Sl. No Lines/ICT’sAction byAction 1.400 KV Kanpur - Ballabhgarh HVPN RRVPN DTL Load shedding in and around Ballabhgarh Load shedding in Northern Rajasthan.

Slides:



Advertisements
Similar presentations
NERC Footnote b / 12 – Load Loss
Advertisements

CHALLENGES IN DEVELOPMENT OF INDIAN POWER SYSTEM Mr. V. Ramakrishna Member (Power System), CEA.
Reactive Power Management - Case study -- Nandan Pathak (AE)
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
Network Solution for NER States. POWERGRID CORPORATION OF INDIA LIMITED incorporated in October, 1989 with a mandate to Interconnect Regional Power Grids.
Harnessing Renewable Energy & Solar Mission of Indian Railways.
NR - ULDC SCHEME POINTS OF CONCERN.  1. LACK OF REDUNDANCY  2. FREQUENT BUGS IN SCADA SOFTWARE  3. INCOMPLETE REPORTING SYSTEM  4. EMS – INCOMPATIBLE.
NR - ULDC SCHEME POINTS OF CONCERN.  1. LACK OF REDUNDANCY  2. FREQUENT BUGS IN SCADA SOFTWARE  3. INCOMPLETE REPORTING SYSTEM  4. EMS – INCOMPATIBLE.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs.
ET2105 Electrical Power System Essentials
PRESENTED BY - SUBHASH MOVEMENT OF OTC BY SUBHASH.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Pallatana-Bongaigaon Transmission System. 2 Generation Project Summary  Pallatana (726.6 MW): being implemented by OTPC –Unit - 1 : Dec-2011 –Unit -
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Program on Grid management SCADA/EMS System in Northern Region
Power System Structure Basic DWP Power System
MANAGEMENT OF LOAD DISPATCH CENTERS RLDC’s MANAGEMENT.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
LOAD FORECASTING T SRINIVAS MANAGER SRLDC. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK DETAILS.
GRID OPERATION AND CONTROL. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK.
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri P. Shankar Chief Vigilance Commissioner At NORTHERN REGIONAL LOAD DISPATCH CENTER 25 th March.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri N K Singh Member, Planning Commission At NORTHERN REGIONAL LOAD DISPATCH CENTER.
SCADA/EMS System An Overview. PQ V O SS DS DC MW MVAR VOLTAGE TAP POSITION SINGLE STATUS ISOLATOR POSIITION, PROTECTION, LOSS OF VOLTAGE DOUBLE STATUS.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation.
MAXIMUM POWER TRANSFER THEOREM
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri Brajesh Mishra Principal Secretary To Prime Minister At NORTHERN REGIONAL LOAD DISPATCH CENTER.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
Cheng-Ting Hsu Presenter: Cheng-Ting Hsu Cogeneration System Design for a High-Tech Science-Based Industrial Park Department of Electrical Engineering.
For More Information Details: Sector 62, Noida, India Mobile: Visit: For More Information Details:
Objective Provide an analysis of the existing Waltz-Mill system. Provide an analysis of the existing Waltz-Mill system. Determine the affect on the system.
Overall National Grid Development: Constraints & Options
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
UTILITY OF MODERN LOAD DISPATCH COMMUNICATION SYSTEMS
To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into Telecom Through an.
Wednesday, March 31, 2004 MANAGEMENTOF LOAD DISPATCH CENTERS.
Smart Grid & Integration of Renewable Energy Resources.
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
BANGALORE TRANSMISSION PLANNING
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome CONTINGENCY PLAN FOR NORTHERN GRID.
Impact of Distributed Generation on Fault Induced Transients: A Case Study Sukumar Brahma Adly Girgis Clemson University Electric Power Research Association.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
HPSEB STATE LOAD DESPATCH AND COMMUNICATION CENTRE, SHIMLA
A Presentation on Grid Management
Presented by : Er.Suneel Grover
Presented by : Er.Suneel Grover
POWER GRID CORPORATION OF INDIA LIMITED Northern Regional Load Despatch Centre (NRLDC) WELCOMES TANZANIAN DELEGATION 26th August 2003.
SSLB Running in Pump mode Transmission Loss optimisation
REGIONAL GRIDS IN INDIA – QUICK FACTS
Draft Proposed Regulations on Terms & Conditions of Tariff
Presented by : Er.Suneel Grover
Draft Proposed Regulations on Terms & Conditions of Tariff
Welcome To Confidencial Detective Agency
A PRESENTATION BY HPSEB LTD.
Delhi Agra Jaipur Tour Package.
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.



“ MERIT ORDER SCHEDULING AND
Non-Attainment Cities
Harnessing Renewable Energy Solar Mission of Indian Railways
Rewari SSA among Top-10 SSAs of North Zone
Presentation transcript:

Sl. No Lines/ICT’sAction byAction KV Kanpur - Ballabhgarh HVPN RRVPN DTL Load shedding in and around Ballabhgarh Load shedding in Northern Rajasthan Load shedding in South Delhi KV Kanpur - AgraHVPN RRVPN DTL Load shedding in and around Ballabhgarh Load shedding in Northern Rajasthan Load shedding in South Delhi KV Panki - Muradnagar UPPCL UPCL Load shedding in Western UP Load shedding around Rishkesh (Garhwal area) KV Dadri - Muradnagar UPPCL Load shedding in Western UP area. Load shedding around Rishikesh (Garwhal area) KV Unnao - AgraUPPCLLoad shedding in Western UP KV Lucknow - Moradabad UPPCL UPCL Load shedding in Western UP Load shedding in and around Haldwani and Rishikesh (Garhwal and Kumaon areas) DETAILS OF LOAD SHEDDING IN SPECIFIC AREAS IN ORDER TO REDUCE LOADING ON DIFFERENT CIRCUITS Continued..

DETAILS OF LOAD SHEDDING IN SPECIFIC AREAS IN ORDER TO REDUCE LOADING ON DIFFERENT CIRCUITS KV Agra - BassiRRVPN HVPN Load shedding in Northern Rajasthan Load shedding in Southern Haryana KV Ballabhgarh - Bassi RRVPN HVPN Load shedding in Northern Rajasthan Load shedding in Southern Haryana KV Dadri - Panipat HVPN RRVPN DTL Load shedding in and around Panipat Load shedding in Northern Rajasthan Load shedding in and around Narela (When Narela being fed from Panipat) KV Dadri - Mandola DTL HVPN RRVPN Load shedding in Northern Delhi and Western Delhi Load shedding in Northern Haryana (in and around Abdullapur) Load shedding in Northern Rajasthan KV Ballabhgarh - BTPS * DTL RRVPN Load shedding in South Delhi and NDMC area Load shedding in and around Alwar Continued..

DETAILS OF LOAD SHEDDING IN SPECIFIC AREAS IN ORDER TO REDUCE LOADING ON DIFFERENT CIRCUITS KV BTPS - IP Extn. DTLLoad shedding around UP and in New Delhi area KV Mandola - Patparganj DTLLoad shedding in East Delhi area KV Samaypur - Charkhi-Dadri HVPN RRVPN Loading shedding in Southern Haryana Load shedding in Northern Rajasthan KV Ballabhgarh - Charkhi Dadri HVPN RRVPN Load shedding in Southern Haryana Load shedding in Northern Rajasthan KV Kishenpur - Pampore ** J & KLoad shedding in Valley area * During the time when direction of power flow is from Ballabgarh to BTPS end. ** During the time when direction of power flow is from Kishenpur to Pampore

DETAILS OF LOAD RADIAL FEEDERS / ICTs IN DIFFERENT STATES FOR GETTING LOAD RELIEF IN THE EVENT OF A CONTINGENCY Continued.. StateControlling State/ Agency Feeder / ICTs DetailsNormal Load DTLBBMB POWERGRD NTPC UPPCL D1, D2 and D3 feeders from Rohtak Road 220 kV Mandola-Gopalpur I & Gopalpur-II 220 kV BTPS-Okhla-I and Okhla-II Load to Ghazipur from Noida 100 MW 220 MW 300 MW 50 MW UPCL UPPCL 132 kV Dohna-Kiccha S/C 220 kV C.B.Ganj-Haldwani S/C 40 MW 80 MW PSEBBBMB 3 Nos. of 220/66 kV ICTs at Jamalpur 2 Nos. of 220/132 kV ICTs at Jamlapur 2 Nos. of 220/66 kV ICTs at Jallandhar 2 Nos. of 220 /132 KV ICTs at Jallandhar 3 Nos. of 220/66 KV ICTs at Sangrur 80 MW 50 MW 40 MW 60 MW 30 MW HPSEBBBMB BBMB/NHPC 220 kV Dehar-Kangoo and 132 kV Dehar- Kangoo 220 kV Pong-Jessore, 220 kV Bairsiul-Jessore & 220 kV RSD -Jessore 100 MW 80 MW

DETAILS OF LOAD RADIAL FEEDERS / ICTs IN DIFFERENT STATES FOR GETTING LOAD RELIEF IN THE EVENT OF A CONTINGENCY J&KPSEB NHPC /PSEB POWERGRID/ PSEB POWERGRID 66 kV Pathankot-Kathua 66 kV Sarna-Kathua 220 kV Salal-Jammu D/C and 220 kV Sarna- Hiranagar 220 kV Kishenpur-Udhampur & 220 kV Sarna- Udhampur 220 kV Wagoora-Ziankote 8 MW 6 MW 250 MW 120 MW 140 MW HVPNPOWERGRID BBMB BBMB HPSEB BBMB BBMB 220 kV Abdullapur-Shabad D/C 220 kV Dadri-Narnaul S/C 220 kV Dadri-Riwari S/C 220 kV Samaypur-Palwal D/C 132 kV Panipat-Sonepat & 132 kV Narela-Sonepat 132 kV and 33 kV feeders from Panipat 132 kV and 33 kV feeders from Kurukshetra 220 /132 kV ICT #2 at Dadri (BBMB) 132 kV Giri-Abdullapur 220/132 kV ICT# at Hissar 220/66 kV ICT-I & ICT-2 at Jagadhari / 66 kV feeders from Jagadhari 66 kV feeders from Dhulkote 66 kV Rohtak Road-Gurgaon D/C 220 kV Samaypur-Badshahpur D/C 120 MW 60 MW 80 MW 50 MW 40 MW 120 MW 60 MW 35 MW 40 MW 50 MW 80 MW 15 MW 40 MW 120 MW UT Chandigarh HVPNL66 kV Pinjore-Chandigarh (Sector-29) D/C40 MW

ACTION DURING LOW VOLTAGE CONDITIONS Sr. No. Sub-StationMin. Bus voltage Action By Action 1.Dadri 400 kV (NTPC) 360 KVDTL HVPN UPPCL Load shedding in and around Gopalpur, Subzi Mandi, Narela, Rohtak Road, Rohini, Shalimarbagh, Patpargarnj, Kashmere Gate, Bawana, Najafgarh, Bamnauli and surrounding areas. Load shedding in and around Panipat and Ballabhgarh. Load shedding in and around Muradnagar, NOIDA, Sahibabad, Meerut, Modipuram, Simbholi, Khurja and surrounding areas. 2.Panipat 400 kV 360 KVHVPN DTL Load shedding in and around Panipat and Ballabhgarh Load shedding in and around Narela (When Narela being fed from Panipat) 3.Muradnagar 400 kV 360 KVUPPCL DTL UPCL Load shedding in and around Muradnagar, NOIDA, Sahibabad, Meerut, Modipuram, Simbholi, Khurja and surrounding areas. Load shedding in and around Patparganj, Ghazipur and surrounding areas (if connected from Sahibabad) Load shedding in and around Rishikesh and Haldwani.

ACTION DURING LOW VOLTAGE CONDITIONS 4.Bassi 400 kV 360 KVRRVPN HVPN Load shedding in and around Jaipur and other areas in Northern Rajasthan Load shedding in and around Hissar and Ballabhgarh 5.Ballabhgarh 400 kV 360 KVHVPN RRVPN DTL Load shedding in and around Dadri (BBMB), Badshahpur, Palwal and Ballabhgarh Load shedding in Northern Rajasthan Load shedding in South Delhi 6.Wagoora 400 kV 360 KVJ & KLoad shedding in Valley area in J&K 7.NAPS 220 kV 180 KVUPPCL UPCL Load shedding in and around Moradabad, Muradnagar Simbholi, Meerut, Modipuram, Khurja, Sahibabad. Load shedding in and around Rishikesh and Barelley

ACTION DURING LOW VOLTAGE CONDITIONS 8.BTPS 220 kV 180 KVDPSCLoad shedding in and around Okhla, Mehrauli, Patparganj, IP, Rajghat, Lodhi Road and Sarita Vihar 9.Moga 220 kV 180 KVPSEBLoad shedding in and around Moga, Ferozpur, Jagraon, Laltokalan. 10.Jammu 220 kV 180 KVJ & KLoad shedding in Jammu area in J&K In order to minimise / avert low voltage conditions these are to be ensured: The capacitor banks are kept in service. The generating units at Load Centre locations are generating maximum possible VARS. Wherever possible the hydro units are operated in Synchronous Condenser mode and generating VARS. The transformer tops are optimally selected.