbonyMission Brown Amber Reactive stains Natural colors Permanent.
RENAISSANC E CARPET TILES_.  INTRODUCTION_  BENEFITS_  SUGGESTED SPECIFICATION_  INSTALLATION INSTRUCTIONS_  MAINTENANCE PROCEDURES_  TECHNICAL.
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.
ISO Registration Common Areas of Nonconformances.
Writing Plans. Assessment performed by an Assessment Consultant, who produces a… Remediation Plan, that is provided to the client before the remediation.
Mold Remediation & Remediation Contractors 2011 National Tribal Forum on Air Quality Institute for Tribal Environmental Professionals (ITEP) & National.
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
Engineered Wood Underlayments just got a little GREENER!
The Promise of the Garco Warranty Three Types of Warranties  Galvalume ® Substrate  Paint  Weathertightness 4.
Smart heat for comfort and safety Our capabilities for the commercial construction industry.
1 Property of Raven Industries, Inc. All Rights Reserved.
Patented Technology – Quality Results Ulti-Pave 3 Pavement Repair Mix 30-Minute Workability 3,000 PSI 3-Hour Set ® “A One Component, Rapid Hardening Cementitious.
How to Write A Good Concrete Moisture Testing Specification EP Floors Corp.
Building Survey and Bulk Material Sampling Techniques, Analysis of PCB Analytical Data For Building Materials, and Design of PCB Investigation Programs.
2016 SUBSTRATE PREPARATIONS. SUBSTRATE PREPARATION METHODS FOR CONCRETE Very Course Profile Scabbling – Suitable for very aged, weak or contaminated substrates.
Concrete Slab Moisture Testing Certification Program
ADHESIVE SCIENCE 101 for the FLOOR COVERING INSTALLER
Firestone Metal Warranties
DURABILITY OF CONCRETE STRUCTURES RURAL POLYTECHNIC TARIHAL
CIVL300 SUMMER PRACTICE.
Find the Best Concrete Cutting Contractor in Melbourne
Bondbreakers AVOIDING PROBLEMS.
CIVL300 SUMMER PRACTICE.
PRECAUTION AND SAFETY METHODS FOR HAIL DAMAGE. CONTENT INTRODUCTION HAIL DAMAMGE PREVENTIVE METHODS FOR ROOF SAFETY METHODS FOR VEHICLES CONCLUSION.
Concrete Slab Moisture Testing Technician Certification Program
CIVL300 SUMMER PRACTICE.
Double-Stick Cushion Why? Added Comfort Improved Performance Removable
Automotive Technology Principles, Diagnosis, and Service
3M™ Universal Cover Tape (UCT) 2688A application procedure
Fiber Reinforced Polymer Systems
Presentation transcript:

Prevention and Remediation of Concrete Moisture-Caused Flooring Issues Prevention and Remediation of Concrete Moisture-Caused Flooring Issues Name Tandus Flooring Date

Course Objectives You will learn… What floor moisture is and where it comes from How floor moisture affects floor coverings and adhesives The importance of identifying floor moisture issues prior to floor covering installation How to accurately test for floor moisture Moisture testing minimums Requirements for Moisture Vapor Emissions Rate, pH and Relative Humidity Information on approved remediation systems

Floor moisture issues have become more frequent and difficult to identify. All floor covering manufacturers and adhesive companies have seen a tremendous increase in the number of moisture related issues. Factors include: Changes in concrete composition High recycle content concrete The variety of curing & sealing compounds commonly used Different surfacing techniques Fast track construction schedules The practice of not running HVAC systems to help acclimate concrete prior to testing and/or the use of new hybrid ventilation systems.

What is Floor Moisture & Where Does it Come From?

Green Concrete

How Does Floor Moisture Affect Floor Coverings & Adhesives? Debonding Adhesive failure Tile instability Bubbles in VCTT (Powerbond)or broadloom Good medium for biological growth

If moisture issues are identified before the floor covering is installed, corrective measures are much simpler and less expensive than after the floor covering is in place Mold colonization due to moisture in slab Degraded adhesive due to moisture in slab Curling tile that was installed in entry area over an 8lb slab

How to Measure Concrete Floor Moisture CaCl (Anhydrous Calcium Chloride) ASTM F RH (In-situ) ASTM F pH (Alkalinity) ASTM F

Anhydrous Calcium Chloride Testing ASTM F What are we measuring? MVER Inaccurate or inconsistent results Typical industry requirements

pH ASTM Standard Practice F What are we measuring? Inaccurate or inconsistent results Typical industry requirements

Relative Humidity (RH) ASTM F What are we measuring? Inaccurate or inconsistent results Typical industry requirements

Moisture meter that is commonly used but does not provide quantifiable results.

3 three moisture tests to be completed within the first 1000 sq ft of concrete on each floor One moisture test to be completed within each additional 1000 sq ft MVER Testing ASTM F % of these tests be conducted RH Testing ASTM F % of the tests to be conducted pH Testing ASTM F Surface pH of the concrete flooring substrate must be between 7 and 9 and absolutely must not exceed 9. A minimum of one test per 1000 sq ft is required. TESTING REQUIREMENTS FOR POWERBOND, MODULAR AND BROADLOOM

It is the General Contractor’s and/or Architect’s responsibility to specify a concrete substrate that is suitable for the installation of a floor covering product at the desired time of installation. “It is solely the responsibility of the installation contractor to insure that the sub-floor is properly prepared prior to installation.” Tandus Flooring Installation Instructions

Approved Remediation Systems Underlayment for use with Tandus Flooring’s modular carpet Remediate MVER up to 10 lbs. pH requirements maximum 9 Closed-cell cushion; based on the technology of Powerbond Both Tandus Flooring’s modular carpet and power(shield) warrantied when used together.

Approved Remediation Systems XL Brands DynaMix Green concrete only, <8 lbs MVER with decreasing trend pH requirements maximum 9 Warranty is limited to 3 years Cost = $0.27 per sf

Approved Remediation Systems VersaShield Green concrete or existing moisture source <12 lbs MVER pH requirements maximum 12 RH requirements maximum 95% Warranty covers warranty period of product type selected Cost = $0.65 sf - $0.90 sf

Approved Remediation Systems Koester Green concrete or existing moisture source <25 lbs MVER pH requirements maximum 14 Warranty is lifetime of the flooring product Cost = 7.50 sf - $9.50 sf

Approved Remediation Systems 2 Part Epoxy Systems Ardex MCI Bostik D261 Key Resin MTV 635 Mapei EMB Refer to Field Technical Services for Moisture pH, MVER and RH limits for these products as well as availability and pricing.

Important Things to Remember Do not assume that proper testing has been performed by general contractor or end user. Be knowledgeable and ask questions prior to installation. Avoiding required testing is not an option.

“We’re fully aware that these recommendations go well beyond what is presently being done or required on most projects. Given the very common, serious, and costly nature of flooring failures, however, it’s believed that these measures are necessary to reduce the risk of flooring problems and the significant cost associated with failure of the flooring system.” Reference from: “Moisture Testing of Concrete Slabs, When 3lbs is not 3lbs”

Conclusion…You should know What floor moisture is and where it comes from How floor moisture affects floor coverings and adhesives The importance of identifying floor moisture issues prior to floor covering installation How to accurately test for floor moisture Moisture testing minimums Requirements for MVER, pH and RH Information on approved remediation systems

Thank you.