WATER UTILITY INFRASTRUCTURE IN THE REPUBLIC OF CROATIA

Slides:



Advertisements
Similar presentations
COUNTRY REFORMS ON LEGAL, INSTITUTIONAL AND TECHNICAL ISSUES IN CROATIA OGNJEN BONACCI Faculty of Civil Engineering and Architecture, University of Split,
Advertisements

UWWT directive in Croatia – implementation and data availability
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
May 2005 The French Water Services: Main present challenges.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
European Commission, DG Environment Brussels, 05 April 2006 Screening of chapter 27 - Environment Dr. Violeta Vinceviciene European Commission DG Environment.
Titlul proiectului subtitlu EU Financing in Environmental Sector during Raluca FRATILA Ministry of Environment and Forests, Managing Authority.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
„Extension and modernization of water and wastewater infrastructure in Arad County”
Public Utility for water supply and sewage „Naissus“ Niš City of Niš, Serbia Local governments: helping each other?
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
Local Self Government in environmental management Jadranka Ivanova Head of EU Department Ministry of Environment.
International Cooperation in Water Management and Pollution Control in the Danube River Basin Joachim Bendow, ICPDR Executive Secretary 1.
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
The Marine Strategy Framework Directive 17th March 2010, Newcastle North Sea Stakeholders Conference Leo de Vrees European Commission (DG Environment,
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
ICZM in Europe Anne Burrill
Ministry of the Environment and Spatial Planning, Ljubljana, 16 November '07 Breda Mulec, PhD Head of Department Section of legal affairs European Affairs.
Drinking water and urban waste water treatment development ÖKO Zrt. Evaluation tasks.
Cooperation on Transboundary Waters: A Challenge for Europe and Other Regions of the World Dr. Stephen F. Lintner World Bank.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
EU Water Policy Sustainable water management for generations to come.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
Regional policy European Commission EN Update on IPA Component III - environment Brussels, 28 November 2008 Erich Unterwurzacher REGIO.I4 – IPA/ISPA.
Ukraine In-Depth Energy Efficiency Review VI International Specialized Trade Fair “ENERGY EFFICIENCY RENEWABLE ENERGY – 2013”, Kiev, 8 November 2013 Steivan.
MOBILISATION OF RESOURCES TO IMPLEMENT THE DANUBE STRATEGY Ruse/Giurgiu, May 2010 T. Sobieski European Commission-Head of Unit C2, DG ELARG.
International Network Network of Basin OrganizationsInternationalOffice for Water PARIS Paper of Mr. Jean-François DONZIER Paper of Mr. Jean-François DONZIER.
KAJ MORTENSEN, HEAD OF SAPARD UNIT, DG AGRI EUROPEAN COMMISSION Pre-accession Assistance for Rural Development.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Priority Environmental Investment Programme (PEIP) – CARDS Regional Regional Meeting for Senior Officials from SEE and Donors’ Community 19-20th June Budva,
Integrated Water Management Valentina Pryazhinskaya Water Problems Institute of the Russian Academy of Sciences Problems and Challenges: Conflicting interests.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
SEA in the Czech Republic Prague, 24 September 2008.
The Cohesion Fund in Poland and the Selection System for Environmental Investments Andrzej Guła Institute of Environmental Economics – Poland CEE Bankwatch.
Seminar “American Expertise and technology for the water and wastewater sector” 11 April 2011 Business Opportunities in the Romanian water and wastewater.
Cost recovery study for the Seine Normandie RBMP.
Water.europa.eu Waste water management situation in the Danube region: an overview Vienna, 13 May 2016 Helmut Bloech.
Ing. Alena Bujnová, Head of Water Policy Department Ministry of Environment of the Slovak Republic.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Progress and challenges of a transboundary cooperation Dr. Adam Kovacs International Commission for the Protection of the Danube River (ICPDR) Status of.
Ministry of Regional Development and Public Works Vienna May 2016 Water and Sewerage Sector in Bulgaria Challenges and Vision.
Addressing the double challenge EU accession process, an opportunity to address water sector challenges 2016 Danube Water Conference 12 May 2016, Vienna.
1 Financing in water sector - times of change Antti Tooming Ministry of the Environment / Water department, Head of Project bureau 19/05/2016.
WASTEWATER TREATMENT IN BULGARIA STATUS AND CHALANGES ORLIN DIKOV – INFRASTRUCTURE CONSULTANT.
Framework for Water Management – challenges at national/local and trans-boundary scale Water Framework Directive implementation Gordana Kozhuharova, REC,
2017 Danube Water Conference:
ATLANTIC STRATEGY and EU Cohesion Policy
National Administration “Romanian Waters” NARW Bucharest - Romania
Association of providers of communal services in Republic of Macedonia - ADKOM Business planning in Macedonia – process starting as a request of the Regulator.
Danube Water Conference, Vienna, May 2017
Meeting Standards and Expectations in the Water Industry
Michael Jacobsen, Project Director - Water 18 MaY 2017
BULAQUA Conference Sofia, March 27, 2018
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
The role of Territorial Cooperation in IWT and integrated planning
The EU WATER POLICY.
A Blueprint to safeguard Europe’s Water Resources
A Blueprint to safeguard Europe’s waters
A Blueprint to safeguard Europe’s waters
The Water Framework Directive: Challenges, Threats and Opportunities
Danube Water Conference 2019
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

WATER UTILITY INFRASTRUCTURE IN THE REPUBLIC OF CROATIA HRVATSKE VODE WATER PROTECTION DEPARTMENT MARA PAVELIĆ, DSc Biotech. BRUXELLES, 21 January 2015

21st CENTURY CHALLENGE Water is a strategic 21st century resource, and although it covers 70% of the Earth’s surface, freshwater represents only 3% . ¼ of the world population does not have at their disposal sufficient quantities of drinking water, which makes the provision of sufficient drinking water quantities the main ecological, economic and safety issue. On the global level, 70% of the total water consumption is used in agriculture, 19% for industrial purposes and 11% for personal needs of the population. Based on total renewable water resources per person, Croatia ranks 3rd in Europe (after Norway and Russia), and 5th with regard to quantities of high quality drinking water, which makes us committed to rational and responsible management.

21st CENTURY CHALLENGE Level of water supply to population in the Republic of Croatia is 76%, but the connection level to public sewerage systems is less than 50%. Existing public sewerage systems do not always meet the need, which is particularly visible in tourist season. Numerous challenges direct us to transboundary cooperation and joint approach to problem solving. Water protection is not only the issue of protecting national heritage and ecological priority, but also a political priority to preserve sovereignty over water resources.

HISTORY OF WATER MANAGEMENT Founder: Josip Juraj Strossmayer Founding date: 7 Sept. 1876 – next year will be the 140th anniversary of water management Hrvatske vode were restructured in 1996, after which they have retained as its core water management activity exclusively public service activities, which include: Water regulation and protection from adverse effects of water Water use Water protection Irrigation Drafting planning documents for water management HISTORY OF WATER MANAGEMENT

ACTIVITIES OF HRVATSKE VODE I. Rregulation and protection water management facilities dikes, bank revetments, relief canals, lateral canals, dams with reservoirs, sluices, retentions , owned by the Republic of Croatia, managed by Hrvatske vode II. Amelioration water management facilities basic amelioration drainage facilities (owned by the Republic of Croatia, managed by Hrvatske vode 2.detailed amelioration drainage facilities, irrigation facilities owned and managed by regional self-government units III. Water utility facilities public water supply facilities and public sewerage facilities , owned and managed by public water service provider

PROGRAMME OF MEASURES The Republic od Croatia is a country with abundant water resources; therefore, the indisputable national strategic goal is to protect them and ensure sufficient supplies of clean water for future generations. In achieving this goal, great efforts are made, as well as financial resources invested, to achieve the required standards planned in the Water Management Strategy, which was adopted by the Croatian Parliament in July 2008 as the long-term planning document which defines the vision, mission, goals and tasks of the national policy in the field of water management. The Republic of Croatia, as the latest EU member, had a different position from its predecessors.

PROGRAMME OF MEASURES All experiences and problems which the European Commission encountered with joining of new countries from East Balkans and Baltic countries resulted in more stringent criteria which were applied to the Treaty concerning the Accession of the Republic of Croatia to the European Union. The Republic of Croatia joined the EU in the period when the Black Sea area was declared a sensitive area, which resulted in the requirement that more stringent wastewater treatment conditions are implemented in the entire area of the Danube River. Due to integrated implementation of the adaptation, securing funds and technical equipment of water service providers, it was concluded necessary to consolidate small water service providers, i.e. to implement a reform of the water utility sector.

IMPLEMENTATION OF THE NATIONAL PLAN – DEADLINE FOR COMPLIANCE Sensitivity Agglomeration size (PE) TOTAL 2,000-10,000 10,000-15,000 15,000-50,000 50,000-150,000 >150,000 Black Sea Basin – sensitive area wastewater collection secondary treatment 12 years-31 Dec. 2023 (126 agglomerations) wastewater collection more advanced treatment 9 years-31 Dec. 2020 (10 agglomerations) wastewater collection more advanced treatment 7 years-31 Dec. 2018 (29 agglomerations) wastewater collection more advanced treatment 7 years -31 Dec. 2018 (2 agglomerations) 167 Adriatic basin - sensitive area (discharges on land and part of the sensitive sea) wastewater collection secondary / appropriate* treatment (26 agglomerations) wastewater collection more advanced treatment 9 years-31 Dec. 2020 (5 agglomerations) (8 agglomerations) (0 agglomerations) 39 Adriatic basin – area of the "normal" sea wastewater collection appropriate treatment (53 agglomerations) wastewater collection secondary treatment (16 agglomerations) wastewater collection secondary treatment 7 years-31 Dec. 2018 9 years-31 Dec. 2020 ** (11 agglomerations**) 7 years-31 Dec. 2018 (4 agglomerations) 88 205 31 54 4 294 *- coastal areas ** - coastal agglomerations with a significant share of tourism in total load (> 30%)

AREA SENSITIVITY IN THE REPUBLIC OF CROATIA Agglomerations 10.000-15.000 PE 15.00-150 PE > 150,000 PE Area sensitivity SENSITIVE Eutrophic area Area intended for abstraction of water for human consumption Protected nature area Sensitive area basin NORMAL Normal area Additional bathing water protection area

ANALYSIS OF STATE IN THE WATER UTILITY SECTOR WATER SUPPLY ZONES 376 water abstraction sites 443 local water supply systems 68 water supply zones Water supply zones are determined mainly based on technical analysis of the existing state and water supply development plans Average water supply zone has 65,000 inhabitants and annual water production of approx. 3.8 m3 Large differences between minimal and maximal quantities

ANALYSIS OF STATE IN THE WATER UTILITY SECTOR SEWERAGE Wastewater collection of approx. 329 million m3 Coverage level of public sewerage is 47% Capacity of newly constructed wastewater treatment plants is 4.04 million PE Coverage level of wastewater treatment is 30% of the population 763 sewerage systems were established, of which 294 larger than 2,000 PE

ANALYSIS OF STATE IN THE WATER UTILITY SECTOR PRESENT WWTP CONSTRUCTION LEVEL (WWTP ZAGREB) 140 installed WWTPs, of which 43 have capacity for less than 2000 PE 97 plants are larger than 2000 PE It is necessary to construct 290 plants, i.e. 197 new WWTPs 36 WWTPs have preliminary treatment, which is 1,341,710 ED, i.e. 32.24% Of 140 WWTPs, 117 is operating On 49 WTTPs (secondary and tertiary level), efficiency is evaluated Most plants do not meet treatment efficiency

IMPLEMENTATION OF THE PROGRAMME OF MEASURES Water Management Strategy River Basin Management Plans Multi-annual construction programme for water utility facilities Multi-annual construction programme for regulation and protection water facilities and amelioration drainage facilities Multi-annual programme for monitoring harmonization Annual programmes for maintenance works in protection areas from adverse effects of water RBMP– Programme of measures Flood Risk Management Plan – Programme of measures Public information and participation in the preparation and update of plans and programmes is carried out through public consultation in compliance with requirements of the: Water Framework Directive Flood Directive SEI Directive Strategic environmental impact assessment Strategic environmental impact assessment Conditions, measures and recommendations in relation to nature protection

MULTI-ANNUAL CONSTRUCTION PROGRAMME FOR WATER UTILITY FACILITIES Based on the Implementation Plan for Water Utility Directives – document was prepared by Hrvatske vode and adopted by the Government of the Republic Croatia in Nov. 2010. Represents mandatory part of the programme of measures as part of the RBMP. Its starting point are adopted and agreed activities and deadlines related to the implementation of the EU water utility directives as an integral part of the Accession Agreement.

MULTI-ANNUAL CONSTRUCTION PROGRAMME FOR WATER UTILITY FACILITIES The programme takes into account agreed activities and deadlines and elaborates in detail technical/ implementation/ organization issues. The programme: Defines the framework investment programme in public water supply and public sewerage, Operationalizes the project implementation system to contribute to more efficient utilization of financial, personnel and information / documentation resources available to the Republic of Croatia.

MULTI-ANNUAL CONSTRUCTION PROGRAMME FOR WATER UTILITY FACILITIES Cost analysis: A significant impact on the implementation of the EU water utility directives is also the WFD, which requires water price policy based on the principle of cost recovery for water services. A prerequisite for responsible and efficient water use is water saving and collection of funds for infrastructure maintenance and renewal. Considering the estimated high investment costs and need to introduce water price based on the cost recovery principle (incl. costs of investment, operation and maintenance, depreciation, etc.), the affordability analysis represents the most demanding, and also the most influential part of organizing the implementation of the EU water utility directives.

MULTI-ANNUAL CONSTRUCTION PROGRAMME FOR WATER UTILITY FACILITIES Understanding the water utility sector in the framework of the Implementation Plan for Water Utility Directives (2010) has significantly contributed to better water management planning and understanding of the implementation on the national level. The established and connected database was used for determination of service area boundaries, and presents the basis for further elaboration of activities through the Programme. Identification of priority investment areas, already during the negotiations with the EU, enabled implementation of a series of projects, among which the ones using loan funds from international development banks and EU pre-accession funds seem more significant.

MULTI-ANNUAL CONSTRUCTION PROGRAMME FOR WATER UTILITY FACILITIES The Programme is financially demanding, thus a special attention is paid to models of financing. All sources of financing are directed to the Programme: appropriate EU funds, loans from IFIs, available domestic funds (State Budget, budgets of local self-government units, etc.). A challenge to project shaping/forming is the optimization of burdening the population with new costs, with a desirable highest possible involvement of the EU grants. Attempts are made to prevent the problem /experience of other countries with regard to a reduced absorption capacity in view of the EU funds due to the lack of well prepared projects.

MULTI-ANNUAL CONSTRUCTION PROGRAMME FOR WATER UTILITY FACILITIES Indicators of the Programme results: Increased water supply level of the population. Reduced water losses from public water supply systems. Increased connection level to public water sewerage systems. Increased number of sewerage systems compliant with the standards. Share of the future water price without costs of local cofinancing in NRD (uniform price in a service area)

INVESTMENT CYCLE - WATER UTILITY SECTOR Drinking water directive 68 water supply zones identified (presently 135 companies, 376 abstraction sites, 74% of the population connected to public water supply systems) 443 local water supply systems 14% of the population supplies water from own wells Transitional period -31.12.2018. (3+3+3). 1.355 billion EUR Urban wastewater directive 763 agglomerations identified; 294 larger than 2000 PE (presently 151 companies, 47% of the population connected to public sewerage systems, 30% of the wastewater is treated) Transitional period -31.12.2023. 3.192 billion EUR

INVESTMENT CYCLE - WATER UTILITY SECTOR 2018: it is necessary to build sewerage systems for a total of 47 agglomerations. 2020: it is necessary to build sewerage systems for a total of 26 agglomerations. The total planned WWTP capacity for 294 agglomerations larger than 2000 PE is 7,780,440 PE. WWTPs built through projects will have a total capacity of 6,170,010 PE (79.30%). The total number of inhabitants in agglomerations larger than 2000 PE is 3,260,053. The projects cover the area with 2,417,193 inhabitants (74 %).

OVERVIEW OF PROJECTS IN PREPARATION No. Project name Construction value (EU) No. of projects per implementation year Total Sewerage projects Water supply projects Total Implementation Plan List 39 List 16 List 7 List 9 Other Total Difference – Implementation Plan Project lists were named after the number of projects No. of agglomerations and water supply zones is larger that the number of projects (for the purpose of grouping per water service provider – wider spatial perception) 50% of estimated implementation value for the Urban wastewater treatment directive is initiated

OVERVIEW OF PROJECTS IN PREPARATION Through funds of Hrvatske vode, HRK 260 million was secured up to date for preparation of water utility infrastructure projects at the estimated value of 2.6 billion Euro, through the use of the Structural and Cohesion Funds which Croatia can now use following EU joining. Through defined allocations in the Multi-annual financial framework, we expect annual allocations for water management in the amount of 150-200 million Euro of the EU funds, i.e. the EU Regional Development Fund anticipated a tentative allocation of 1.3 billion Euro in the financial programme period 2014-2020. A large number of projects has a high maturity level. In preparation up to date: 2300 km of detailed designs of water supply and sewerage networks 20 WWTP preliminary designs

EIB and CEB PROJECT WATER UTILITY INFRASTRUCTURE FINANCING Loan amount: 150 million EURO EUR 75 million (EIB) EUR 75 million (CEB) Project financing The project is financed in the ratio 90 %- 10% of the investment value excl. VAT (90% from the bank loan funds, 10% is own participation of final beneficiary, VAT is paid by final beneficiary) Total estimated project cost excl. VAT: 166.7 million EUR EUR 75 million (EIB loan funds) EUR 75 million (CEB loan funds) EUR 16.7 million (own funds of public water service providers)

EIB and CEB PROJECT WATER UTILITY INFRASTRUCTURE FINANCING Project purpose: The project includes investments in water supply systems, wastewater collection and treatment and storm water collection in municipalities located in all Croatian counties, with the exception of the City of Zagreb. Project implementation: Project implementation is planned in the period 2013-2016 for a total of 650 subprojects on the entire Croatian territory. Loan funds: Amount to a total of 150 million EUR0 (75 million EUR CEB, 75 million EUR EIB) Loan funds absorption is planned in 4 tranches. To date, 60 million EUR of bank loan funds have been absorbed (CEB - 30 million EURO, EIB – 30 million EURO) in 2 tranches. In 2015 and 2016, the absorption of the remaining 90 million Euro of the loan funds is planned.

CONCLUSION The implementation of the water utility directives was institutional obligation, but also incentive, not only for institutional and adaptation, but also for technical and technological, organizational, personnel and financial restructuring of Croatian water utility sector. Consolidation of water service providers (utility companies) is a strategic determinant of the Republic of Croatia, and the expected outcomes are increased service level (coverage and quality of public water supply and public sewerage services), rationalization of operation and maintenance costs of public systems (sustainability and development) and related rationalization of water price which the citizens pay.

CONCLUSION Acceptability and implementability of such long-term programme documents, whose content and scope is demanding, depend on coordinated work of initiations in the water sector (national, regional and local level) and timely/ active participation od stakeholders and the general public. Apart form the fact that the national water management policy is implemented through this type of documents, they also follow thematic goals and investment priorities related to environmental protection and/or water management on the EU level, and in this manner secure financial support for their implementation.

THANK YOU FOR YOUR ATTENTION